Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 19

Sl. No.

Factor Logic

Less Than
1 e.co colocation dismantle possible Equal
More than
Less Than
2 STL site fiberization possible Equal
More than
3 Last 6 months ISP feasibility (Count) More than
4 Last 6 months ISP feasibility (BW) (Mbps) More than
5 Non Scomm site (count) More than
6 No. of child site count info. By Operator More than
7 Next 1 year fiberization roadmap of telco More than
8 Adhoc (YES/NO) Highest Input
9 Urbanization of Area U. readiness value

 Strategically Go Call (yes/no)


Percentage
Value Weight With Without
Adhoc Adhoc
< 1 0
= 1 8 15.00% 15.00%
> 1 10
< 1 0
= 1 8 20.00% 20.00%
> 1 10
> 10 10 15.00% 15.00%

> 200 10 15.00% 15.00%

> 10 10 15.00% 15.00%

> 3 10 2.50% 2.50%

> 10 10 2.50% 2.50%

= 10 10 5.00% 0.00%

= 100 10 10.00% 15.00%


100% 100%
From >>>>> To Result
1.00% 25.00% Never
o) 25.00% 50.00% May be
50.00% 75.00% Likely
75.00% 100.00% Most Likely
Ring No FROM BTS TO BTS

Robi RFQ IBS Ring-007 DHUTT032JNR01_DHUTD3 Metro rail station


Robi RFQ IBS Ring-007 Metro rail station DHUTT027JNR01_DHUTAH
EB_Dhaka _Dhaka _Biman
Robi RFQ IBS Ring-008 DHBIM012JNR01_DHUTA1 Bandar
HSIA (Hajrat Shahjalal
EB_Dhaka _Dhaka _Biman
Robi RFQ IBS Ring-008 International Airport) 3rd
Bandar
terminal-Ph-1
HSIA (Hajrat Shahjalal
Robi RFQ IBS Ring-008 International Airport) 3rd DHBIM021JNR01_DHBBKI
terminal-Ph-1
EB_Dhaka
Robi RFQ IBS Ring-011 NSSDR009HTR01_NSSDR04
_Narsingdi_Panchdona
EB_Dhaka
Robi RFQ IBS Ring-011 NSPAL006HTR01_NSPLS02
_Narsingdi_Panchdona
4 UG POC Infromation

Depended Site( Have


Total Number of sites
Ring Capacity Total Uniquesite to cosider this site for UG Info_FROM POC
in a Ring
connect new site)

10G Metro rail station


10G
10G EB_Dhaka _Dhaka _Biman Bandar

HSIA (Hajrat
10G Shahjalal International Airport) 3rd terminal-Ph-1

10G

10G EB_Dhaka _Narsingdi_Panchdona

10G Bhat Para Bazar Proposed EP


UG POC Infromation Total fiber information Existing UG

Total Link Distance


Total Link Distance
[UG(Ext+New) + OH
UG Info_TO POC [UG(Ext+New) + OH UG Fiber Distance(m)
(Ext+New) + Vertical]
(Ext+New) + Vertical] (m)
(km)

0 0
0 0
0 0

0 0

0 0

2.074 2074 0

NSPLS02 6.717 6717 4838


Existing Fiber Information

Existing Fiber Existing Fiber


Existing Fiber Existing Fiber
Information_Non Existing Fiber Information_Total Core
Information_Tota Information_Fiber
Usable OH Fiber Information_Usable of
l OH Fiber Type (Normal /
Distance (m) (with OH Fiber Distance fiber( 4/6/12/24/48/144
Distance (m) Messenger )
core info.) /432)

0
0
0

1821 0 1821 Normal & Messenger 4 & 12

586 0 586 Messenger 12


New OH Fiber Inform

Existing Fiber
Existing Fiber New Fiber without New Fiber_Pole New Fiber_Pole
Information_Nu
Information_Num Vertical_Required New Available Distance Unavailable Distance
mber of Core
ber of Core Used Fiber Distance (m) (m) (m)
Available

0
0
0

3&8 1&4 153 153 0

4 8 1193 1193 0
New OH Fiber Information
New
New Fiber_Vertical
New Fiber_Path Fiber Type Required New
New Fiber_No. of Fiber_Vertical Fiber Type
(Normal /Messenger) & UG_HDD
OH Pole Required Fiber (Normal
Core(mention by RIO) Distance (m)
Distance (m) /Messenger) &
Core

0 Normal & 6F 100 Normal & 12F

0 Messenger & 6F 100 Normal & 12F


New UG Fiber Information

Required New Required New Required New New UG Fiber No. of UG Pole
New Required
UG_Open Cut UG_Duct UG_Fiber Type Required/ UG
Encloser
Distance (m) Distance (m) Distance (m) (48/144/432) pole activation

10 2
Other Infromation

For
Relocation_Old SPOF Geographical
Type of SPOF
Site to new site Distance Challenges
distance(m)

0
Other Infromation

Permission Requirement Feasibility Call ( Feasible/ Not


Approx Deployment Time Line
Details Feasible )

Feasible 3

Feasible 5
RIO_Fiber
After Change Remarks
Change
Dismantle(m) Scomm RIO & NPD
Proposal

This is the desk survey & materilas should be more or less

New Proposed EP required for Bhat Para Bazar HH & This is the desk survey & materilas should be more or less
Capacity

Remarks
Current Capacity(Mbps) ACX 1000 ACX1100
(for Operator)

ld be more or less

sk survey & materilas should be more or less


Existing site device model on basis of current Capacity

ACX2100 ACX-2200 ATN 910 B-D ATN 910 C-F ATN 910 B
ATN 910 B-F ATN C-G (6 Port) 1G_Single Core_SFP_20 km 10G_Single
Core_SFP_40 km
10G_Dual
10G_Single 1G_Dual Core_SFP_10 10G_Dual 10G_Dual Core_SFP_80
Core_SFP_60 km km(current capacity) Core_SFP_20 km Core_SFP_40 km
km
e.co STL site Last 6
Client
SFP (10G dis thanna colocation fiberizati months ISP
dismantle on feasibility
20km) possible possible (Count)
Non No. of child Next 1 year
Last 6 months Adhoc
Scomm site count fiberization
ISP feasibility Adhoc Scale
(BW) (Mbps)
site info. By roadmap of (YES/NO)
(count) Operator telco
Urbanization Result  Strategically 
of Area Go Call

You might also like