This checklist should be used and com pleted throughout the project, and its
different stages, delivery, storage, installation & pre -comm issioning , before the
functional testing occurs.
Project Name:
Date:
Equipment ID.
Contents
Contents ................................ ..................................................................... 1
Maintenance/Access .................................................................................... 9
Controls ................................................................................................. 24
2 FCU Checklist
Delivery Inspection
Once the Fan Coil Unit arrives at the site, usually delivered by a transport
com pany, the following should be checked with the driver b efore being accepted
into storage .
Any noted dam age should be reported to the manufacturer/supplier within 3 days
in writ ing, supported with photographs.
3 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
4 FCU Checklist
Storage Inspection
Storage Area
If the equipm ent is to be placed into storage on -site before installation , there will
be an inspection com pleted checking the following.
5 FCU Checklist
Storage of Fan Coil Unit
Prior to the units being placed into storage , the following should be checked.
6 FCU Checklist
Pre-Installation Inspection
Prior to the units being installed , the following should be checked.
[f or w a ll mo u nt e d/f l oo r mou n te d u ni ts ]
7 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
8 All connections,
pipework/ductwork , etc., can be
independently supported and not
supported by the unit.
8 FCU Checklist
Maintenance/Access
Ref Inspection/T ask Yes/No Notes
/[n/a]
9 FCU Checklist
Pre-Commissioning Inspection
Once the equipm ent has been installed and prior to the functional testing and
comm issioning phase taking place , the following will be checked.
General
Ref Inspection/T ask Yes/No Notes
/[n/a]
Electrical General
10 FCU Checklist
Ref Inspection/T ask Yes/No/[n/a] Notes
3 Em ergency disconnect
installed for each
com ponent in line with
NFPA/local code
requirem ents
11 FCU Checklist
Ref Inspection/T ask Yes/No/[n/a] Notes
12 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
13 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
Filters
14 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
15 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
10 Im peller is balanced
Cooling Coil
Ref Inspection/T ask Yes/No Notes
/[n/a]
16 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
17 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
Heating Coil
Ref Inspection/T ask Yes/No Notes
/[n/a]
18 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
19 FCU Checklist
Refrigerant Dx Coil System
Ref Inspection/T ask Yes/No Notes
/[n/a]
20 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
Condensate drain/siphon
Ref Inspection/T ask Yes/No/[n/a] Notes
21 FCU Checklist
Ref Inspection/T ask Yes/No/[n/a] Notes
Electric Heater
Ref Inspection/T ask Yes/No Notes
/[n/a]
22 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
23 FCU Checklist
Ref Inspection/T ask Yes/No Notes
/[n/a]
Controls
Ref Inspection/T ask Yes/No/[n/a] Notes
24 FCU Checklist