Professional Documents
Culture Documents
Technical Team Leader, CAD Manager, Senior Design& Site Coordinator and Senior HVAC
Technical Team Leader, CAD Manager, Senior Design& Site Coordinator and Senior HVAC
Doha – Qatar
Mobile: +974 772 42 910
Whatsapp +974 772 42 910
E-mail: moh_husn1@yahoo.com
Passport Details
Personal Details
Birthday: 20 October 1981
Birthplace: Egypt
Nationality: Egyptian
Marital status: Married
Language Spoken: Arabic, English
Education Qualifications
1) Bachelor’s degree in science and education (physics & chemistry dept.) Alexandria
University, Egypt (1998 - 2002)
2) Diploma degree in scientific English from t h e Arab academy of science and
technology.
3) Diploma degree in English conversation from future generation foundation
(F.G.F)
4) Diploma degree in ICDL from future generation foundation (F.G.F)
5) Diploma degree in AutoCAD from (YAT) – for MEP
6) Diploma degree in HVAC system from (EEC)
7) Diploma degree in Photoshop CS2 from (YAT)
PROFILE
WORK EXPERIENCE E
Presently working as (Technical Team manager, Senior MEP coordinator, and Site Team Leader)for
Structural Qatar CO, Doha-Qatar from year June 2014 till now
Worked as (Senior HVAC coordinator and site engineering) for East Palaces Co. Doha-Qatar from year September–
Worked as (HVAC Draftsman) for Qatar Building Engineering COMPANY "QBEC", Doha-Qatar from April – 2005
to September – 2005
El Shafalah Center "Package 2 " DOHA QATAR (YEAR 2004 – 2005)* Worked as HVAC Draftsman for
the above project which consists of 13 buildings for children with special needs involved schools, dining
areas, therapy hall, swimming pools, theater corridors, and associated buildings the project involved with the
Q.P Mesaeed Camping– DOHA QATAR (YEAR 2004 - 2005)* Worked as HVAC Draftsman for the above
project which consists of 4 Administration Towers for Qatar Petroleum Company the Project involve the
AL Attiyah Residential Complex " 7 PEARLS " DOHA – QATAR (2005)* Worked as HVAC Draftsman
above project consisting of drainage residential complex with seven building including refreshment center
the project involves with the modem (A.H.U and F.C.U) HVAC works.
AL Saad Building – DOHA QATAR (2005)* WORKED AS HVAC Draftsman above project which consists
of B & G & M and 7 story office building. The project involves modern (A.H.U and F.C.U) HVAC works.
AL Mirgab Towers- DOHA – QATAR (YEAR 2005)* Worked as HVAC Draftsman above project which
consists of B & G and 23 Floors. The project involves living and dining areas, bedrooms swimming pools the
AL Gharrafa Hospital DOHA – QATAR (YEAR 2005-2006)* Worked as HVAC Draftsman above project
which consists of health center + emergency center + ambulance + externals, the project involved with the
Draftsman above project which consists of B+G+ 7 floors, the project involves with the modern (F.C.U)
HVAC Works.
Sheikh / Khaled Bin Ahmed Palace DOHA – QATAR (YEAR 2006-2007)* Worked as HVAC Draftsman
above project which consists of G+1st+p.house, the project involve with the modern (A.H.U and P.U) HVAC
Works.
Sheikh/ Naief Ben Sohiem Building DOHA – QATAR (YEAR 2007-2008)* Worked as HVAC Draftsman
above project which consists of B+G+ 7 floors, the project involve with the modern (F.C.U) HVAC Works.
Al Majed Towers- DOHA – QATAR (YEAR 2008-09)* Worked as HVAC Draftsman above project which
consists of B & G and 17 Floors+ P.HOUSE. The project involves living and dining areas, bedrooms
swimmingpools the project involves the modern (A.H.U and F.C.U) HVAC Works.
Al Sadd Stadium (The Sports City Project) - DOHA – QATAR (YEAR 2008-09)* Worked as Mechanical
Draftsman above project The project depends on cooling air for the main stadium playground, I did the
drainage work there. the project involves the modern (AHU, F.C.U, and cooling tower) HVAC Works.
Commercial Plaza at Cultural Village Project Phase Iii - DOHA – QATAR (YEAR 2008-09)* Worked as
Mechanical Draftsman above project which consists six huge building The project involves kitchens and
dining areas, restaurant and huge stores etc. I did most of the mechanical drawing layouts.
