Professional Engineers Registration Examination

PRACTICE
of
Professional
Engineering
Examination
2022

professional engineers board Singapore


52 Jurong Gateway Road #07-03 Singapore 608550
Page 1

Professional Engineers Registration Examination


Practice of Professional Engineering Examination 2022
Information for Applicants

Contents Page

1 Introduction ....................................................................................... 2
2 Description of Examination .................................................................. 2
3 Eligibility to Sit for Examination ............................................................ 2
4 Fees .................................................................................................. 3
5 Date of Examination ............................................................................ 3
6 Venue ................................................................................................ 3
7 Application ......................................................................................... 3
8 Structure of Examination ..................................................................... 4
9 Passing Requirements Final Results and Notification .............................. 4
10 Review Courses …………………………………………………..………..5
11 Refund of Fees ……………………………………………………………..5
12 Request for Accommodation ………………………………………………………………5

Annex A: FORMAT, SYLLABUS AND SAMPLE QUESTIONS


I Practice of Professional Engineering Examination - Part 1 (Common)…………. 6
II Practice of Professional Engineering Examination - Part 2 (Civil) ................. 11
III Practice of Professional Engineering Examination - Part 2 (Electrical) .......... 19
IV Practice of Professional Engineering Examination - Part 2 (Mechanical) ....... 32
V Practice of Professional Engineering Examination – Part 2 (Chemical)……….. 43

Professional Engineers Registration Examination PPE 2022


Page 2

Professional Engineers Registration Examination


Practice of Professional Engineering Examination 2022
Information for Applicants

1 INTRODUCTION

The mission of the Professional Engineers Board is to safeguard life, property, and
welfare of the public by setting and maintaining high standards for registering
professional engineers and by regulating and advancing the practice of professional
engineering.

The Professional Engineers Board registers professional engineers in the branches of


civil, electrical, mechanical and chemical engineering. A person applying for
registration as a professional engineer to the Professional Engineers Board is required
to hold an approved degree or qualification listed in the Professional Engineers
(Approved Qualifications) Notification and acquired not less than 4 years of relevant
practical experience. He is also required to sit and pass examinations prescribed by
the Board. In addition, the applicant is required to attend an interview.

The following sections set out the requirements and details for the Practice of
Professional Engineering Examination 2022 while details on other application
requirements are available on the PEB website at www.peb.gov.sg.

2 DESCRIPTION OF EXAMINATION

The Practice of Professional Engineering Examination tests the applicant’s ability to


apply his knowledge and experience in professional engineering practice, and his
knowledge of the rules and regulations regulating the practice of professional
engineering in civil, electrical, mechanical or chemical engineering.

3 ELIGIBILITY TO SIT FOR EXAMINATION

A person may apply to sit for the Practice of Professional Engineering Examination
after he has-

(a) obtained not less than 2 years 6 months of practical experience in


engineering work relevant to the branch of engineering that he seeks to
be registered in; and

(b) sat for and passed the Fundamentals of Engineering Examination.

Professional Engineers Registration Examination PPE 2022


Page 3

4 FEES

The fee for an application to sit for the Practice of Professional Engineering
Examination is $450.

5 DATE OF EXAMINATION

The dates for the Practice of Professional of Engineering Examination 2022 are:

a) Chemical Engineering – To be Confirmed


b) Civil Engineering – To be Confirmed
c) Electrical Engineering – To be Confirmed
d) Mechanical Engineering – To be Confirmed

6 VENUE

The venue would be determined by PEB and successful applicants would be informed
of the details of the venue.

Due to current Covid-19 situation, the Practice of Professional Engineering


Examination may be conducted at physical location and/or virtually. More
details would be provided nearer the date of the examination.

7 APPLICATION

Application and payment shall be made online at PEB’s website by 7 March 2022. Refer
to the Application Guide for submission of application. Applicants are advised to send
in their applications early to allow time for processing.

Professional Engineers Registration Examination PPE 2022


Page 4

8 STRUCTURE OF EXAMINATION

A summary of the structure of the Practice of Professional Engineering Examination


2022 is shown in the table below. The examination is ‘open book’ and further details
are given in Annex A: Format, Syllabus and Sample Questions.

Subjects Time Allocated Format


 Answer 10 compulsory
Multiple Choice
PPE Part 1
2 hrs 10 mins Questions
Common paper
 Answer 3 out of 5 essay
questions

PPE Part 2
 Answer 1 compulsory
Civil/mechanical/
4 hrs 10 mins question plus 4 out of 7
electrical/chemical
questions
engineering

(Note: For PPE 2022 Part 2 Civil, only answers based on Eurocodes will be accepted.
Answers based on Singapore/British Standards will not be accepted.)

9 PASSING REQUIREMENTS, FINAL RESULTS AND NOTIFICATION

(a) A candidate is required to take both Parts 1 and 2 when he sits for the
examination unless he qualifies for an exemption as described in (b)
below. Examination results will be given to candidates on a Pass/Fail
basis and no scores or marks will be given to candidates. To obtain a
‘Pass’ in the examination, a candidate is required to obtain a pass score
in both Parts 1 and 2 respectively.

(b) A candidate who has taken both parts when he sits for the examination
and obtains a pass score in only one of the two parts is deemed to have
failed the examination. However, if he sits for the examination again, he
would be granted an exemption from the part for which he has obtained
a pass score. This exemption shall be granted provided the candidate
sits for the examination again within a 3-year period from the date of
result. With the exemption, he would only need to take the part of the
examination for which he did not obtain a pass score. No exemption shall
be granted if he sits for the examination again after the exemption
period, in which case he is required to take both Parts 1 and 2.

Professional Engineers Registration Examination PPE 2022


Page 5

(c) Examination results will be mailed to the candidates within twelve weeks
after the examination.

10 REVIEW COURSES

The Board does not endorse any review course or material provided as study aids.

11 REFUND OF FEES

Where an applicant who has been accepted is unable to sit for the examination
subsequently, the Board may, at its discretion, refund $150 to the applicant if the
applicant submits a medical certificate by mail within 2 weeks after the examination.
There will be no refund if the applicant sends a scanned copy of medical certificate
via email.

12 REQUEST FOR ACCOMODATION

A candidate who has disabilities may submit a written request for accommodation.
The request is to be received by PEB not later than 6 weeks before the date of
examination and late request would not be considered. PEB’s decision will be
conveyed to the applicant by written mail not later than one week before the
examination date.

Professional Engineers Registration Examination PPE 2022


Page 6

Annex A: FORMAT, SYLLABUS AND SAMPLE QUESTIONS

I Practice of Professional Engineering Examination Part 1


(Common)

Professional conduct and ethics are important areas because most of the
disciplinary actions taken by the Professional Engineers Board are in the area
of ethics and not technical matters. Professionalism and ethics are closely
related and inseparably bound as professional status and recognition are based
on public interest. A professional engineer’s judgment and decisions can have
great impact on public health and safety. He is expected to uphold the dignity,
standing and reputation of the profession. He shall practise ethically in relation
to his clients, employers, fellow professionals and the public at large.

Format

This is a common paper which has two sections on the Professional Engineers
Act and Professional Conduct and Ethics. The paper comprises 10 multiple
choice questions (MCQs) and 5 essay type questions based on hypothetical case
studies. The candidates must answer all the 10 compulsory MCQs (25 marks)
and can choose to answer any 3 out of the 5 essay questions (75 marks) during
the 2 hrs 10 mins examination period.

Syllabus

The paper will focus on the latest revisions of the following Professional
Engineers Act and Rules:

- Professional Engineers Act

- Professional Engineers (Code of Professional Conduct and Ethics) Rules

- Professional Engineers Rules

References will also be made to past disciplinary actions taken by the


Professional Engineers Board arising from complaints against professional
engineers.

