Fan Coil Unit System

Checklist
This checklist should be used and com pleted throughout the project, and its
different stages, delivery, storage, installation & pre -comm issioning , before the
functional testing occurs.

Project Name:

Date:

Equipment ID.

Contents
Contents ................................ ..................................................................... 1

Delivery Inspection ................................ ...................................................... 3

Storage Inspection ................................ ....................................................... 5

Storage Area ............................................................................................ 5

Storage of Fan Coil Unit ................................................................ ............ 6

Pre -Installation Inspection ................................................................ ............ 7

Maintenance/Access .................................................................................... 9

Pre -Com m issioning Inspection .................................................................... 10

General ................................ .................................................................. 10

Electrical General ................................ ................................................... 10

Controls System /Motorized Dam pers & Interlocks ....................................... 11

Fresh Air Supply [Direct] ................................................................ .......... 12

Fresh Air Supply [AHU] ............................................................................ 13

System Fire Dam pers .............................................................................. 14

Filters ................................ .................................................................... 14

Supply Air Fan ................................................................ ........................ 15


1 FCU Checklist
Cooling Coil............................................................................................ 16

Heating Coil ........................................................................................... 18

Refrigerant Dx Coil System ................................ ...................................... 20

Condensate drain/siphon ................................................................ ......... 21

Electric Heater ................................................................ ........................ 22

Supply Air Ductwork ................................................................................ 22

Return Air Ductwork ................................................................................ 23

Controls ................................................................................................. 24

2 FCU Checklist
Delivery Inspection
Once the Fan Coil Unit arrives at the site, usually delivered by a transport
com pany, the following should be checked with the driver b efore being accepted
into storage .

Any noted dam age should be reported to the manufacturer/supplier within 3 days
in writ ing, supported with photographs.

Ref Inspection/T ask Yes/No Notes


/[n/a]

1 Supplier's consolidated delivery


ticket is available, showing all
equipm ent and ancillaries for
inspection and being used to
check.

2 Copy of the order issued to the


supplier is available for reference
and is being used to check .

3 Equipm ent is packaged and crated


in separate boxes for maxim um
protection

4 The unit nam eplate and details


m atch the purchase order

5 Delivery p rotection is dry

6 Unit/s are dry internally

7 The external casing of the unit /s


are undamaged

8 All pipework connections are the


correct size

9 Pipework connections are


undam aged

3 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

10 All pipework handing 's are correct

11 All ducting connections are the


correct size

12 All ancillaries [valves, actuators,


dampers, filters ] included in
delivery as per the order and
delivery note

13 Spin the fan blades to ensure not


damaged and out of line

14 Check all coils for damage


externally and internally

15 Check drip pan/condensate pan


for damage , including insulation.

16 If purchased, check plenum s for


damage and ensure they are the
correct sizes & spigots.

17 Replace an y protection that has


been rem oved

4 FCU Checklist
Storage Inspection
Storage Area
If the equipm ent is to be placed into storage on -site before installation , there will
be an inspection com pleted checking the following.

Ref Inspection/T ask Yes/No Notes


/[n/a]

1 The area is internal and will not


be affected by the weather.

[if t he unit is not r at ed for ext er nal us e]

2 The surface where the equipment


is to be placed is flat.

3 The equipment will be raised from


the floor to allow airflow and stop
the risk of water ingress .

4 The area is well covered and


protected.

5 The area is well ventilated and


has no risk of high hum idity .

6 The area is clean & dust-free.

5 FCU Checklist
Storage of Fan Coil Unit
Prior to the units being placed into storage , the following should be checked.

Ref Inspection/T ask Yes/No Notes


/[n/a]

1 Units will not be stacked .

2 Units will not have materials


stacked on them .

3 All ancillaries wi ll be placed in a


safe and secure location , so item s
do not go m issing or get
damaged .

4 All original packaging is intact and


not removed.

5 Pipework caps are not rem oved .

6 Ductwork connections a re covered


to stop the ingress of dirt and
foreign objects

7 Unit and all com ponents placed on


a flat surface .

6 FCU Checklist
Pre-Installation Inspection
Prior to the units being installed , the following should be checked.

Ref Inspection/T ask Yes/No Notes


/[n/a]

1 The slab/wall/ base is ready, flat ,


and level & can b ear the weight of
the installatio n and bracketry .

