Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Demolitions & Alterations CHECKLIST 301

Project:

NO. STANDARD CHECK REMARKS


A GENERAL
1 Obtained permit to demolish Y N NA
2 Approved the demolition sequence and methodology Y N NA
3 Liaise with relevant authority to occupy the place continuously Y N NA
4 Adequate precautions provided to protect all services Y N NA
5 Provided all necessary and adequate dust sheet and shoots Y N NA
6 Provided precautions to prevent nuisance Y N NA
7 Obtained OIC's permission for retaining/removing any material Y N NA
salvaged from the demolition
8 Reported bench marks found on buildings to OIC Y N NA
9 No tree is fallen or removed without OIC's approval Y N NA
10 Reusable materials are protected from damage, cleaned and Y N NA
overhauled for re-use
11 All demolition debris and rubbish cleared and removed Y N NA
B DEMOLITION
1 Liaised with electricity, gas, water supply and telecommunication Y N NA
authorities for proper disconnection
2 Provided adequate support/shoring/strutting & protection at Y N NA
each stage and inspected by OIC
3 Existing building & structure are completely pulled down to the Y N NA
level of the adjacent ground or paving or to the underside of the
lowest floor or paving whichever is the lowest
C ALTERATION
1 Obtained permission from the occupants or OIC Y N NA
2 Turned off all existing services Y N NA
3 Floors, walls and furniture are covered up Y N NA
4 Furniture, fittings, furnishing and all contents of existing building Y N NA
are carefully removed and stored
5 Provided all necessary temporary coverings to existing buildings Y N NA
or works exposed to weather
6 Provided temporary barriers blocking up all openings and/or Y N NA
necessary watching and security measures
7 Existing premises not used for storage/canteen/sanitary or other Y N NA
purposes (unless so specified or permitted by OIC)
8 Reported to OIC the defects discovered in existing building Y N NA
9 Carried out thorough examination of the existing roof, slab and Y N NA
the condition of existing finishes
10 Waterproofing water installed in accordance with specification Y N NA
and manufacturer's product instruction
11 10 years warranty provided for roofing and waterproofing Y N NA
product and workmanship
Name of SS: Name of OIC:
Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance:

Date: Date: Date: Date:

You might also like