Questions will be set to test the candidates’ understanding and interpretation


of the provisions in the act and rules as well as how they will tackle hypothetical
cases involving the clients, the employers, fellow professionals and the public
at large.

Professional Engineers Registration Examination PPE 2022


Page 7

Sample Questions From Past Year Papers for Practice of Professional


Engineering Examination Part 1 (Common)

Section A - Answer 10 Multiple Choice Questions – each at 2.5 marks


(COMPULSORY)

1 Under what circumstances shall a professional engineer advise the client


to engage the services of experts and specialists?

(a) The professional engineer shall give the advice when in his opinion
and judgment such services are in the interest of his client.
(b) The professional engineer shall give the advice when he feels such
services will pass the responsibility to others.
(c) The professional engineer shall give the advice when he can
indirectly benefit from the appointment of experts and specialists.
(d) The professional engineer shall give the advice when he considers
that in doing so the cost input of his company will be reduced.

2 A professional engineer may publicise his practice. However, in doing so,


the professional engineer shall ensure that the publicity —

(a) contains information that is related to all the projects undertaken


by him or his company but without the consent of the clients.
(b) contains only information beneficial to his business even though it
is likely to diminish public confidence in the engineering profession
or to otherwise bring the profession into disrepute.
(c) contains only justifiable claims to expertise or specialization; makes
no reference to past project information which constitutes a breach
of confidentiality to the client; and does not compare or criticise the
quality of services provided by any other professional engineer or
allied professional.
(d) contains information with material facts even if it may create an
unjustified expectation about the results that can be achieved by
him.

3 Engineer A provides design, plans and specifications for a commercial


building to Developer P who submits them to the authority for approval
but fails to pay Engineer A for the work performed. Thereafter,
Developer P asks Engineer B to review, endorse and resubmit the plans
to the authority for approval. Shall Engineer B agree to undertake the
project?

(a) Engineer B shall not agree to undertake the project as he has an


ethical obligation to recognise and give credit to the creative works
of other engineers.
(b) Engineer B shall agree to undertake the project as long as Engineer
A does not complain.

Professional Engineers Registration Examination PPE 2022


Page 8

(c) Engineer B shall agree to undertake the project as Engineer A does


not know.
(d) Engineer B shall agree to undertake the project as he is employed
by the Developer.

4 Engineer C comes from overseas and is not a registered professional


engineer in Singapore. If he uses the abbreviation “Er.” or “Engr” as a
title before his name in Singapore, he is guilty of an offence and will be
liable on conviction to —

(a) a fine not exceeding $2,000 and, in the case of a second or


subsequent offence, to a fine not exceeding $5,000.
(b) a fine not exceeding $10,000 or to imprisonment for a term not
exceeding 6 months or to both.
(c) a fine not exceeding $5,000 and, in the case of a second or
subsequent offence, to a fine not exceeding $10,000 or to
imprisonment for a term not exceeding 6 months or to both.
(d) a fine not exceeding $10,000 and, in the case of a second or
subsequent offence, to a fine not exceeding $20,000.

5 Engineer D is a Professional Engineer specialising in structural


engineering design and has just inherited a plot of land from his uncle.
He plans to build 6 units of terrace houses on the plot of land and
engages an architect to proceed with the design. He intends to play the
role of structural engineer himself. Is it in order for Engineer D to provide
structural design for his own housing project?

(a) It is in order for Engineer D to provide structural design for the


project since he is a qualified structural PE.
(b) It is in order for Engineer D to provide structural design for the
project since he can save cost.
(c) It is not in order for Engineer D to provide structural design for the
project since other structural engineers will be deprived a chance
to get involved.
(d) It is not in order for Engineer D to provide structural design for the
project since he is acting as a housing developer as well.

Professional Engineers Registration Examination PPE 2022


Page 9

Section B - Answer 3 Out Of 5 Essay Questions (each at 25 marks)

Question 1

Engineer A, on behalf of the engineering firm of which he is a principal,


submitted a statement of qualifications to a developer for a mega project.

In due course he was notified that his firm was on the "short list" for
consideration along with several other firms, but it was indicated to him that
his firm did not appear to have qualifications in some specialised aspects of the
requirements, and that it might be advisable for the firm to consider a joint
venture with another firm with such capabilities.

Engineer A thereupon contacted Engineer B, a principal of a firm with the


background required for the specialised requirements, and inquired if Engineer
B’s firm would be interested in a joint venture if Engineer A was awarded the
job. Engineer B’s firm responded in the affirmative.

Thereafter, Engineer C, a principal in a firm which was also on the "short list,"
contacted Engineer B and indicated the same requirement for a joint venture
for specialised services, and also asked if B’s firm would be willing to engage in
a joint venture if the C’s firm was selected for the assignment. Engineer B also
responded in the affirmative to Engineer C but did not notify Engineer A of his
response to Engineer C.

Is it ethical for Engineer B to agree to participate in a joint venture arrangement


with more than one of the several since he did not make a full disclosure to all
of the firms?

Discuss the issues and comment on Engineer B‘s conduct with reference to
relevant sections of the Professional Conduct and Ethics rules where applicable.

Question 2

Engineer A was retained by an architect to provide mechanical engineering


services in connection with the design of an office building. Engineer A
performed his services and thereafter a dispute arose between Engineer A and
the architect as to Engineer A's compensation for his services. The issue was
never resolved.

Several months later, the owner, who retained the architect on the project,
requested that Engineer A provide him with a copy of the air-conditioning
drawings in order to perform certain work on the building project which did not
involve issues of safety or health. The owner offered to pay Engineer A the cost
of reproduction and any administrative staff costs and to mediate the dispute
between Engineer A and the architect. Engineer A refused to provide the owner
with a copy of the drawings and declined owner's offer to mediate the dispute.

Professional Engineers Registration Examination PPE 2022


Page 10

Was it ethical for Engineer A to refuse to provide the owner with a copy of the
drawings and to decline owner's offer to mediate the dispute between Engineer
A and the architect?

Discuss the issues and comment on Engineer A’s conduct with reference to
relevant sections of the Professional Conduct and Ethics rules where applicable.

Question 3

Engineer A was employed by an transportation agency to supervise and inspect


the signals and communication systems of a public transportation system. The
systems were supplied and installed by Company B under a design-and-build
contract. Close to the completion of the project, in one of his site inspection
rounds, Engineer A discovered that part of the signals cables installed were
undersized, untidy and would likely lead to failure in the train signals.

He called for a meeting with the agency’s management and Company B’s
representatives. The representatives disputed Engineer A’s claim and argued
that as the systems were part of a design-and-build package, Engineer A did
not have the right to question what Company B did. Engineer A considered that
following the discussions at the meeting initiated by him, he had fulfilled his
duties in informing the agency’s management and Company B’s representatives
even though his opinions were ignored. He then left the matter as it was and
took no further follow-up actions.

Discuss the issues and comment on Engineer A’s conduct with reference to
relevant sections of the Professional Conduct and Ethics rules where applicable.

Professional Engineers Registration Examination PPE 2022


Page 11

II Practice of Professional Engineering Examination Part 2 (Civil)

The paper aims to examine the candidates on their proficiency in the practice of
civil/structural engineering at a professional level. Candidates are expected to
have a good working knowledge and experience of civil/structural engineering
design and practices in Singapore. In particular knowledge is required in the
areas of regulatory framework, submission and approval procedures, statutory
acts and regulations, practices guidelines and codes of practice.

The examination will place emphasis on the Professional Engineer’s role in


building projects in the local context either acting as the Qualified Person for the
project or Professional Engineer for the civil and structural engineering works.

Format

This is a 4 hrs 10 mins paper and a candidate is required to answer 1 compulsory


question covering the design of concrete and steel structures and choose 4 out
of 7 questions covering areas of design, codes of practice, acts and regulations,
submission/approval procedures & site supervision. The candidates may bring
along their own reference materials and calculators as necessary.