2 If being installed above a n


existing ceiling, ensure that there
is enough space through the
ceiling grid to install the unit and
ancillaries .

3 The room /area is dry and


watertight.

4 The a rea being installed is not


prone to flooding or ponding of
water.

[f or w a ll mo u nt e d/f l oo r mou n te d u ni ts ]

5 The room /area the unit will be


installed into is clean and dust -
free.

If there is dust/construction work,


then the unit should be protected.

6 If the unit has a ventilation


supply, ensure it is installed ready
for connecting , or the louver has
been installed , if direct fresh a ir.

7 The installation of the unit will not


im pede the installation of the
condensate trap/pipework , and the
pipework run vs . fall required will
be achievable .

7 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

8 All connections,
pipework/ductwork , etc., can be
independently supported and not
supported by the unit.

The b est practice is to install self -


supporting brackets prior to the
connection of the unit

9 Ensure that all access doors are


clear and not blocked from
brackets or other services , where
required.

10 Check to ensure that all


connections kits containing -
gaskets, bolts, cleats, screws are
available to allow bolting up of the
equipm ent and ancillary
equipm ent.

11 Rem ove all transpo rt feet and


bolts.

12 Check that all required cabling is


available for
connection [power/controls].

8 FCU Checklist
Maintenance/Access
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 There is enough space allowed


around and above /below the unit
once installed to perform
m aintenance and rem ove
com ponents.

[check t he manuf act ur er 's maint enanc e


ins truc ti o ns f or r eq u ir e me nts ]

2 All doors can be fully opened , and


panels are rem oved to gain
access to the unit .

3 Check that there is enough space


for coils, fans, and filters to be
rem oved and replaced .

4 If the unit is m ounted at high


level, confirm that there is a safe
m anner to rem ove the parts and
com ponents and that there is
enough space at high level and at
the floor level to allow this.

9 FCU Checklist
Pre-Commissioning Inspection
Once the equipm ent has been installed and prior to the functional testing and
comm issioning phase taking place , the following will be checked.

General
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 Docum ent the information of the


unit from its name plates and
cross-reference with the specified
inform ation to ensure correct.

2 Ensure the unit is level.

3 All-access doors /panels can be


open and closed with no gaps or
leakage.

4 Check that all transport bolts and


feet are rem oved.

5 External supply/extract louver, if


being used, is installed and fixed
with no air gaps.

6 All vibration m ounts installed

7 Seism ic restraints, where


required, installed.

8 Unit and all com ponents , including


valves and controls , are labeled in
line with the project nam ing
convention.

9 Operation and startup m anual for


the Fan Coil Unit available .

Electrical General
10 FCU Checklist
Ref Inspection/T ask Yes/No/[n/a] Notes

1 Unit and com ponents are


fully earthed in line with
the m anufacturer's
instructions.

2 Earthing has been tested

3 Em ergency disconnect
installed for each
com ponent in line with
NFPA/local code
requirem ents

4 Electrical voltage from the


site m atches the unit
required voltages.

5 All cabling is installed and


connected on the correct
containm ent/raceways and
not damaged.

6 All cabling has been


tested/torque tested.

7 A local m otor control panel


[LMCP] has been installed

8 The local motor control


panel has been electrically
tested

9 All electrical cabling is


labe led in line with the
project nam ing convention.

Controls System/Motorized Dampers & Interlocks

11 FCU Checklist
Ref Inspection/T ask Yes/No/[n/a] Notes

1 Motorized dam pers


installed as per the
drawings and open/close
freely.

2 All controls and panels


have been installed to
operate the m otorized
dampers

3 Fire trip has been installed


and operating/interlocked
with the ventilation system .

Fresh Air Supply [Direct]


This will cover F an Coil Units that are installed connected directly to the outside
to draw in the fresh a ir.

Ref Inspection/T ask Yes/No Notes


/[n/a]

1 The p osition of the intake louver


is in line with the design
requirem ents and positioned so
as it will not be affected by any
exhaust air.

2 Weather louv er/roof cowl


installed and weather tight with
relevant mesh and is
unobstructed.

3 Weather louv er installed with


correct m esh.

4 Weather louv er m esh-free area


m eets the design requirements

5 Plenum installed connecting the


louver to the ducting.

