TITLE :- B.O.

M FOR FABRICATION & ERECTION OF STRUCTURAL LIFT SHAFT, WALKWAY & CANOPY
CLIENT :- MS BIPROTONICS
SLNO. DESCRIPTION L(M) W(M) H(M) NO. U/W UNIT QUANTITY RATE AMOUNT
STRUCTURAL LIFT MS B.O.M
1 S.H.S 180X180X8 33.75 1 1 4 41.91 KG 5657.85
2 R.H.S 66X33X2.9 6.4 1 1 32 4.07 KG 833.536
3 R.H.S 172X92X4.8 6.4 1 1 1 18.71 KG 119.744
4 R.H.S 145X82X4.8 1.45 1 1 2 15.92 KG 46.168
5 ISA 65X65X6 0.06 1 1 128 5.8 KG 44.544
6 340X340X20 BASE PL. 0.34 0.34 0.02 4 7850 KG 72.5968
7 150X400X10 SPLICE PL. 0.15 0.4 0.01 96 7850 KG 452.16
8 740X100X10 CLAMP 0.74 0.1 0.01 68 7850 KG 395.012
9 150X50X10 STIFFENER 0.15 0.05 0.01 32 7850 KG 18.84
10 4mm CHEQUERED PLATE 2.3 2 1 1 35 KG 161
TOTAL MS CONSUMPTION FOR MS LIFT 7801.4508
11 M8X150 HAS-U HIT RE BOLTS 1 1 1 108 1 NOS 108
12 500 XM20 8.8 GRADE F.B 1 1 4 8 1 NOS 32
13 16mm TOUGHEN GLASS 30 1.805 1 1.1 1 SQM 59.565
14 ACP WITH CERA BOARD 30 6.025 1 1.1 1 SQM 198.825
GANG WAY 900mm PROJECTION
1 ISMB 100 0.905 1 1 82 11.5 KG 853.415
2 R.H.S 66X33X3.2 75 1 1 5 4.93 KG 1848.75
3 INSERT PLATE 175X225X10 0.175 0.225 0.01 82 7850 KG 253.456875
4 ISA 65X65X6 0.06 1 1 410 5.8 KG 142.68
5 4mm CHEQUERED PLATE 72 0.9 1 1 35 KG 2268
6 25 N.B (M) 295 1 1 1 2.5 KG 737.5
TOTAL MS CONSUMPTION FOR GANGWAY & CANOPY 6103.801875
7 M10X150 HAS-U HIT RE BOLTS 1 1 4 82 1 NOS 328
8 ROOF SHEETING 72 0.91 1 1.15 1 SQM 75.348
GANG WAY 900mm PROJECTION
1 EARTHWORK IN EXCAVATION 3.91 2.01 2.25 1 1 CUM 17.682975
2 BACKFILL 17.68298 0.4 1 1 1 CUM 7.07319
3 DRESSING & COMPACTION 3.91 2.01 1 1 1 SQM 7.8591
4 COARSE SAND FILLING 2.91 2.01 0.15 1.33 1 CUM 1.16689545
5 B.F.S 2.91 2.01 1 1 1 SQM 5.8491
6 POLYTHENE SHEET 2.91 2.01 1 1 1 SQM 5.8491
7 R.C.C WORK
RAFT 2.91 2.01 0.3 1 1 CUM 1.75473
PEDESTAL 0.38 0.38 0.2 4 1 CUM 0.11552
WALL 4.32 0.15 1.725 1 1 CUM 1.1178
LIFT TOP 2 2.3 0.075 1 1 CUM 0.345
8 SHUTTERING
RAFT 2.91 2.01 0.3 1 1 SQM 2.952
PEDESTAL 0.38 0.38 0.2 4 1 SQM 1.216
WALL 4.32 0.15 1.725 1 1 SQM 14.904
LIFT TOP 2 2.3 0.075 1 1 SQM 0.645
9 REINFORCEMENT 3.33305 0.0135 1 1 7850 KG 353.2199738
10 DISMANTLING WORK
PAVEMENT DISMANTLING 3.91 2.01 0.15 1 1 CUM 1.178865
DOOR OPENING 1 2.1 0.25 3 1 CUM 1.575
11 RUBBISH CLEANING 1 1 1 1 1 L.S
12 NEAT CEMENT 4.32 0.15 1.725 1 1 SQM 14.904