(Note: For PPE 2022 Part 2 Civil, only answers based on Eurocodes will be
accepted. Answers based on Singapore/British Standards will not be accepted.)

Syllabus

The list of reference literature, codes, acts, regulations, etc., appended below is
meant as a guide and is not exhaustive. The latest Acts and Regulations,
Publications and Civil Engineering Codes /Standards will apply.

 Acts and Regulations

 Professional Engineers Act and Regulations

 Building Control Act and Regulations

 Publications

 URA
- Planning Control Handbooks and Guidelines for Building Works

 SCDF
- Code of Practice for Fire Precautions in Buildings
- Handbook on Fire Precautions in Buildings
- FSSD Fire Safety Handbooks

Professional Engineers Registration Examination PPE 2022


Page 12

 LTA
- Guidelines & Publications on Rapid Transit Systems
- Building Works & Restricted Activities in Railway Protection
Zone
- Street Proposals
- Vehicle Parking
- Other Guidelines and Standards

 NEA
- Code of Practice on Environmental Health
- Code of Practice on Pollution Control

 PUB
- Code of Practice on Surface Water Drainage
- Standard Specifications for Drainage Works
- Code of Practice on Sewerage and Sanitary Works
- Sewerage and Drainage Standard Drawings

 NParks
- Procedures and Guidelines for Plan Submissions

 MOM
- Workplace Safety & Health Act and Subsidiary Legislations

 BCA
- National Productivity and Quality Specification (NPQS)
- Guidelines and Handbooks on Civil Defence Shelters
- Code of Practice on Buildable Design

 Civil Engineering Codes/Standards


- Codes and Standards under Building Control Act and
Regulations
- Codes and Standards for Roads and Transit Systems to LTA's
Requirements

Professional Engineers Registration Examination PPE 2022


Page 13

Sample Questions From Past Year Papers for Practice of


Professional Engineering Examination Part 2 (Civil)

Section 1- Question 1 (20 marks) is COMPULSORY

Question 1

A segment of a long pipe rack system is shown in Figure Q1-1. The main
structural system comprises columns spaced at 6m centre to centre supporting
a central spine beam connected the columns. The cantilever beams that support
the four water pipes are spaced at 2m centre to centre. The 500mm diameter
water pipes have a self-weight of 2 kN/m length and when the pipe rack system
is in operation the variable action is 2 kN/m length. The arrangement of pipe
rack system with dimensions is shown in Figure Q1-2.

The section of the cantilever beams and central spine beams are both UB
305x165x40. The section of the columns is UC 203x203x60 (Class 1 section) of
5m height. The columns are rigidly connected via baseplates to concrete
footings. The bottom flange of the cantilever beams are welded to the top
flange of the central spine beam. The client expects the pipe rack system to be
designed to cater for any configurations in the use of the pipes during operation
and during maintenance periods.

All steel sections are grade 355 N/mm2. Steel section properties are provided
in Annex. Refer to figure Q1-1 for additional information.

Figure Q1-1 Isometric View showing

Professional Engineers Registration Examination PPE 2022


Page 14

Question 1 (Cont’d)

Central Spine Beam


Cantilever Beam with Stiffener Plate

Column

Fixed end support

Figure Q1-2 Elevation view

(a) Under a critical loading case when two pipes are removed for maintenance
on one side of the pipe rack, determine and sketch the ultimate bending
moment and torsional moment diagram of the pipe rack system, including
the central spine beam, cantilever beam and column

(b) State the effective length (bucking length) to be considered for the design
of the columns and the cantilever beams with explanation.

(c) Check the adequacy of the column to SS EN 1993 using the critical load
case in Q1 (a).

(d) Suggest possible improvements with justifications to the pipe rack system
in a clear sketch.

Professional Engineers Registration Examination PPE 2022


Page 15

Section 2 - Answer 4 Out Of 7 Questions (each at 20 marks)

Question 2

A new 10-storey commercial development is located in a built up area of


Singapore. The proposed grid is 8m x 8m. One side of the site boundary is 6m
from the MRT 1st Reserve Line. Crown level of the existing 6m diameter MRT
Tunnel is at RL 85. There is a set back requirement of 5m from the boundary.
Platform Level is RL 100. The soil investigation report is provided by URA during
land sale (Figure Q2-1).

(a) Propose the foundation type, justify with preliminary calculations and give
reasons for your recommendation.

(b) State the consideration for Rail Way Protection Requirement and illustrate
with diagrams.

(c) List the structural submission requirements of BCA and LTA.

Figure Q2-1

Professional Engineers Registration Examination PPE 2022


Page 16

Question 3

While carrying out piling works for a single-unit housing development, it is


reported by the Builder that there is an existing 200 mm diameter minor sewer
present within the site as shown in Figure Q3. What is the immediate action
that must be taken to safeguard the minor sewer?

List down the proper procedures to be followed to prevent a similar situation


from occurring in the future.

It has been decided that the minor sewer shall be diverted to another location
within the site, avoiding the new proposed building. Sketch out a feasible
proposal for the diversion works within the site indicating the size, gradient and
levels of the proposed new sewer line.

Figure Q3

Professional Engineers Registration Examination PPE 2022


Page 17

Question 4

Your client's neighbor has a structure which encroaches into his premises
(Figure Q7). He has obtained the Court's permission to demolish the
encroachment on his land. You are required to submit the necessary Structural
Plans [ST] to BCA for approval. The ST submission should include provisions
for demolishing the portion of the structure encroaching on your client's land.

You may assume the following:

The density of the soil is 18 kN/m2


Surcharge load is 10 kN/m2
The water table is constant at 1.3 m below ground level
The coefficient for concrete cast on clayey sand is 0.4
The coefficient of active earth pressure for clayey sand is 0.3

(a) Show the approach you would take to ascertain the safety of the
remaining structure after removal of the encroaching portion.

(b) If you need to strengthen the partially demolished structure and your
client insists that any strengthening works should be done only on his
neighbor's land, what would you recommend?

Professional Engineers Registration Examination PPE 2022


Page 18

Question 4 (Cont’d)

Figure Q4

Professional Engineers Registration Examination PPE 2022


Page 19

III Practice of Professional Engineering Examination Part 2


(Electrical)

The paper aims to examine the candidates on their proficiency in the practice of
electrical engineering at a professional level. Candidates are expected to have a
good working knowledge and experience of electrical engineering design and
practices in Singapore. In particular knowledge is required in the areas of
regulatory framework, submission and approval procedures, statutory acts and
regulations, practices guidelines and codes of practice.

The examination will place emphasis on the Professional Engineer’s role in


building projects in the local context in relation to electrical engineering works.

Format

This is a 4 hrs 10 mins paper that examines candidates on technical competency


and understanding of standards and codes that are applicable in Singapore for
the discipline of electrical engineering.

The paper consists of 2 Sections and 8 questions. Candidates must answer


questions in both sections (Section 1 and Section 2). Section 1 consists of a
compulsory question on SS 638, statutory acts and regulations. Candidate is
required to answer this compulsory question. Section 2 consists of 7 questions.
Candidates shall choose to answer 4 out of 7 questions. The latest Acts and
Regulations, Publications and Engineering Codes /Standards will apply.

Syllabus

 Codes of Practice

 SS 638: Code of practice for electrical installations

 SS 626: Code of practice for design, installation and


maintenance of escalators and moving walks

 SS 650 - 1 : Code of practice for temporary electrical


installations - Construction and building sites

 SS 650 - 2 : Code of practice for temporary electrical


installations - Festive lighting, trade-fairs, mini-fairs and
exhibition sites

 CP 88 - 3 : Code of practice for temporary electrical installations


- Shipbuilding and ship-repairing yards

 SS 530: Code of practice for energy efficiency standard for


building services and equipment.

