EXPLOSION PROOF EMERGENCY & EXIT LUMINAIRES

Adolf Schuch, Germany


g/SCHUCH/

14th December 2022

AUTHORIZED DISTRIBUTOR LETTER

CERTIFICATE

This is to certify on behalf of M/s. Al Ghanim Engineering Co., Kuwait (Authorized Agent of Adolf
Schuch GmbH) that M/s. POWER General Trading & Contracting Co. Kuwait is authorized to

supply of Adolf Schuch GmbH Emergency and Exit Luminaires products for Umm Al Hayman
Wastewater Treatment Plant Project in Kuwait.

This letter is pertinent for this Project Only,.'

i:ACÖLF SCHtiCFrG mbH


Lich hnCh Spezialfabrik
rAainzerStr. 172 TeL 0 62 41/40 91-0
67547 WORMS

Adolf Schuch GmbH Tel.: +49 (0) 62 41 40 91-0 Volksbank Alzey-Worms eG Commerzbank AG USTNAT/TVA-ID-Nr.:
Lichttechnische Spezialfabrik Fax: Inland 40 91-171 IBAN: DE57 5509 1200 0000 0221 01 IBAN: DE39 5504 0022 0202 8884 00 DE 183 995 908
Mainzer Str. 172 •67547 Worms Fax: Export 40 91-29 Swift/BIC: GENODE61AZY Swift/BIC: COBADEFFXXX HRB 11673 Mainz
Postfach 21 45 6751 1 Worms E-Mail: info@schuch.de Sparkasse Worms-Alzey-Ried WEEE-Reg-Nr.:
Geschäftsführer: Carlo Wolf Internet: www.schuch.de IBAN: DE02 5535 0010 0000 1710 09 DE 248 68 251
Swift/BIC: MALADE51WOR
Project Title UMM AL HAYMAN SANITARY ENGINEERING
Client MINISTRY OF PUBLIC WORKS
Electrical Contractor POWER GENERAL TRADING AND CONTRACTING CO.
SECTION 16500
LIGHTING SYSTEM (EMERGENCY LIGHTING)
COMPLIANCE STATEMENT
Supplier's Comment /
Sr. No. Clause Specification Requirement
Compliance

Emergency lighting installations shall be complete with emergency


batteries, chargers, luminaires and wiring, all as
2.07 A Comply
described in Specifications and as indicated on the Project Drawings,
complying with BS 5266 Part 1.
Non-maintained luminaires shall be supplied directly from the battery
system. Maintained exit luminaires etc., shall
2.07 B be supplied from a separate supply via an independent transformer and Comply, Proposed fitting are self contained
shall only operate from batteries during
mains failure.
The operation of the system shall be such that on loss of one or all
phases of the main electricity supply, a set of
central batteries or individual battery packs shall provide power for 3
hours to illuminate emergency luminaires
2.07 C Comply, Proposed fitting are self contained
throughout the building. On restoration of the mains supply the batteries
shall be charged by an integral charger
such that the system supplies not less than 85% of its rated voltage after
a period of 12 hours.
Where a central emergency battery unit is not installed, individual
2.08 A emergency luminaires shall consist of individual Comply, Proposed fitting are self contained
power packs installed within or remote to the luminaires
Battery pack units shall consist of converter/inverter devices, with nickel-
cadmium batteries to provide 3 hours
2.08 B Comply, Proposed fitting are self contained
operation under mains failure, unless the main supply is restored prior to
this.
Luminaires with self-contained battery packs shall be connected to the
2.08 C ‘live side’ of the local lighting circuit and Noted
lamps shall operate automatically under mains failure conditions
Units shall have the capability of sustaining high temperature so that they
can be accommodated in fittings with
high internal temperatures. However, if the internal temperature of the
2.08 D fittings exceeds 50°C, the battery unit shall Noted
be mounted remote to the luminaires. In the case of remote mounting, a
purpose made remote mounting box shall
be provided
Project Title UMM AL HAYMAN SANITARY ENGINEERING
Client MINISTRY OF PUBLIC WORKS
Electrical Contractor POWER GENERAL TRADING AND CONTRACTING CO.
SECTION 16500
LIGHTING SYSTEM (EMERGENCY LIGHTING)
COMPLIANCE STATEMENT
Supplier's Comment /
Sr. No. Clause Specification Requirement
Compliance
Key operated switches shall be provided, at the locations indicated on the
Project Drawings, for all self contained
2.08 E emergency pack unit luminaires, to control the operation of the luminaires Noted
manually for testing purposes. Test key
switches shall be clearly labeled “Emergency Lighting”.
Clauses of Part 2 relating to luminaires and lamps shall also apply to
2.09 A Comply, Proposed fitting are self contained
emergency luminaires and lamps.
Slave luminaires shall comply with BS 4533 Section 102.22 and BS 5225
2.09 B Comply, Proposed fitting are self contained
Part 3 and be as specified

Exit sign luminaires lettering shall be both in Arabic and English. The
Arabic text shall be above the English text.
Maximum viewing distance for minimum legend height shall be guided as
Comply, Proposed Fitting as per KFD Regulations and Approved by
2.09 C follows:
KFD
1. H > L/200
2. H = Height of Legend
3. L = Distance of viewer from the sign
Self contained emergency luminaires shall have a red light emitting diode
2.09 D installed on the luminaires so that Noted
the red light is visible.
With the central battery unit system, emergency luminaires shall be
installed with an engraved label fixed to the
2.09 E Proposed fitting are self contained
outer case of the luminaires, so that it is readily identified. The label shall
detail the lamp wattage and rated voltage.

Generally, marking of emergency luminaires shall comply with BS 5266


2.09 F Noted
Part 1.
Project Title UMM AL HAYMAN SANITARY ENGINEERING
Client MINISTRY OF PUBLIC WORKS
Electrical Contractor POWER GENERAL TRADING AND CONTRACTING CO.
SECTION 16500
LIGHTING SYSTEM (EMERGENCY LIGHTING)
COMPLIANCE STATEMENT
Supplier's Comment /
Sr. No. Clause Specification Requirement
Compliance

The following illumination level shall be considered for designing the


number of luminaires for emergency lighting:
(refer to BS 5266, Part 1)
Space to Height Ratio for luminaires shall be 4:1
5 lux for vital positions : first aid and safety equipment exit doors fire
2.09 G alarm call points fire fighting equipment exit Noted.
and safety signs changes of direction corridor intersection adjacent areas
of final exit points
1 lux for normal working spaces : on the centreline of escape route toilets
lift cars and moving ways plant rooms
covered car parks

Fluorescent lamps shall be provided for both slave and self-contained


type luminaire installations. The lamp
2.09 H wattage ratings shall be chosen from the following table: Noted, Proposed fitting are with LED Source
Slave : 4 watts or 8 watts
Self-contained : 8 watts, 18 watts, 36 watts or 58 watts
Total quantity of luminaires shall be calculated based on the illumination
2.09 I level requirement as per item 7 above, the Noted.