12 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

6 Plenum has drain installed with


trap to rem ove any unwanted
ingress of water

7 Plenum has access hatch/s


installed to allow future
m aintenance and inspections

8 All fresh air ductwork is


installed , corre ct size , and
connected to the unit with
correct fixings

9 All attenuators are installed as


shown on the drawings.

10 All non-return dam pers are


installed as per construction
drawings.

11 All volum e control dam pers are


installed as per construction
drawings.

12 Ductwork insulated and vapor


seal in line with the
specification .

13 Test holes available in the duct


to allow air readings

Fresh Air Supply [AHU]


This will cover F an Coil Units that are installed connected to an AHU system that
supplies its fresh air.

Ref Inspection/T ask Yes/No Notes


/[n/a]

1 The p osition of ducting is in line


with the design requirem ents .

2 Plenum installed , allowing the


connection of the supply ducting
to the ducting.

13 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

3 All fresh air ductwork is


installed , corre ct size , and
connected to the unit with
correct fixings

4 All fre sh air has been balanced


and provid ing the correct am ount
of airflow at the required
tem perature as per design.

5 All attenuators are installed as


shown on the drawings.

6 All non-return dam pers are


installed as per construction
drawings.

7 All volum e control dam pers are


installed as per construction
drawings.

8 Ductwork insulated and vapor


seal in line with the
specification .

System Fire Dampers


Ref Inspection/T ask Yes/No Notes
/[n/a]

1 Check that th e fire dampers are


installed , as per the drawings ,
and have been tested in line with
the project requirem ents.

Filters

14 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 Filter m ounting frames are clean


and dust free.

2 Panel filters are installed, clean ,


and are of the correct grade.

3 Filters have the correct sealing


gaskets installed.

4 The filters are not jamm ed in the


rails

5 All com ponents upstream of the


filter are clean and dust -free

6 Panel filters are locked in place

7 Differential pressure sensors are


installed and calibrated.

Supply Air Fan


Ref Inspection/T ask Yes/No Notes
/[n/a]

1 Electrical connections and


cables are com plete , fully tested ,
and torqued in line with
project /m anufacturer
requirem ents

2 Motor protection installed and


operating [Overload]

3 Motor protections calibrated

4 Voltage from electrical system s


is correct for the unit
requirem ents [within +/ -10%]

15 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

5 The fan housing is clean and


dust-free

6 Fan, blades, and m otors are


clean and dust -free.

7 Fan belt tension is correct

8 Fan belt condition is good

9 Check the tightness of fixings


[torque]

10 Im peller is balanced

11 Fan/motor rotates in the correct


direction with no obstructions [by
hand]

12 Fan/motor rotates in the correct


direction with no obstructions
[electrically bum p unit on ]

Cooling Coil
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 The cooling coil is clean , in good


con dition , and the fins
undam aged.

2 Ensure that the pipework is the


connected and correct size

3 Ensure that the flow and return


pipework handing s are correct.

[W at er I nlet – downs tr eam of the air f low


direct ion

Water O ut let – upst ream of t he air f low


direct ion]

16 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

4 The installation of the pipework


will not put stress on the
equipm ent connections or create
vibrations.

5 The materials used between the


equipm ent and the chilled water
system will not cause
Electrolysis.

6 Pipework that is to connect to


the unit has been weld tested.

7 Pipework that is to connect to


the unit has been pressure
tested.

8 Pipework that is to connect to


the unit has been cleaned and
flushed.

9 Equipm ent has been


backflushed.

10 The system has been bled and


air rem oved.

11 The chilled water system has


been hydraulically balanced.

12 Pipework is insulated and vapor


sealed

13 Insulation is labe led

14 All pressure gauges installed


and display scale as per design
requirem ents .

17 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

15 All valves/control valves are


installed , and the correct
direction

16 All com m issioning devices are


installed

17 All strainers are installed and


clean.

Heating Coil
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 The h eating coil is clean, in good


condition , and the fins are
undam aged

2 Ensure that the pipework is the


connected and correct size

3 Ensure that the flow and return


pipework handing s are correct .

[W at er I nlet – downs tr eam of the air f low


direct ion

Water O ut let – upst ream of t he airf low


direct ion]

4 The installation of the pipework


will not put stress on the
equipm ent connections or create
vibrations.

