ficient of -0.25%6°C and an open
The Standard 1,
ndard
oan *st Condition (s
os STC) define the b
a he behavisrota pV meduleat
Ratio of
maxi
renelchors eat PY device output p itaee
Suit electric currerg, Pome" (YTP*Imp) to the product of open circuit WOHAS
6. Anisolated inverter
7.
One of the advantage of string inverte
To optimize the working of ec
8. Th
}€ maximum power point trackers MPPT is:
A control strategy where by the
electric current and voltage yields 1
= consider the installation of 2 PY
to install that makes the
9. A household has a consumption of 13600 kWh/vear
plant that produces 1700 kWh / kWp, which is the maximum size
net metering fully profitable:
8.0 kWp
Ina silicon PV module, if the cell temperature increase
The output voltage decrease
10.
11, The Bypass diode is installed in each:
PV Module
ig to IEC 61215 shall withstand at least static load of:
12. A PV module tested accordin,
2400 Pa = 240kg on the front & back of the module
nation between inverter & PV generator, it is important:
voltage of the string is lowe he me
13, For a.good coordit
That the maximum open circut
voltage of the inverter.
44, Who carries out testing during with interconnection inspection and performance tes
Solar Contractorexercise Day 2
45. During the mainte,
Nance or
confirm who is sai |
Nstallatioy
fe amon, ~
below peaye PY array, assuming any part touched is eae
People (Dashed tine indicate multiple doubles in se
AM Ae f
|
pt
Only person A is safe.
16. An interface protection is
A voltage & frequency protection (with further protection)
17. A DC circuit under load in PV plant must never be opened: auplgadl
By those switches or connectors which rating cannot be operated unde!
A PV plant will have to disconnect from the grid
Wf the frequency falls outside the range 47.5 — 52.5 H2.
lectric shock or arc
to PV modules or4/26, the insulation resistance of a PY string propo
peasured by applying the test voltage: eater
@ grid connect system should be
27. With Low Voltage Ride Through (VR) it
tes itis meant
18, As per DEWA connection s
28. As pI tion standards, the su
Phort of reactive power f
inverter is required
Exam Day — Day 3
29. Interface Protection sense volt:
a) Solar inverter Output Side
b) Network
¢) Solar Array Outpu
de
30. The solar grain boundaries red f
laries reduce performance, cr
flows in a
a) Mono Crystalline Solar Cel
b) Multi Crystalii
Thin Film Solar Cell
31. A small industry has a consumption of 100,0 Wh / year, Inst
an annual production 1,700 kWh / kp is consi
system to install that makes the net metering fully profitab
a) 100,000 x 1700 / 1000 = 170,000 kWp
b) 1700%365.25 / 100,000 =6.2 kWp
) 100,000 /1700 = 58.8 kw
dered, which is the maximum size of the PV
en rack mounted PV module
3), NOCT is the temperature reached by open circuited cell in an op
under the following reference environment
2) 1000 W/m? Cell Temp. = 25°C, Wind Speed = 1 m/s
b) irradiance 800 W/m*, Ambient Tem
‘¢)_Irradiance 1000 W/m?, Ambient Temp. = 25°C,
Wind Speed =1 m/s
33, AM LS is the term used for air mass under which of the following consideration for the solar
light path:
a) The solar has 50% of light reflected into air, hence con
LS
b) The distance from the sun to the tilted surface at 37° with zenith angle at 48° is 1.
sidered at 1.5 times.
times.
<) The distance from atmosphere entry point to thy
angle at 48° is 1.5 times.
ch, under sunlight with connection of 20 panels in
34, * PV modules with VOC more ‘than 40V ea
series, Which safety practice Is r
a) First disconnect DC breaker
b) First disconnect the plug in connector of the 1
cc) First disconnect the string fuse
equired before doing maintenance electrically
0 solar module in the string,* PV array of open circuit voltage 1100V at 0°¢ {
YC for installation, which of th sit
is acceptable
A
installed:
Ground mounte
€) Roof mounted with inverter r
36. Which of below single phase sotar syst
38, a
* In case of sola
emergency manual
a)
ACDi
39, A Pyranometer measurement is u
b) Tohelp calculate electrical efficiency of t ar
€) Tohelp calculate Fill Factor « ar
0, As per DEWA requirements Loss of M: 7
a) Means of Rate of Change of Frequen ) only
b) Means of Vector Shift Only
c) Means
alternatively of
Ai As pershams Dubai Standard, the component that shall include the ability
Wwith protocol IEC 61850, finalized to remote trippi
a) Solar Generation Smart Meter
b) Interface Protectio
c) Net Metering Smart Meter
442. European Efficiency is calculated weighted average with mes
3) Ofefficiencies of various percentage of rated MPP v
b) Ofefficiencies taken at different places in Europe
¢) Ofefficiencies of various percenta