Professional Documents
Culture Documents
ROBI RFQ-38 SURVEY Feedback - Desk - 11052023
ROBI RFQ-38 SURVEY Feedback - Desk - 11052023
Factor Logic
Less Than
1 e.co colocation dismantle possible Equal
More than
Less Than
2 STL site fiberization possible Equal
More than
3 Last 6 months ISP feasibility (Count) More than
4 Last 6 months ISP feasibility (BW) (Mbps) More than
5 Non Scomm site (count) More than
6 No. of child site count info. By Operator More than
7 Next 1 year fiberization roadmap of telco More than
8 Adhoc (YES/NO) Highest Input
9 Urbanization of Area U. readiness value
= 10 10 5.00% 0.00%
HSIA (Hajrat
10G Shahjalal International Airport) 3rd terminal-Ph-1
10G
0 0
0 0
0 0
0 0
0 0
2.074 2074 0
0
0
0
Existing Fiber
Existing Fiber New Fiber without New Fiber_Pole New Fiber_Pole
Information_Nu
Information_Num Vertical_Required New Available Distance Unavailable Distance
mber of Core
ber of Core Used Fiber Distance (m) (m) (m)
Available
0
0
0
4 8 1193 1193 0
New OH Fiber Information
New
New Fiber_Vertical
New Fiber_Path Fiber Type Required New
New Fiber_No. of Fiber_Vertical Fiber Type
(Normal /Messenger) & UG_HDD
OH Pole Required Fiber (Normal
Core(mention by RIO) Distance (m)
Distance (m) /Messenger) &
Core
Required New Required New Required New New UG Fiber No. of UG Pole
New Required
UG_Open Cut UG_Duct UG_Fiber Type Required/ UG
Encloser
Distance (m) Distance (m) Distance (m) (48/144/432) pole activation
10 2
Other Infromation
For
Relocation_Old SPOF Geographical
Type of SPOF
Site to new site Distance Challenges
distance(m)
0
Other Infromation
Feasible 3
Feasible 5
RIO_Fiber
After Change Remarks
Change
Dismantle(m) Scomm RIO & NPD
Proposal
New Proposed EP required for Bhat Para Bazar HH & This is the desk survey & materilas should be more or less
Capacity
Remarks
Current Capacity(Mbps) ACX 1000 ACX1100
(for Operator)
ld be more or less
ACX2100 ACX-2200 ATN 910 B-D ATN 910 C-F ATN 910 B
ATN 910 B-F ATN C-G (6 Port) 1G_Single Core_SFP_20 km 10G_Single
Core_SFP_40 km
10G_Dual
10G_Single 1G_Dual Core_SFP_10 10G_Dual 10G_Dual Core_SFP_80
Core_SFP_60 km km(current capacity) Core_SFP_20 km Core_SFP_40 km
km
e.co STL site Last 6
Client
SFP (10G dis thanna colocation fiberizati months ISP
dismantle on feasibility
20km) possible possible (Count)
Non No. of child Next 1 year
Last 6 months Adhoc
Scomm site count fiberization
ISP feasibility Adhoc Scale
(BW) (Mbps)
site info. By roadmap of (YES/NO)
(count) Operator telco
Urbanization Result Strategically
of Area Go Call