Risk Management
Operation / Work activity being assessed:
☒ Routine ☐ Non-routine
Generated by: Vessel ☐ (record the name) ☒Office
Code number (to be assigned by the Office):
Occasional-
Number of
Little cost or C 1 L(1) L(2) L(3) M(4) M(5)
minor injuries / Little pollution /
3
Possibility of Once per 5
2 Medical Limited response of
damage
Slight impact O
occurring years ($10000 – $
sometime
treatment for short duration
100000)
N 2 L(2) M(4) M(6) M(8) H(10)
personnel S
Remote- Not Once per 10
2 likely to occur years E 3 L(3) M(6) M(9) H(12) H(15)
Q
Minimum pollution / Minimum cost /
1
Few minor
Little or no response damage Zero impact U
Very unlikely- injuries E
Once per 30 needed < $10000 4
1 Practically M(4) M(8) H(12) H(16) H(20)
impossible
years or more N
C
E
High=Intolerable Risk Medium=Tolerable Risk Low=Acceptable Risk
Risk Assessment
Risk Identification Risk Analysis Initial risk evaluation
Potential
No Hazard
hazardous event
Existing control measures F C R
ALTERNATIVE WAYS TO CONDUCT THE WORK (a new RA should be conducted for the alternative way decided)
Are any amendments to QSM required (related to the above Additional Risk Control Measures)?
Yes ☐ Describe:
No ☐
Contingency plans (to facilitate safe management and recovery of the situation in case of any unplanned occurrences)
Emergency case
GROUNDING
Remarks:
Remarks: