Sample QP Received From Binoy

You might also like

Download as pdf
Download as pdf
You are on page 1of 4
ficient of -0.25%6°C and an open The Standard 1, ndard oan *st Condition (s os STC) define the b a he behavisrota pV meduleat Ratio of maxi renelchors eat PY device output p itaee Suit electric currerg, Pome" (YTP*Imp) to the product of open circuit WOHAS 6. Anisolated inverter 7. One of the advantage of string inverte To optimize the working of ec 8. Th }€ maximum power point trackers MPPT is: A control strategy where by the electric current and voltage yields 1 = consider the installation of 2 PY to install that makes the 9. A household has a consumption of 13600 kWh/vear plant that produces 1700 kWh / kWp, which is the maximum size net metering fully profitable: 8.0 kWp Ina silicon PV module, if the cell temperature increase The output voltage decrease 10. 11, The Bypass diode is installed in each: PV Module ig to IEC 61215 shall withstand at least static load of: 12. A PV module tested accordin, 2400 Pa = 240kg on the front & back of the module nation between inverter & PV generator, it is important: voltage of the string is lowe he me 13, For a.good coordit That the maximum open circut voltage of the inverter. 44, Who carries out testing during with interconnection inspection and performance tes Solar Contractor exercise Day 2 45. During the mainte, Nance or confirm who is sai | Nstallatioy fe amon, ~ below peaye PY array, assuming any part touched is eae People (Dashed tine indicate multiple doubles in se AM Ae f | pt Only person A is safe. 16. An interface protection is A voltage & frequency protection (with further protection) 17. A DC circuit under load in PV plant must never be opened: auplgadl By those switches or connectors which rating cannot be operated unde! A PV plant will have to disconnect from the grid Wf the frequency falls outside the range 47.5 — 52.5 H2. lectric shock or arc to PV modules or 4/26, the insulation resistance of a PY string propo peasured by applying the test voltage: eater @ grid connect system should be 27. With Low Voltage Ride Through (VR) it tes itis meant 18, As per DEWA connection s 28. As pI tion standards, the su Phort of reactive power f inverter is required Exam Day — Day 3 29. Interface Protection sense volt: a) Solar inverter Output Side b) Network ¢) Solar Array Outpu de 30. The solar grain boundaries red f laries reduce performance, cr flows in a a) Mono Crystalline Solar Cel b) Multi Crystalii Thin Film Solar Cell 31. A small industry has a consumption of 100,0 Wh / year, Inst an annual production 1,700 kWh / kp is consi system to install that makes the net metering fully profitab a) 100,000 x 1700 / 1000 = 170,000 kWp b) 1700%365.25 / 100,000 =6.2 kWp ) 100,000 /1700 = 58.8 kw dered, which is the maximum size of the PV en rack mounted PV module 3), NOCT is the temperature reached by open circuited cell in an op under the following reference environment 2) 1000 W/m? Cell Temp. = 25°C, Wind Speed = 1 m/s b) irradiance 800 W/m*, Ambient Tem ‘¢)_Irradiance 1000 W/m?, Ambient Temp. = 25°C, Wind Speed =1 m/s 33, AM LS is the term used for air mass under which of the following consideration for the solar light path: a) The solar has 50% of light reflected into air, hence con LS b) The distance from the sun to the tilted surface at 37° with zenith angle at 48° is 1. sidered at 1.5 times. times. <) The distance from atmosphere entry point to thy angle at 48° is 1.5 times. ch, under sunlight with connection of 20 panels in 34, * PV modules with VOC more ‘than 40V ea series, Which safety practice Is r a) First disconnect DC breaker b) First disconnect the plug in connector of the 1 cc) First disconnect the string fuse equired before doing maintenance electrically 0 solar module in the string, * PV array of open circuit voltage 1100V at 0°¢ { YC for installation, which of th sit is acceptable A installed: Ground mounte €) Roof mounted with inverter r 36. Which of below single phase sotar syst 38, a * In case of sola emergency manual a) ACDi 39, A Pyranometer measurement is u b) Tohelp calculate electrical efficiency of t ar €) Tohelp calculate Fill Factor « ar 0, As per DEWA requirements Loss of M: 7 a) Means of Rate of Change of Frequen ) only b) Means of Vector Shift Only c) Means alternatively of Ai As pershams Dubai Standard, the component that shall include the ability Wwith protocol IEC 61850, finalized to remote trippi a) Solar Generation Smart Meter b) Interface Protectio c) Net Metering Smart Meter 442. European Efficiency is calculated weighted average with mes 3) Ofefficiencies of various percentage of rated MPP v b) Ofefficiencies taken at different places in Europe ¢) Ofefficiencies of various percenta

You might also like