Grand Regency Hotel - DOHA – QATAR (YEAR 2008-09)* Worked as Mechanical Draftsman above
project, which consists of 2B+G+ six floors. The project involves luxury suites, luxury Rooms .and a
meetingroom. I did most of the mechanical drawing layouts.
Drugs And Criminal Research - DOHA – QATAR (YEAR 2009)* Worked as Mechanical Draftsman above
project, which consists of many separate buildings. The project involves administration building, prison, club
house and many proposed building .and meeting room. I did most of the mechanical drawing layouts.
Oman Embassy - DOHA – QATAR (YEAR 2008-2010)* Worked as HVAC Coordinator And Site
Engineering for the above project, which consists of many separate buildings. The project involves the
embassy building, guards quadrant building, consulate building, and ambassador villa. the project
involvedwith the modern (package units and duct split units ) , I did all of the HVAC Works l drawing
layouts.
Golden sand Hotel - DOHA – QATAR (YEAR 2010-012)* Worked as HVAC Coordinator And Site
Engineering for the above project, which consists of 2B+G+ twelve floors+ penthouses. The project
involves luxury suites, luxury Rooms .and a spa. (package units, chillers, and duct split units ) I did all of
the HVAC drawing layouts.
CYCLOTRON Building- DOHA – QATAR (YEAR 2011-12)* Worked as Senior HVAC Coordinator And
Site Engineering for above project, which consists of G+ first. The project involves A cyclotron hospital.
(chillers , AHU and FCU units ) I did all of the HVAC drawing layouts.
Qatar business incubator Building- DOHA – QATAR (YEAR 2012-13)* Worked as Senior HVAC
Coordinator And Site Engineering for above project, which consists of office building and workshops..
(Package, AHU and FCU units ) I did all of the HVAC drawing layouts.
Arab Center For Research And Policy Study- DOHA – QATAR (YEAR 2014-16)* Worked as Senior
MEP Coordinator , And Site Engineering for above project, which consists of 13 accommodation buildings
and library , theater , 7 multipurpose buildings and mosque .
SALWA Resort - DOHA – QATAR (YEAR 2016-19)* Worked as Technical Team Manager ,
Senior MEP Coordinator , And Site Engineering for above project, which consists of 5 star hotel,
ballrooms , luxury suites , Presidential suites ,luxury mall , Many international luxury restaurants Many
multipurpose buildings and mosque .
QP district “ Tower 10 “ - DOHA – QATAR (YEAR 2019-2022)* Worked as Technical Team Manager,
Senior MEP Coordinator, And Site Engineering for above project, which consists of 3 basements, ground
, mezzanine , 2 podiums , QP CEO accommodation level , swimming Pool , Gym , Mechanical level , 21
offices floors.
The Four Seasons Hotel - DOHA – QATAR (YEAR 2020 – 2022)* Worked as Technical Team
Manager, Senior MEP Coordinator , And Site Engineering for above project, which consists of
basement , ground , First , 5 podiums , 17 guest room floors , swimming Pool , Gym , ballrooms , luxury
suites .
HILTON Hotel - DOHA – QATAR (YEAR 2020 – 2022)* Worked as Technical Team Manager, Senior
MEP Coordinator, And Site Engineering for above project, which consists of 4 basements , ground, First
, 14 guest room floors , swimming Pool , Gym , ballrooms , luxury suites and Many luxuryrestaurants
FLORISTA Garden Hotel - DOHA – QATAR (YEAR 2020 – ongoing )* Worked as Technical Team
Manager, Senior MEP Coordinator, And Site Engineering for the above project, which consists of
basement, ground, 3 podiums. Amenities floor, 14 guest room floors, Swimming Pool and Gym.
Lusail Residential Tower Commercial Bank PSQC - DOHA – QATAR (YEAR 2021 – ongoing )* Worked as
Technical Team Manager, Senior MEP Coordinator, And Site Engineering for the above project, which consists
of 3 basement, ground, mezzanine, and executive floor, 22 guest room floors, Swimming Pool and Gym.
And So Many Buildings& Villa around the Most Important Locations In Doha From 2009 to 2022
General Skills
REFERENCES
I hope that the above-mentioned Qualifications and experiences meet your current and future
Requirements for your esteemed establishment.