Professional Engineers Registration Examination PPE 2022


Page 20

 SS 531-1: Code of practice for lighting of work places – Indoor.

 SS 531-2: Code of practice for lighting of work places – Outdoor.

 SS 531-3: Code of practice for lighting of work places - Lighting


requirements for safety and security of outdoor work places.

 SS 532: Code of practice for the storage of flammable liquids.

 SS 535: Installation, operation, maintenance, performance and


construction requirements of mains failure and standby
generating system.

 SS 538: Code of practice for maintenance of electrical


equipment of electrical installations.

 SS 546: Emergency voice communication system in building.

 SS 550: Installation, operation and maintenance of electric


passengers and goods lifts.

 SS 551: Code of practice for earthing.

 SS 555-1 : Code of practice for protection against lightning –


General requirement.

 SS 555-2 : Code of practice for protection against lightning –


Risk management.

 SS 555-3 : Code of practice for protection against lightning –


Physical damage to structures and life hazard.

 SS 555-4 : Code of practice for protection against lightning –


Electrical and electronic systems within structures.

 SS 558: Code of practice for construction, installation, operation


and maintenance of intruder alarm systems.

 SS 563-1: Code of practice for the design, installation and


maintenance of emergency lighting and power supply systems in
buildings. Part 1 : Emergency lighting.

 SS 563-2: Code of practice for the design, installation and


maintenance of emergency lighting and power supply systems in
buildings. Part 2 : Installation requirements and maintenance
procedures.

Professional Engineers Registration Examination PPE 2022


Page 21

 SS 564-1: Green data centres - Part 1 : Energy and


environmental management systems

 SS 564-2: Green data centres - Part 2 : Guidance for energy and


environmental management systems

 SS 576: Code of practice for earthworks in the vicinity of


electricity cables.

 SS 601: Code of practice for maintenance of grid-tied solar


photovoltaic (PV) power supply system

 SS 645: Code of practice for the installation and servicing of


electrical fire alarm systems

 TR 25: Technical Reference for electric vehicle charging system

 Electricity Act

 Electricity (Electrical Installations) Regulations

 Handbook for Application of Installation Licence, published by


EMA

 Fire Code & Fire Code Handbook

 BCA Green Mark Assessment Criteria published by BCA

 Code on Accessibility in the Built Environment published by BCA

 Handbook for solar photovoltaic system (PV) Systems, published


by BCA and EMA

 How to Apply for Electricity Connection, published by SP Group

 Code of Practice for Info-communication Facilities in Buildings


(COPIF) published by IMDA

 Electrical Power Supplies, Tariffs and Design

 Electricity market

 Generation, transmission and distribution in Singapore

 Electricity bill calculation for HT and LT consumers

 Design of electrical installations

Professional Engineers Registration Examination PPE 2022


Page 22

 Load estimation

 Power factor correction


 Power quality and power system harmonics

 Consumer Substation, Switchboards and Switchgears

 Maintenance of electrical equipment, switchgears and cables

 Design for energy efficiency and sustainability

 Lighting requirement for workplace, indoor and outdoor

 Visual needs for safety and security

 Determine the lighting requirements for indoor and outdoor work


places.

 Energy efficiency and accessibility requirement for buildings

 Minimum energy-efficiency requirements for new installation and


replacement of systems and equipment in buildings

 Replacement of components of systems and equipment in


buildings

 Criteria for determining compliance with energy efficiency in


building with regards to air-conditioning and heat rejection
equipment, water heaters, motor drives and lighting used in
buildings.

 Requirement and guidelines for buildings to be designed or


retrofitted to provide accessibility and safety to persons with
disabilities and families with young children.

 Protection for Safety

 Measures in protection against electric shock (basic and fault)

 Principle of operation of protective devices

 Maximum demand and diversity factors

 Protection against over-current and short circuits

 Protective devices and circuit conductors

 Discrimination in protection of electrical circuits

Professional Engineers Registration Examination PPE 2022


Page 23

 Cables, Busways, and Distribution Boards

 Type and characteristic of cables

 Method of installation

 Sizing of conduit and trunking

 Factors affecting the current carrying capacity of cables

 Sizing of cables and busways for use under different types of


conditions

 Connected load, maximum demands and circuit breakers ratings


for a electrical distribution board

 Earthing

 Purpose of earthing

 Methods of earthing

 Earth fault loop impedance and earth fault current

 Suitable sizes of circuit protective conductor

 Testing of earthing

 Lightning Protection Systems

 Rolling sphere technique of determining zones of protection

 Spacing of air terminations and types of air termination

 Down conductors for building below 45 m and those exceeding


45 m

 Earth electrodes, earth resistance values and hazards of a rise in


ground potential caused by lightning strike

 Selection of appropriate materials and installation methods

 Prevention of side flashing

 Design requirement of complete lightning protection system

 Transients and surge suppression

Professional Engineers Registration Examination PPE 2022


Page 24

 Effect of lightning on system and structure

 Source and type of damages due to lightning

 Risk assessment aspect in lightning protection

 Emergency Lighting

 Exit and emergency lighting requirements for evacuation of


occupants

 Types of back-up power supplies

 Exit and directional Signs

 Standby Power Generator System

 Types of essential and critical loads

 Sizing of generator with considerations for maximum demand of


essential load, transient or motor starting loads and voltage dip

 Voltage regulation and its effects on generator sizing

 Protection for alternator and prime mover

 Installation of standby generator system including day-tank,


battery and charger, fuel supply, engine cooling system, plant
room ventilation, exhaust and fresh air intake, control and
instrumentation panel and automatic transfer switch.

 Underground fuel storage system

 Grounding/Earthing arrangement

 Maintenance

 Automatic Fire Alarm System

 Requirement for automatic and manual fire detection system and


purpose of compartmentation as required by the Fire Code

 Interaction with other building services such as emergency voice


communication system, lifts, AHUs, pressurization fans and auto-
doors during alarm activation

Professional Engineers Registration Examination PPE 2022


Page 25

 Emergency Voice Communication System

 Requirements for public address system for building above 24 m


but less than 60 m

 Requirements for emergency voice communication for building


above 60 m

 Requirements for fireman intercom

 Inspection, Testing and Common Violation In Electrical


Installation

 Mandatory requirements for inspection and testing of electrical


installation prior to energisation of electrical supply

 Types of test instruments and standard methods of testing

Professional Engineers Registration Examination PPE 2022


Page 26

Sample Questions From Past Year Papers for Practice of Professional


Engineering Examination Part 2 (Electrical)

Section 1 - Question 1 (28 marks) is COMPULSORY

Question 1

(a) Explain the difference and purpose of bonding and earthing as required
for an electrical installation in Singapore.

You are checking the lightning protection system for a building for
compliance to the new code, what is the minimum size of stranded
copper bonding conductor allowed to connect the non-ferrous connector
point to the earth termination system?

(b) You are the LEW responsible for the electrical installation in a newly built
mixed development. The main switchboard is ready for turn on. Identify
the certificate(s) to be submitted to SP Services Ltd (SPS) when you
request for an energisation appointment.

(c) An electrical installation with an approved load of 1000 KVA is taking


direct supply from PowerGrid’s network. The low voltage main
switchboard (MSB) with air circuit breaker (ACB) had passed the factory
acceptance test and was delivered to site; feeder cables were laid and
terminated to the MSB. Identify the tests to be carried out on site before
requesting for the turn-on by SP Services Ltd (SPS).

(d) Explain the purpose of the primary injection test.

(e) Refer to the distribution board shown in Figure Q1(e). A new load, an
air handling unit (AHU) rated at 11 kW 3-phase 400V at 0.8 pf, will be
added to the distribution board.

