Document No : FM-G-DC-018 (00)

One Point Lesson Effective Date : 14/03/2019


Page : 1/1
PT SEMEN JAWA

Dep/Sec/Cell : Plant Operation/Maintenance/Electrical


Learning : How To Check Hardware Interlocking Switchgear Main Motor Roller Press (measurement)
(*)
Category : Basic Knowledge Improvement Solving Problems Others ...........

(**)
Description :

1. Hardware Interlocking Switchgear Main Motor Roller Press

At Switchgear main motor roller Press CM1 and CM2 (aER12-104AH,105AH and aER12-204AH,205AH) have two hardware
interlocking for permit start closing switchgear. The interlocking signal as following :

1. Permit start main motor signal from Liquid Stater Panel of Roller Press
2. Permit start main motor signal from Roller Press Control cabinet

1 2

2. Connection terminal of interlocking inside MV switchgear

Terminal for measure


connection Interlocking

Mark cable XT/49Z2M08.1LSP-CLS (49) & XT/54Z2M08.1LSP-CLS (62) = Interlock from water resistance (LSP)

Mark cable XT/54Z2M08AC-CLS (62) & XT/54Z2M08AC-CLS (54) = Interlock from liquid Stater Panel

If All interlocking DCS has been completed and main motor show ready At Switchgear main motor Roller Press CM1 and
CM2 (aER12-104AH,105AH and aER12-204AH,205AH) can Started