KEY:

H
KKA
HVAC ABBREVIATION ME
N
D

LIST OF HVAC DRAWINGS HEATING, VENTILATION AND AIR CONDITIONING GENERAL NOTES HVAC SYMBOLS


SERIAL HEAT RECOVERY WHEEL
PROJECT ZONE BLDG STAGE SHEET NAME 1. THESE DRAWINGS SHALL BE USED FOR HVAC PURPOSES ONLY, DO NOT SCALE FROM THESE 
No. SUB DISCIPLINE SCALE COMMENTS REFRIGERANT LIQUID
DRAWINGS.
A/C AIR CONDITIONING
NOTES:
LIST OF HVAC DRAWINGS, LEGEND & GENERAL N.T.S. 2. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT 
AIR HANDLING UNIT AF ANGLE FILTER
RH1961 00 EB TD MG001
NOTES DRAWINGS OF DIFFERENT TRADES FOR COORDINATION PURPOSES. AHU AIR HANDLING UNIT
RH1961 00 EB TD MG501 HVAC MISCELLANEOUS DETAILS ( 1 OF 3 ) N.T.S. BF BAG FILTER
RH1961 00 EB TD MG502 HVAC MISCELLANEOUS DETAILS ( 2 OF 3 ) N.T.S.
3. ALL DUCT AND PIPE SIZES ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. CC COOLING COIL
RH1961 00 EB TD MG503 HVAC MISCELLANEOUS DETAILS ( 3 OF 3 ) N.T.S.
RH1961 00 EB TD MG601 HVAC EQUIPMENT CAPACITY SCHEDULE N.T.S. CDR CONDENSATE DRAIN
RH1961 00 EB TD MG801 BMS SCHEDULE OF CONTROL POINTS (1 OF 5) N.T.S.
4. EXACT DIMENSIONS AND INVERT LEVELS OF OPENINGS IN CONCRETE WALLS SHALL BE  AIR COOLED CONDENSING UNIT
CL CEILING LEVEL
RH1961 00 EB TD MG802 BMS SCHEDULE OF CONTROL POINTS (2 OF 5) N.T.S. VERIFIED BY THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL THREE SETS 
CP CONTROL PANEL
RH1961 00 EB TD MG803 BMS SCHEDULE OF CONTROL POINTS (3 OF 5) N.T.S. OF SHOP DRAWINGS SHOWING OPENINGS & SLEEVES IN CONCRETE WALLS & SLABS FOR THE 
APPROVAL OF STRUCTURAL ENGINEER BEFORE WORK CAN BEGIN. HE SHALL ALSO PREPARE  CROSS TALK SOUND
RH1961 00 EB TD MG804 BMS SCHEDULE OF CONTROL POINTS (4 OF 5) N.T.S. SPLIT INDOOR UNIT CTA
RH1961 00 EB TD MG805 BMS SCHEDULE OF CONTROL POINTS (5 OF 5) N.T.S. ANOTHER THREE SETS OF SHOP DRAWINGS FOR APPROVAL SHOWING THE SYSTEM EXACTLY  ATTENUATOR
IN PLACE.  SPLIT OUTDOOR UNIT
CU CONDENSER UNIT
HVAC LAYOUT DB DRY BULB TEMPERATURE
RH1961 00 EB TD MH‐101 GROUND FLOOR PLAN‐HVAC LAYOUT HVAC LAYOUT 1/100 5. ALL EQUIPMENT SHOULD BE APPROVED BEFORE PURCHASE ORDER HAS BEEN PLACED. CENTRIFUGAL INLINE FAN DL DOOR LOUVER
RH1961 00 EB TD MH‐102 FIRST FLOOR PLAN‐HVAC LAYOUT HVAC LAYOUT 1/100
RH1961 00 EB TD MH‐103 SECOND FLOOR PLAN‐HVAC LAYOUT HVAC LAYOUT 1/100
DN DOWN
6. ALL A/C PIPES & DUCTS RUN AT CEILING LEVEL UNLESS INDICATED OTHERWISE.  VAV-WITHOUT ELECTRIC HEATER
RH1961 00 EB TD MH‐104 ROOF FLOOR PLAN‐HVAC LAYOUT HVAC LAYOUT 1/100 EA EXHAUST AIR
EAD EXHAUST AIR DUCT
7. ALL ROOMS EQUIPPED WITH FM200 SYSTEM OR ANY OTHER TOTAL FLOODING SYSTEM  VAV-WITH ELECTRIC HEATER
SHALL HAVE SEALED DOORS WITH AUTOMATIC SHUTTERS.  EAG EXHAUST AIR GRILLE
EAR EXHAUST AIR REGISTER
8. THE FALSE CEILING VOID IS CONSIDERED AS RETURN AIR PLENUM UNLESS INDICATED  SOUND ATTENUATOR ENTERING AIR LEGENDS:
EAT
OTHERWISE.  TEMPERATURE
VOLUME DAMPER ECD EXHAUST CEILING DIFFUSER
9. FOR LOCATION OF FLOOR DRAIN WHERE A/C CONDENSATE DRAIN IS DISCHARGE REFER TO  EXF EXHAUST FAN