(i) Is there a need to upgrade the incoming breaker size and the bus
bar ratings of the distribution board? State the reason(s) for your
answer.

(ii) Determine the current rating of the MCB and the cable size for
the new AHU. Assume that the cable length from the distribution
board to the new AHU is 20m and the permitted Line-Line voltage
drop is 8V.

(iii) Is there a change in the short-circuit rating of the MCCB in the


distribution board when the new load is added? State the reasons
for your answer.

Professional Engineers Registration Examination PPE 2022


Page 27

Question 1 (Cont’d)

(iv) How would the LEW in-charge of the operation and maintenance
of the electrical installation isolate the distribution board to make
it safe for the modification works to be carried out? Elaborate on
the procedures and safety measures to be taken before physical
works on the distribution board can commence.

Figure Q1(e)

Professional Engineers Registration Examination PPE 2022


Page 28

Section 2 – Answer 4 Out Of 7 Questions (each at 18 marks)

Question 2

(a) You are asked to design an installation where electronic system will be
installed and required to comply with electromagnetic compatibility
(EMC) requirement. Identify the three criteria for your design?

(b) Figure Q2(b) shows the basic decomposition of a typical EMC coupling
problem where EMC is concerned with the generation, transmission and
reception of electromagnetic energy. What are the three ways to
prevent unintended interference?

Source Transfer Receptor


(emitter) (coupling (receiver)
path)

Figure Q2(b)

(c) A vertical electrical riser housed inside an office/commercial complex is


radiating electromagnetic field (EMF) as measured and indicated in
Figure Q2(c). Explain how to remove or reduce the radiated EMF and to
protect the occupants from this exposure?

Figure Q2(c)

Professional Engineers Registration Examination PPE 2022


Page 29

Question 2 (Cont’d)

(d) (i) State the main purpose of the lightning protection system.

(ii) Explain how the main purpose stated in above (i) can be achieved.

(iii) Explain how to reduce the dangerous side-flashes for a building?

Question 3

(a) Before work can commence on a high voltage switchboard, what are the
5 essential steps that need to be carried out to ensure the safety of the
workers? Assume that you can only shut down half of the switchboard.

(b) With the aid of a diagram, describe the protection requirements of the
incoming panel of a 22 kV supply. You should include the type, rating
and accuracy class of various devices where appropriate.

(c) A 22kV/400V 2-MVA transformer is connected directly to the “incoming


mains” air circuit breaker of a LV switchboard. The 22 kV cable is
protected by an IDMTL overcurrent relay R1 which is connected to
100/5A current transformers. R1 is set at 50% plug setting and time
multiplier at 0.3. The protection on the LV side is an IDMTL overcurrent
relay R2 which is connected to 3000/5A current transformers. Both the
relays R1 and R2 have the same time-current characteristic which is
given by:

t = 0.14/(M0.02 -1) secs ( for Time Multiplier = 1 )

where M = Plug Setting Multiplier

The symmetrical fault current at the 400-V switchboard is 36,000 A.


Determine a suitable plug setting and a suitable time multiplier for relay
R2 if the time discrimination between the two relays R1 and R2 is 0.4 secs.

Available plug settings for the two IDMTL relays are 50%, 75%,
100%,125%,150%,175% and 200%.

Assume the LV circuit breaker does not have direct-acting element.

Professional Engineers Registration Examination PPE 2022


Page 30

Question 4

(a) In your design of the electrical switchroom, you have given thoughts for
future maintenance.

(i) State the requirement for earthing resistance and extraneous


conductive parts when you are conducting the handover
inspection.

(ii) Explain and state the purpose on the requirement expected


before the end of defect liability period (DLP) in the interest of
your client.

(b) A 630A, 230/400V 50 Hz switchroom distributing energy to a row of


shophouses is disgusted with paper boxes and accumulated dirt over
prolonged period of 3 years. The owner explained to you that the load
is high only during all the festive seasons, such as mid-autumn,
Deepavali, Hari Raya, and the like in Singapore. You are asked by the
owner to advise the frequency of maintenance and any violation.

(c) During a routine check on a switchboard and the stand-by generator for
an electrical installation that is providing supply at 3-phase 4- wire
400/230 V 50 Hz to the mix load of a building. After you have switched
over the mix load from the utility supply to the generator supply, you
noticed that few lamps could be seen to flicker on its brightness; and
decided to measure the voltage. The measured values were:
- L1 to L2 = 406 V
- L2 to L3 = 400 V
- L3 to L1 = 410 V
- L1 to N = 140 V
- L2 to N = 200 V
- L3 to N = 303 V
- N to E = 140 V

You decided to reconnect the mix load back to the utility supply. Those
lamps that flickered, do not flicker any more. You measured the
voltage again and the values were:
- L1 to L2 = 405 V
- L2 to L3 = 401 V
- L3 to L1 = 408 V
- L1 to N = 234 V
- L2 to N = 230 V
- L3 to N = 238 V
- N to E = 3 V

(i) From the results, explain the phenomenon that the lamp flickers.
(ii) What do you deduce from this result and how would you
troubleshoot?

Professional Engineers Registration Examination PPE 2022


Page 31

Question 5

(a) You are the designer of a condominium project and a lift is required to
be provided between basement 1 & 2 carparks and the 1st storey of the
residential block. The total travel distance of these 3 landings is 6.8m
and you have advised the client to install a lift complying with SS 550
instead of a platform lift, as it has safety features that a platform lift
does not have. List 6 safety features and explain the purpose of each
safety feature.

(b) The Greenmark criteria for new residential buildings require that the
energy performance and energy effectiveness of a building be evaluated.

(i) Name 3 systems where energy performance evaluations must be


carried out and give a brief description of each evaluation.

(ii) For the effective use of energy assessment criteria, energy


efficient features are encouraged. Name any 3 such energy
efficient features.

(c) Data centres are typically lightly occupied and notwithstanding that the
lighting load is a small portion of the total load of a data centre, propose
2 methods of lighting design that will reduce the lighting energy
consumption.

(d) State 2 design considerations for an Emergency Voice Communication


System to comply with the SS Code of Practice and the Fire Code with
respect to:

(i) audibility, and

(ii) fault monitoring.

Professional Engineers Registration Examination PPE 2022


Page 32

IV Practice of Professional Engineering Examination Part 2


(Mechanical)

The paper aims to examine the candidates on their proficiency in the practice of
mechanical engineering at a professional level. Candidates are expected to have
a good working knowledge and experience of mechanical engineering design
and practices in Singapore. In particular knowledge is required in the areas of
regulatory framework, submission and approval procedures, statutory acts and
regulations, practices guidelines and codes of practice.

The examination will place emphasis on the Professional Engineer’s role in


building projects in the local context in relation to mechanical engineering works.

Format

This is a 4-hour paper that examines candidates on technical competency and


understanding of the use and application of standards and codes that are
applicable to the practice of mechanical engineering at a professional level in
Singapore.

The paper consists of 2 Sections comprising a total of 8 questions. Candidates


are required to answer questions in both sections (Section 1 and Section 2).
Section 1 will consist of a compulsory question on principles, codes, and
legislation related to general mechanical engineering practice, safety and
environmental protection. Section 2 will consist of a total of 7 optional
questions. Candidates may choose to answer any 4 out of the 7 questions.

