SPARK STAR-33 Station Fault
SPARK STAR-33 Station Fault
SITUATION:
At 132/33 KV Grid Station, THREE nos of distribution transformer of 250KVA, 33/0.4 KV each
are connected from 33 KV Bay for the purpose of supplying of LT voltage for different
applications (Lighting Load and SCADA connection and others Load to the adjacent building).
One day there had been Phase to ground fault on B phase conductor at the nearby end
Transformer Premises, which resulted severe damages, sparks, flashes on the LT systems.
Observations:
TASK:
Planning was done to attend the issues and extend permanent solution to the
cause of such incident.
1.Both 132kv main incoming supply were hand tripped, due to the failure of DC supply at this
GRID So the Grid was undergone with FORCED BLACKOUT.
2. Tracing of all blown fuses was done and replaced with good one.
3. DG set was taken into service for Aux AC supply to the system.
4. Blown fuses of 132KV Bus PT was also replaced.
5. The snapping Bph wire was rectified.
6. The Earth Links were tightened and GI Earth wires were resized to its place.
SPARK/STAR/2023/33
7. After availing the Main DC supply, the 33 KV station transformer and other feeders were
charged in successive manner and stood OK.
8. EARTH FLAT connection from REMOTE TRANSFOREMER PREMISES (50 meters
from this Grid Premises) to GRID MAT was done before energization of REMOTE
TRANSFORMER system.
The detail investigation, was done on the Earthing System at REMOTE END Transformer
Premises and available Transformers, Structures and others.
1. NO Earth Pits were found, as inquired from DISCOM WING that the Pits are being in
buried manner.
2. NO Earth Mat at this premises.
3. The Earth flats connected to the panels were in slight loose connection as confirmed
due to sparking on these points.
4. No any defined Structure Earthing, even 0.415 KV side Transformer Neutrals.
Because of this improper Earth loop, the closed path from the driving source became poor
and resulting with HIGH VOLTAGE appearance on the Earth Point, called GPR (Ground
Potential Rise). The earthing on 33 KV B phase, resulted the voltage rise on the healthy (R
and Y). Simultaneously, the Voltage on the DELTA winding of the station Transformer also
became high on the RY Phase as compared to the YB and BR phases.
Now the reflection of this voltage on the LT side (Star connected) became prominent due to
the weak and separate Earth connection. The Individual voltage on the healthy R and Y
phases became very high causing the failure and damage of the items as described above.
The other reason of Failure is also that rushing of fault current at different weak elements
(Like GPS UNITs, MODEMS, Electronics Relay etc..) to Source Ground
Stn TFR
R Y B
2 33 KV of Power
V2 TRF Transformer
V6
V5
V4 V1
V3
V6
V3
SPARK/STAR/2023/33
RE-OCCURRENCE OF THE INCIDENT ON SAME the DAY :
1. During first incident, on of the GI Earth Wires out of 2 nos from DISCOM DP Structure
were being in damaged condition, not noticed properly as the string was damaged at
the bottom point as like shown in figure.
2. The system was charged from Grid end to avail Aux AC supply from the Station
transformer at the grid premises along with other 2 Nos of Transformers at REMOTE
END premises. The LT loads were not extended to the system.
3. The incident repeated coincidentally at the time of extension low light load from the
ACDB board.
4. Accidentally the damaged Earth GI wire slides down touching the same B phase
conductor resulting with flash over at the spot and total damage of GI earth wire.
5. This time the fault current on GRID side was reflected with 8 Kamp, causing with
outage of both 33 KV side of Power Transformers and simultaneously the 33 KV VCB
of Station Transformer Bay from Grid end.
6. But this time only it was found with FLASH OVER of the MODEM ROUTER BOX at
GRID PREMISES.
Proper Earthing with MAT connection with Relay gradation and renovation of the
DISCOM structures at REMOTE ENDTRANSFORMER PREMISES were done. Bith
Remote and Local GRID MAT allowed for INTER_CONNECTION to avoid GPR (Ground
Potential Rise)
After provision of REMOTE END EARTH MAT and inter-connection, this problem
was resolved.
RECOMMENDED SOLUTIONS:
SPARK/STAR/2023/33
SNAPSHOTS OF DAMAGES AT THIS GRID PREMISES
BURNING OF MCCB AT
REMOTE ENDSWITCH BURNING OF EARTH SPARKING AT
YARD TERMINAL POINT DP STRUCTURE
SPARKING AT
SPARKING AT SPARKING AT
PANEL BOX
PANEL BOX AB SWITCH HANDLE
SPARK/STAR/2023/33