FIRE DAMPER
THE CORRESPONDING DRAINAGE LAYOUT DRAWINGS. 
FA FRESH AIR
MOTORIZED VOLUME DAMPER
10. ALL DUCTS CROSSING 2 HOURS FIRE RATED DUCTS SHALL BE PROVIDED WITH FIRE  FAB FROM ABOVE
DAMPERS MOTORIZED FIRE SMOKE DAMPER FAD FRESH AIR DUCT
THERMOSTAT
FAL FRESH AIR LOUVER
11. ALL FIRE DAMPERS SHALL HAVE ACCESS PANEL. FB FROM BELOW
FC FALSE CEILING
12. THE CONTRACTOR HAS TO CONFIRM THE STATIC PRESSURE  OF ALL FANS, AIR HANDLING  SUPPLY CEILING DIFFUSER
FDR FIRE DAMPER
UNITS . CALCULATIONS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL OF THE ENGINEER.
HL HIGH LEVEL
GENERAL NOTES
13. THE CONTRACTOR HAS TO SUPPLY AND INSTALL ALL BASES FOR  FANS, AIR HANDLING  HRU HEAT RECOVERY UNIT
RETURN CEILING DIFFUSER
1. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND  UNITS,   ETC. ALL ELECTRO‐MECHANICAL EQUIPMENT TO THE APPROVAL OF THE ACOUSTIC  IL INVERT LEVEL
RESOLVED PRIOR TO FINALIZATION OF CONTRACT. ANY VARIATION DUE TO NOT DOING SO WILL  CONSULTANTS AND THE ENGINEER AT NO EXTRA COST. KW KILOWATT
NOT BE ENTERTAINED LATER DURING CONSTRUCTION. L/S LITERS PER SECOND
14. ALL SMOKE EXHAUST DUCT WORK SHALL BE FIRE RATED TO WITHSTAND A TEMPERATURE  EXHAUST CEILING DIFFUSER LL LOW LEVEL
OF 400°C FOR TWO HOURS. MOTORIZED VOLUME
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL SERVICES. MD
GRILLE DAMPER
15. THE LOCATION OF THERMOSTATS SHALL BE SUBMITTED BY CONTRACTOR IN HIS SHOP 
MOTORIZED SMOKE FIRE
3. THE CONTRACTOR SHALL PREPARE DURING CONSTRUCTION SHOP DRAWINGS SHOWING THE  DRAWINGS FOR REVIEW AND APPROVAL OF THE ENGINEER. THE CONTRACTOR SHALL  CONTROL PANEL MFSD
DAMPER
LOCATIONS AND SIZES OF ALL ACCESS PANELS IN FALSE CEILING THAT ARE REQUIRED FOR  PROPOSE ADEQUATE LOCATIONS FOR THERMOSTATS IN COORDINATION WITH ALL  EXHAUST AIR RIGSTER
CONCERNED PARTIES INCLUDING THE INTERIOR DESIGNER AND TAKING INTO  MOTORIZED SMOKE
MAINTENANCE, ADJUSTMENT OR REPLACEMENT OF MECHANICAL ITEMS. THESE SHOP  MSD
CONSIDERATION THERMAL COMFORT, FUNCTIONALITY AND THE AESTHETICS. THE  SUPPLY AIR RISER DAMPER
DRAWINGS SHALL BE DONE IN COORDINATION WITH ALL CONCERNED PARTIES INCLUDING THE  MSIU MINI SPLIT INDOOR UNIT
NECESSARY CONDUITS SHALL BE PROVIDED IN COORDINATION WITH ELECTRICAL  RETURN AIR RISER
INTERIOR DESIGNER AND SHALL BE SUBMITTED FOR REVIEW & APPROVAL OF THE ENGINEER. INSTALLATIONS.  MSOU MINI SPLIT OUTDOOR UNIT
EXHAUST AIR DUCT UP
NTS NOT TO SCALE
T SENSOR
4. CONTRACTOR SHALL SUBMIT COMPOSITE COORDINATED DRAWINGS SHOWING ALL SERVICES  16. WIRE MESH SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS: TS
PA PASCAL KEY PLAN:
(A/C, FIRE FIGHTING, FIRE ALARM, WATER SUPPLY, LIGHTING…) FOR REVIEW AND APPROVAL OF  • AIR INLETS & OUTLETS EXPOSED TO THE ATMOSPHERE.
RA RETURN AIR
• INLETS OF FAF'S & EXF'S WHOSE INTAKE IS NOT DUCTED
ENGINEER. RAD RETURN AIR DUCT
• RETURN AIR, FRESH AIR & EXHAUST AIR DUCT INLETS.
RAG RETURN AIR GRILLE