Syllabus

The scope of professional engineering work covered by Professional Engineers


(Mechanical) may include the following fields: -

 Piped Services

Cold and Hot Water Services; Sanitary Plumbing Systems within


buildings; Town Gas Incoming Supply and Distribution; Liquefied
Petroleum Gas (LPG) Multi-Cylinder Systems; Swimming Pool
Filtration System

 Air Conditioning & Mechanical Ventilation

Indoor Air Quality Comfort / Environmental Control / Fire Safety


Requirements

Professional Engineers Registration Examination PPE 2022


Page 33

 Fire Safety in Buildings

Wet and Dry Rising mains/Hydrant Systems; Fire Hose reel System;
Automatic Fire Sprinkler System; Fire Detection and Alarm System;
Gas Flooding System

 Lift and Hoisting Systems

Lifting / Hoisting Equipment

 Other Major Mechanical Systems and Services

Boiler Plants, Calorifiers, Pressure Vessels, Pressure Piping

 Energy Conservation for Mechanical Building Services /


Buildings

 Relevant Codes of Practices, Standards and Acts (Based on


latest applicable Codes of Practices, Standards and Acts)

All relevant regulations, by-laws, Acts and accepted codes of practice


of:-

 National Environment Agency

 Public Utilities Board

 PowerGas Ltd

 PowerGrid Ltd

 Singapore Civil Defence Force

 Ministry of Manpower

 Building and Construction Authority

 Energy Market Authority

 Singapore Standards – Codes of Practice (Based on latest


applicable Codes)

 SS 497: Code of practice for design, safe use and maintenance 


of gantry cranes, overhead travelling cranes and monorail hoists 
 
 SS 536: Code of Practice for safe use of mobile cranes

 SS 559: Code of Practice for safe use of tower cranes

Professional Engineers Registration Examination PPE 2022


Page 34

 SS 567: Code of Practice for Factory Layout – Safety, Health and


Welfare Considerations

 SS 595: Singapore Standard for steel wire ropes for hoisting -


Part 3: Code of practice for the care, inspection and
maintenance of steel wire ropes for hoisting
 
 SS 617: Code of practice for the lifting of persons in work
platforms suspended from cranes

 SS 532: Code of Practice for the Storage of Flammable Liquids

 SS 597: Code of practice for bulk liquid oxygen storage


installations on user premises

 CP 48: Code of Practice for Water Services

 CP 52: Code of Practice for Automatic Fire Sprinkler System

 SS 530: Code of Practice for Energy Efficiency Standard for


Building Services and Equipment

 SS 553: Code of Practice For Air-Conditioning And Mechanical


Ventilation In Buildings

 SS 554: Code of practice for indoor air quality for air-conditioned


buildings

 SS 575: Code of practice for fire hydrant, rising mains and hose
reel systems

 SS 578: Code of Practice for Use and Maintenance of Portable Fire


Extinguishers

 SS 591: Code of practice for long term measurement of central


chilled water system energy efficiency

 SS 608: Code of practice for gas installation

 CP 10: Code of Practice for The Installation and Servicing of


Electrical Fire Alarm Systems

 SS 550: Code of Practice for Installation, Operation and


Maintenance of Electric Passengers and Goods Lifts.

 SS 626: Code of practice for design, installation and


maintenance of escalators and moving walks

Professional Engineers Registration Examination PPE 2022


Page 35

 SS 564 - 1: Singapore Standard for Green data centres - Part 1:


Energy and environmental management systems

 SS 564 - 2: Singapore Standard for Green data centres - Part 2:


Guidance for energy and environmental management systems

 Other Standards and Codes (Based on latest applicable


Standards and Codes)

 NFPA 2001: Standard for Clean Agent Fire Extinguishing systems


(FM200)

 American Society of Mechanical Engineers codes on pressure


vessels and piping

 American Petroleum Institute codes on pressure vessels and


piping

 British Standards on pressure vessels and piping

Professional Engineers Registration Examination PPE 2022


Page 36

Sample Questions From Past Year Papers for Practice of Professional


Engineering Examination Part 2 (Mechanical)

Section 1 (28 marks) - Compulsory

Question 1
(All TEN parts in Q1 carry equal marks)

1.1 (a) When is pressurization required for staircases? What are the
performance criteria that must be achieved in pressurization?

(b) For duct penetrations, when are fire dampers not permitted?

(c) Describe how you should design a mechanical ventilation system


for a smoke free lobby.

1.2 (a) Where passenger lifts are installed in a building with manual or
automatic fire alarm system as required in the code, describe how
the lifts should function when the fire alarm is activated.

(b) Also describe how the lifts should function in the event of normal
power failure or interruption.

(c) In a building without standby generator what should you provide


for the safe operation of the passenger lifts in the event of main
power failure or interruption?

1.3 Town gas is to be provided for food and beverage outlets in a new
commercial building development.

(a) What are the requirements if the gas piping is to be routed


through a naturally ventilated basement car park?

(b) Describe the interlocking system to be provided if the kitchen of


a food and beverage outlet is not naturally ventilated and is
located in the basement.

(c) What are the requirements if the gas piping is routed within the
false ceiling of an air conditioned corridor which is 30 m long at
storey 1?

1.4 (a) What is hot-tapping as practiced in process plant operation?

(b) Under what considerations can hot tapping technique be used?

Professional Engineers Registration Examination PPE 2022


Page 37

1.5 Discuss the purpose of pressure testing? Write short notes on the
following pressure testing methods:

(a) Leak testing;

(b) Pneumatic testing; and

(c) Proof testing.

1.6 (a) Explain the meaning of “design point” in the design of an Ordinary
Hazard sprinkler system.

(b) A circular duct is located more than 150 mm from the wall. What
is the maximum width this can be before a sprinkler must be
installed underneath it?

(c) What is the maximum distance below a non-combustible ceiling


that a sprinkler may be installed?

1.7 (a) State the density of discharge (mm/min) for OHII design.

(b) Explain briefly the operation of a pre-action sprinkler system.

1.8 In air-conditioning cooling load calculations for the purpose of sizing


systems, what are the indoor and outdoor design conditions to be used?
Support your answers with recommendations from the relevant code of
practice.

1.9 In designing an air-conditioning system to handle out-gassing from


furnishings and other works what provisions must be made to the
system?

1.10 (a) What is the definition of “Factor of Safety” as associated with the
use of steel wire ropes for hoisting?

(b) What are the respective minimum Factor of Safety for stationary
and running wire ropes used for winches and cranes?

Professional Engineers Registration Examination PPE 2022


Page 38

Section 2 – Answer 4 Out 7 Questions (each at 18 marks)

Question 2

(a) What are the primary objectives in maintaining swimming pool water in
a safe and pleasant condition?

(b) Calculate the minimum volume of a storage sump (m³) and the pump
flow rate in l/s for a pumped drainage system with a catchment area of
800m². You may use the data in Table 1 below.

Table 1

Duration (hrs) 3 4 5 6 12 24
Total Rainfall (mm) 151.4 210.6 253.4 281.9 376.7 533.2

Question 3

(a) What are the differences between a winch and a hoist?

(b) Under what conditions can you use a winch for lifting?

(c) You have to pull a load of 6,000kg. The load is not and cannot be
mounted on wheels. The only winch you have at hand is one rated at
5,000kg. Suggest a method that you may use to effect the pull.

Professional Engineers Registration Examination PPE 2022


Page 39

Question 4

Use the isometric design of an Ordinary Hazard Group II sprinkler system as


shown in Figure Q4, to design according to the pre-calculated method.

(a) Determine the water supply requirements and show them on Figure Q4.

(b) Size all range points.

(c) Insert the Design Point.

(d) Size all distribution pipes downstream of the Design Point.

(e) Complete the Statement of Distribution Pipe Losses.

Submit the answer sheets provided with the rest of your answers in
the answer book.

