Professional Documents
Culture Documents
Job Information: Engineer Checked Approved Name: Date: Structure Type
Job Information: Engineer Checked Approved Name: Date: Structure Type
Name: vin
Date: 4/27/2023
G3: 2B NP B2: beams ACI 318-05 Beam M34, M35, M36, M37, M38, M39
Cover
Length Top Btm Side
Member Span Type Link Size
(m) (cm) (cm) (cm)
Beam Supports
Distance Vu Vc Av Required
Span
(m) (kN) (kN) (mm2)
Distance Vu Vc Av Required
Span
(m) (kN) (kN) (mm2)