DN
5. ALL EQUIPMENT INSTALLED ON ROOF OR EXPOSED TO AMBIENT CONDITION SHALL BE  17. WHERE THE INSTALLATION OF DUCTS IN WALLS, FLOORS OR PARTITIONS NECESSITATES  RAO RETURN AIR OPENING
COATED AND WEATHERPROOF. THE REMOVAL OF ANY FIRE STOPPING, THE SPACES AROUND THE DUCT AT SUCH POINTS 

AH
RCD RETURN CEILING DIFFUSER

MEKK
WHERE FIRE STOPPING WAS REMOVED SHALL BE SEALED WITH NONCOMBUSTIBLE  RG REFRIGERANT GAS
6. OPENINGS IN ROOF STRUCTURE AROUND PIPES OR OTHER EQUIPMENT SHALL BE CLOSED  INSULATING MATERIAL. RM ROOM
AND SEALED IN A SOLID NEAT APPROVED MANNER, AND MADE WEATHERPROOF. SA SUPPLY AIR
THE CONTRACTOR SHALL CHECK AND CONFIRM THAT THE U VALUES AND SHADING 
COEFFICIENTS FOR THE GLAZING AND OTHER BUILDING MATERIALS ARE IN ACCORDANCE  SAD SUPPLY AIR DUCT
7. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SUPPORTS AND HANGERS FOR PIPING AND  WITH THE A/C DESIGN VALUES. SAG SUPPLY AIR GRILLE
DUCTWORK. THE LOCATION OF SUPPORTS AND HANGERS SHALL BE INCORPORATED ON THE  SAR SUPPLY AIR REGISTER
RELEVANT SHOP DRAWINGS FOR REVIEW AND APPROVAL OF THE ENGINEER. IN CASE OF ANY CHANGES IN THE CHARACTERISTICS OF THE GLAZING AND BUILDING  SAT SOUND ATTENUATOR
No. REVISION APP'D DATE
MATERIALS THAT WILL BE ACTUALLY INSTALLED DURING CONSTRUCTION, THE CLIENT  SCD SUPPLY CEILING DIFFUSER
REPRESENTATIVE/ ENGINEER SHALL BE NOTIFIED AND THE NECESSARY MEASURES SHALL BE  SD SPLITTER DAMPER
8. CONTRACTOR SHALL SUBMIT SCHEDULE OF ALL DAMPERS SHOWING SIZING CRITERIA AND  TAKEN PRIOR TO APPROVAL OF THE CHANGES TO ENSURE THAT A/C EQUIPMENT ARE 
THE RELEVANT TECHNICAL DATA. SUPPLY LINEAR BAR
ADEQUATE FOR THE INTENDED PURPOSE. SLBG
DIFFUSER
18. FINAL DUCT DISTRIBUTION SHALL BE COORDINATED BY THE CONTRACTOR WITH INTERIOR  SMF SMOKE EXHAUST FAN
DESIGN LAYOUT. SMG SMOKE AIR GRILLE
TA TO ABOVE
19. AIR OUTLET LOCATIONS SHALL BE COORDINATED BY THE CONTRACTOR WITH THE FINAL  TB TO BELOW
ARCHITECTURAL ELECTRICAL AND INTERIOR DESIGN DRAWINGS. TYP TYPICAL
UT UNDER TILE PROJECT TITLE
20. ALL AIR OUTLET PLENUM BOXES SHALL BE INTERNALLY LINED.
VAV VARIABLE AIR VOLUME ‫اﻟﺪوﻟﺔ‬ ‫أﻣﻦ‬ ‫ﻟﺮﺋﺎﺳﺔ‬ ‫اﻟﺘﺎ ﻌﺔ‬ ‫اﻻﺳ اﺗ ﺠ ﺔ‬ ‫اﻟﻤﺸﺎر ــﻊ‬
21. PIPE MATERIAL UNLESS OTHERWISE SPECIFIED ON DRAWINGS: VD VOLUME DAMPER Engineering Building
• REFRIGERANT PIPES: "COPPER" VARIABLE FREQUENCY
VFD DRAWING TITLE
• A/C CONDENSATE DRAIN PIPES IN GENERAL: "UPVC". DRIVE
W WATT LIST OF HVAC DRAWINGS, LEGEND &
WB WET BULB GENERAL NOTES

FILE NAME: RH1961_KA_EB_XX_ME_HVAC_19
WL WALL
         DESIGNED KA PROJECT No.
DRAWN KA RH1961
APPROVED KA SHEET SIZE A1
DATE 18 FEB. 2020  SCALE N.T.S.
GOOD FOR TENDER
PROJECT ZONE BLDG. STAGE SERIAL NUMBER REVISION

RH1961 00 EB TD MG001 00