Figure Q4. Isometric design of an Ordinary Hazard Group II sprinkler system

Professional Engineers Registration Examination PPE 2022


Page 40

Question 5

A pressure vessel consisting of a shell and two hemispherical heads is


constructed from SA 516-70 carbon steel material (Tensile Strength – 70 ksi).
The self-reinforced nozzles in the vessel are made from type SA 213-316
stainless steel material (Tensile Strength – 75 ksi). The vessel is shut down
eight times a year for maintenance. At start-up, the full pressure of 300 psi
and full temperature of 450°F are reached in two hours. The maximum ΔT
between any two points during start-up is 300°F. At normal operation, the ΔT
is negligible. At shutdown, the maximum ΔT is 100°F. Determine the maximum
number of years that this vessel can be operated if a fatigue evaluation is not
performed.

You may use the following information:

(i) In accordance with ASME Boiler and Pressure Vessel Code, Section VIII
Division 1, paragraph UG-22 or U-2(g), fatigue analysis is not required
for materials with a tensile strength of less than 80 ksi when the total
number of cycles in (a) through (d) below is less than 1000.

(a) The design number of full range pressure cycles including startup
and shutdown.

(b) The number of pressure cycles in which the pressure fluctuation


exceeds 20% of the design pressure.

(c) Number of changes in metal temperature between two adjacent


points. These changes are multiplied by a factor obtained from
Table 2 in order to transform them to equivalent cycle number.
Table 2

Metal Temperature Factor


Differential, °F
50 or less 0
51 to 100 1
101 to 150 2
151 to 250 4
251 to 350 8
351 to 450 12
Higher than 450 20

(d) Number of temperature cycles in components that have two


different materials where a difference in the value (α1 — α2) 
ΔT exceeds 0.00034. Where, α is the coefficient of thermal
expansion and ΔT is the difference in temperature.

(ii) The coefficient of expansion for carbon steel is 6.5 X 10-6 in./in./°F and
that for stainless steel is 9.5 X 10-6 in./in./°F.

Professional Engineers Registration Examination PPE 2022


Page 41

Question 6

Figure Q6 below shows a single basement carpark, 60m x 30m, in area. Two
void openings, each 10m x 4.5m, are provided at the 1st storey above the car
park, and is open to the sky. Two opposite walls in the basement carpark are
provided with 1.2m deep openings throughout the length of the wall, as shown.

(a) Calculate the mechanical ventilation requirements for the


Basement Carpark.

(b) In what type of buildings would such carpark ventilation system


be permitted?

Figure Q6: Single basement carpark

Professional Engineers Registration Examination PPE 2022


Page 42

Question 7

The design data from a chilled water plant are as follows:

Chiller cooling capacity 1760 kW


Chiller COP 7.0
Chilled water supply temperature 6.5 °C
Chilled water return temperature 12.2 °C
Chilled water pump head 300 kPa
Chilled water pump efficiency 75 %
Chilled water pump motor efficiency 92 %
Condenser water supply temperature 29.5 °C
Condenser water return temperature 35.0 °C
Condenser water pump head 200 kPa
Condenser water pump efficiency 75 %
Condenser water pump motor efficiency 92 %
Cooling Tower fan power 35 kW

(a) Calculate the volume flow rates for chilled and condenser water.
Do the pumps meet the power limitation requirements of the
code? Suggest a remedy if the conditions are not met.

Show that by the use of variable speed pumping control the


pumps will be able to meet the part load performance
requirements of the code. Water density and specific heat may be
assumed to be 1000 kg/m3 and 4.18 kJ/kg·K, respectively.

(b) What is the overall energy efficiency ratio (EER) of the cooling
plant expressed as kW of electric power consumed per kW of
cooling?

Professional Engineers Registration Examination PPE 2022


Page 43

V Practice of Professional Engineering Examination Part 2


(Chemical)

The paper aims to examine the candidates’ proficiency in the practice of


chemical engineering at a professional level. Candidates are expected to have
a good working knowledge and experience in process safety, process design &
operations and related chemical engineering practices in Singapore.

Candidates are also expected to have a good understanding and knowledge of


regulatory framework, including safety case regime, statutory acts & regulations
and legislative requirements on chemical safety management, fire safety and
environmental pollution control.

The examination will place emphasis on the Professional Engineers’ roles in the
practical application of standards, codes of practice, technical guidance,
recommended practices relevant to the chemical & process industries and
chemical engineering works to support the industries.

Format

This is a 4-hour paper that examines candidates on technical competency and


understanding of the use and application of legislation, standards and codes
that are relevant to the practice of chemical engineering at a professional level
in Singapore.

The paper consists of 2 sections comprising a total of 8 questions. Candidates


are required to answer questions in both sections (Section 1 and Section 2).
Section 1 will consist of a compulsory question on safety case, process safety
management, principles, standards & codes and legislation related to general
chemical engineering practices. Section 2 will consist of 7 optional questions.
Candidates may choose to answer any 4 out of the 7 questions.

Syllabus

The scope of professional engineering work covered by Professional Engineers


(Chemical) may include the following fields: -

 Plant & Process Design


Process Design; Process Equipment Design; Plot Plan / Equipment Siting;
Instrumentation & Control Schemes; Materials of Construction (material
properties and selection, corrosion considerations Etc.); Equipment
Design Life.

 Process Safety Management (PSM)


Process Safety Management Elements; Process Safety Performance
Indicators (CCPS Process Safety Leading and Lagging Metrics); WSH

Professional Engineers Registration Examination PPE 2022


Page 44

Guidelines on Process Safety Performance Indicators; OSHA 1910.119


Process Safety management of highly hazardous chemicals; Singapore
Standard SS 651:2019 Safety and Health Management System for the
Chemical Industry.

 Process Hazard Analysis


Hazard Identifications Techniques [What-If / HAZOP Terminology and
Methodology / HAZOP Revalidation / Failure Mode Effect Analysis
(FEMA)]; Logic Tree - Fault Tree Analysis; Bow-Tie Concept.

 Functional Safety SIL Classification and Verification


Functional Safety (IEC 61508 / IEC 61511 / SIS Safety Life Cycle); Basic
Process Control System to HIPS/SIS, SIF, SIL; from HAZOP to Layer of
Protection (LOPA); Estimating Consequences & Risk Tolerant Criteria;
Failure Types; Hardware Fault Tolerance and Redundancy; Common
Cause Failures – ß factor.

 Fundamental of Hazardous Area Zone Classification


Standards for Hazardous Area Zone Classification [IEC System; American
System (NEC)]; Principles of Hazardous Area Zone Classification;
Explosive Dusts Classification; Material Classification; Temperature
Classification; Explosion Protection Type for Electrical Equipment;
Equipment Protection Level (EPL) Symbols.

 Chemical Runaway Reactions and Auto-refrigeration


Characteristics of Chemical Runaway Reactions; Hazard Assessment of
Chemical Reactions; Selecting and Specifying a Basis of Safety [Factors
to be Considered / Preventive Measures (Temperature; Addition;
Agitation; Scrubber System / Vents; Safe Time; Instrumentation &
Control) / Protective Measures (Emergency Relief System; Inhibiting
Runaway Reaction; Quenching & Dumping; Containment)]; Inherent
Safer Design (Minimize; Substitute; Moderate / Attenuate; Simplify / Limit
Effects – Plant Layout & Equipment Spacing); Auto-refrigeration, controls
and materials selection.

 Pressure Relief System


Overpressure Scenarios and Identification; Pressure Relief Valve Type;
Effects of Backpressure on Pressure Relief Valve; Pressure Relief Valve
Selection; Rupture Disk Devices and Application; ASME Boiler & Pressure
Vessel Code Section VIII Requirements [References: Sizing Pressure
Relief Valve Back to Basic; API 520 Sizing, Selection, and Installation of
Pressure-relieving Devices in Refineries Part I – Sizing and Selection];
Safety Blowdown and Flare system.