5 The materials used between the


equipm ent and the heating water
system will not cause
Electrolysis.

18 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

6 Pipework that is to connect to


the unit has been weld tested.

7 Pipework that is to connect to


the unit has been pressure
tested.

8 Pipework that is to connect to


the unit has been cleaned and
flushed.

9 Equipm ent has been


backflushed.

10 The system has been bled and


air rem oved.

11 The h eating water system has


been hydraulically balanced.

12 Pipework is insulated and vapor


sealed

13 Insulation is labe led

14 All pressure gauges installed


and display scale as per design
requirem ents.

15 All valves/control valves are


installed and , the correct
direction

16 All com m issioning devices are


installed

17 All strainers are installed and


clean.

19 FCU Checklist
Refrigerant Dx Coil System
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 The refrigerant coil is clean, in


good condition , and fins are
undam aged

2 External condenser installed

3 Ensure that the gas and suction


pipework is connected and the
correct size

4 Ensure that the gas and suction


pipework handing 's are correct.

5 The installation of the pipework


will not put stress on the
equipm ent connections or create
vibrations.

6 The materials used between the


equipm ent and the refrigeration
pipework system will not cause
Electrolysis.

7 Pipework that is to connect to


the unit has been
pressure /vacuum tested.

8 The system is charged with the


correct am ount of refrigerant.

9 Pipework is insulated and vapor


sealed

10 Insulation is labe led

11 All so lenoids installed and


operating

20 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

12 All sight glasses installed

13 All valves/control valves are


installed and, the correct
direction

Condensate drain/siphon
Ref Inspection/T ask Yes/No/[n/a] Notes

1 The condensate is installed


to the correct fall.

2 Ensure it is protected from


any frost with insulation
and/or heating cable.

3 There is a trap installed


and is installed in line with
m anufacturers '
requirem ents.

[Check manufac turer 's instr uct ions


for calculat ion/r equirements]

4 If there are multiple coils


installed on a unit, ensure
the condensate pipework
configuration is insta lled in
line with the
m anufacturer's
requirem ents.

5 Check that the size of the


condensate is correct.

6 Ensure the trap is filled to


the correct level.

21 FCU Checklist
Ref Inspection/T ask Yes/No/[n/a] Notes

7 Ensure the drain pan is


clean and free of debris

Electric Heater
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 Operation of the heating coil is


fan controlled /interlocked

2 Fan delay incorporated into the


control's logic, allowing the fan
to run [15 m ins] after the heater
has deactivated/switched off.

3 Heater elem ents are clean and


not obstructed by debris

4 All electrical testing was


com pleted , including torque tests
of connections.

5 All safety components are


connected and operational ,
including all therm ostats to cut
power to the heater if needed.

6 All controls cabling is connected


and installed in line with the
m anufacturers /design drawings.

7 Power is available to the electric


heater/control panel for
operation.

Supply Air Ductwork


This covers duct work from the fan coil unit to grilles .

22 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

1 All supply air ductwork is


installed, correct size , and
connected to the unit with
correct fixings

2 All attenuators are installed as


shown on the drawings.

3 All volum e control dam pers are


installed as per construction
drawings.

4 Ductwork insulated and vapor


seal in line with the
specification.

5 Test holes available in the duct


to allow air readings

Return Air Ductwork


Ref Inspection/T ask Yes/No Notes
/[n/a]

1 The p osition of recirculation


grilles is in l ine with the design
requirem ents and positioned so
as will not be affected by t he
fresh air intake .
[B e mi n df u l of sh ort cycl in g]

2 Plenum installed connecting the


grilles to the ducting /fan coil
unit.

3 Plenum has access hatch/s


installed to allow future
m aintenance and inspections

4 All extract air ductwork is


installed, correct size , and
connected to the unit with
correct fixings

23 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]

5 All attenuators are installed as


shown on the drawings.

6 All non-return dam pers are


installed as per construction
drawings.

7 All volum e control dam pers are


installed as per construction
drawings.

8 Ductwork insulated and vapor


seal in line with the
specification.

9 Test holes available in the duct


to allow air readings

Controls
Ref Inspection/T ask Yes/No/[n/a] Notes

1 Ensure all sensors and


instrum ents are installed
as per the control
logic/m anufacturers wiring
drawings

2 All sensors are calibrated

24 FCU Checklist