Professional Engineers Registration Examination PPE 2022


Page 45

 Safe Plant Operations


Common Hazards Associated with Process Plant to Avoid; Start-up
Preparation & Procedures (Elimination of Air / Tightness Testing /
Elimination of Water Etc.); Shut Down for Maintenance (De-inventory /
Hydrocarbon Freeing / Positive Isolations Etc.); Dust Explosion; Electrical
Safety; Management of Change (MOC); Pre-Start-up Safety Review
(PSSR); Standard Operating Procedures (SOP); Static-Electricity,
Pyrophoric Materials, Auto-ignitions plus control measures.

 Quantitative Risk Analysis


Various Consequences Modelling; Source Modelling & Dispersion; Event
Tree Analysis; Common Preventive and Mitigation Measures to Reduce
the Failure Frequencies; Individual Risk (IR) Contours and Risk Criteria.

 Safety Case
Concept of safety case; Identification of major accident hazards;
Determination of major accident scenarios and safety critical events;
Barrier and mitigation measures; ALARP demonstration.

 Energy Conservation for Chemical, Process & Utilities Plants


Environmental Consideration (Emissions Evaluation and Permitting;
Pollution Prevention and Mitigation; Waste Determination and
Management); Energy Efficiency Assessment, Evaluation and Mitigation
Measures for Carbon Emission Reduction; Process Optimization including
Optimal Energy Consumption.

 Relevant Legislation, Standards, Codes of Practices,


Guidelines (Based on latest applicable Legislation, Standards,
Codes, Guidelines)

 Legislation
- Workplace Safety and Health Act
- Workplace Safety and Health (Major Hazard Installations)
Regulations
- Workplace Safety and Health (General Provisions)
Regulations
- Environment Protection and Management Act
- Fire Safety Act
- Gas Act

Professional Engineers Registration Examination PPE 2022


Page 46

 Standards and Code of Practices


- Singapore Standard CP 75 – Code of Practice for Gas
Cylinders – Procedures for change of gas services
- Singapore Standard SS 532 – Code of Practice for the
storage of flammable liquids
- Singapore Standard SS 568 – Code of Practice for Confined
Spaces
- Singapore Standard SS 586 – Specification for hazard
communication for hazardous chemicals and dangerous
goods
- Singapore Standard SS 634 – Fire Safety for Open Plant
Processing Facilities in Oil, Chemical and Process Industries
- Singapore Standard SS 639 – Code of Practice for the
filling, inspection, testing and maintenance of gas cylinders
for the storage and transport of compressed gases
- Singapore Standard SS 651 – Safety and Health
Management System for the Chemical Industry
- Singapore Standard SS 66 7– Code of Practice for handling,
storage and processing of combustible dust
- IP 15 – Hazardous Area Classification Guide
- IEC 61508 – Functional Safety of
electrical/electronic/programmable electronic safety-
related systems
- IEC 61511 – Functional Safety – Safety Instrumented
Systems for the process industry sector
- API RP 505 – Recommended Practice of Classification of
Location for Electrical Installations at Petroleum Facilities
classified as Class 1, Zone 0, Zone 1 and Zone 2
- API RP 520 Part 1 & 2 - Sizing, Selection, and Installation
of Pressure-Relieving Devices in Refineries
- API RP 521 - Guide for Pressure-Relieving and –
Depressuring Systems
- API 580 - Risk-based Inspection
- API 610 - Centrifugal Pumps for Petroleum, Heavy Duty
Chemical and Gas Industry Services

Professional Engineers Registration Examination PPE 2022


Page 47

- API 617 - Centrifugal Compressor for Petroleum, Chemical


and Gas Service Industries
- API 618 - Reciprocating Compressors for Petroleum,
Chemical and Gas Industry Services
- API 619 - Rotary type Positive Displacement Compressors
for Petroleum, Chemical, and Gas Industry Services
- API 650 - Welded Tanks for Oil Storage
- API RP 751- Recommended Practice for Safe Operation of
Hydrofluoric Acid Alkylation Units
- API RP 2003 - Protection Against Ignitions Arising Out of
Static, Lightning, and Stray Currents
- API RP 2219 – Safe Operation of Vacuum Trucks in
Petroleum Service

 Guidelines
- Safety Case Technical Guide
- Safety Case Assessment Guide
- ALARP Demonstration Guidelines: Single Scenario Risk
Tolerability and Adequacy of Barriers
- QRA Criteria Guidelines
- QRA Technical Guidance
- WSH Guidelines – Process Safety Performance Indicators
- Guidelines on Safety Instrumented Systems in Major
Hazards Installations, Oct 2020

Professional Engineers Registration Examination PPE 2022


Page 48

Sample Questions for Practice of Professional Engineering


Examination Part 2 (Chemical)

Section 1 – Question 1 (28 marks) is COMPULSORY

Question 1

(a) In safety cases, major accident scenarios, especially safety critical events,
are based on a tolerability of risk framework. Typical criteria for the
boundaries of tolerability of risk framework are shown in the figure below:

(i) What do you understand by the term “ALARP”?

(ii) Explain the demonstration required in the zone of the “Risk is


tolerable if ALARP” region.

(b) It is essential for Major Hazard Installations to identify all major accident
hazards, their likelihood and consequences before going on to perform a
sufficient and suitable risk assessment and identify risk reduction
measures in the safety case.

(i) Define major accident hazards.

(ii) Explain how to derive a set of safety critical events from a list of
major accident scenarios.

(iii) Explain the principle of proportionality.

(c) In a Safety Case, explain how a Major Hazard Installation demonstrates


that adequate control measures have been provided to protect its plant
against excursions beyond design conditions.

Professional Engineers Registration Examination PPE 2022


Page 49

Section 2 – Answer 4 Out 7 Questions (each at 18 marks)


Question 2

Process and equipment integrity and reliability are keys to ensure facility
process safety.

(i) What are the inspection, testing and maintenance requirement of an


instrument air receiver?

(ii) Describe briefly what to look out for in starting up a steam boiler. What
actions do you take to re-start a boiler after an emergency trip /
shutdown?

(iii) In a process without standby generator, what should you provide for the
safe operations / safe shut down of the process plant in the event of main
power failure or interruption?

Question 3

Corrosion under insulation (CUI) or corrosion under fireproofing (CUF) is


considered one of major issues in a major hazard installation.

(i) What is temperature guide (range) for such consideration besides coating
type and age, insulation types, climate effects etc.?

(ii) What are the insulation maintenance best practices?

(iii) Describe how the current available technology, such as Digital


Radiography Testing (DRT), assists in CUI or CUF on-stream checks?

Question 4

(a) Describe briefly the areas of concern in environmental protection and


pollution control.

(b) Energy conservation is one of the key concern today, to reduce carbon
emission. What are operating efforts that could be taken to reduce energy
usage?

(c) In industry, the large energy users are fired heaters such as steam boilers
and industry furnaces. How you optimise a fired heater to reduce carbon
emission?

Professional Engineers Registration Examination PPE 2022


Page 50

Question 5

Pressure Relief Valves(PRVs) are installed to protect process equipment from


overpressure.
(i) What are the 3 main types normally used in the petrochemical/chemical
industry? Describe the circumstances under each type is used.

(ii) When the superimposed back pressure of a PRV is expected to fluctuate


over time, what PRV type should be selected ? Give reasons.

(iii) Sometimes a rupture disk is used upstream of a PRV. When is this


desirable?

Question 6

In process design of an equipment, the Design Temperature (DT) and Design


Pressure (DP) are usually specified.

(i) What are reasons for doing so? Give reasons for each.

(ii) If the maximum operating temperature of equipment is 300 deg.C and


maximum operating pressure is 20 barg, how would you specify the DT
and DP? Give your values.

(iii) If a piece of equipment goes through a batch chilling process with


temperatures cycling between freezing levels (say, -ve 20 degC) and
ambient temperature, what is the hazard that this piece equipment could
encounter? How is hazard usually overcome in the chemical industry?

Professional Engineers Registration Examination PPE 2022