This checklist is used to inspect precast concrete spun pile or square pile at a project site or manufacturer's plant. It contains 13 items to check the casting platform, pile condition and storage, concrete quality, curing time, steel reinforcement, end plates, and rejection criteria. Upon completion of the inspection, the safety supervisor and officer-in-charge sign off after verifying any non-compliances.
This checklist is used to inspect precast concrete spun pile or square pile at a project site or manufacturer's plant. It contains 13 items to check the casting platform, pile condition and storage, concrete quality, curing time, steel reinforcement, end plates, and rejection criteria. Upon completion of the inspection, the safety supervisor and officer-in-charge sign off after verifying any non-compliances.
This checklist is used to inspect precast concrete spun pile or square pile at a project site or manufacturer's plant. It contains 13 items to check the casting platform, pile condition and storage, concrete quality, curing time, steel reinforcement, end plates, and rejection criteria. Upon completion of the inspection, the safety supervisor and officer-in-charge sign off after verifying any non-compliances.
This checklist is used to inspect precast concrete spun pile or square pile at a project site or manufacturer's plant. It contains 13 items to check the casting platform, pile condition and storage, concrete quality, curing time, steel reinforcement, end plates, and rejection criteria. Upon completion of the inspection, the safety supervisor and officer-in-charge sign off after verifying any non-compliances.
A DESKTOP STUDY 1 Study specifications for precast concrete pile, including end Y N NA plate/anchor bar and pile shoes 2 Contractor submitted pile catalogue with certificate to and Y N NA approved by OIC B VISUAL INSPECTION (AT SITE OR MANUFACTURER PLANT) 1 Checked casting platform and casting process Y N NA 2 Checked pile's storage quantity and condition Y N NA 3 Checked no concrete cracks (caused by tension, shrinkage, Y N NA bending etc.) 4 Checked no honeycomb and/or segregation of aggregate Y N NA 5 Collected pile material testing records for each delivery batch Y N NA with Pile Reference No. indicated 6 Checked all piles are cured at least 28 days after casting Y N NA 7 Checked steel component: Not rusty/distorted/etc. Y N NA 8 Checked bar lapping and connection to end plate Y N NA 9 Checked reinforcement's spacers Y N NA 10 Checked end plate perpendicular to the centre line of Y N NA pile shaft 11 Checked pile toe and shoes Y N NA 12 Rejected any pile which fails in any of the above items, marked Y N NA "X" with paint on all sides of the pile 13 Rejected piles removed from site Y N NA C PITCHING & DRIVING 1 Used Checklist 405 for pile driven by drop hammer Y N NA 2 Used Checklist 406 for pile driven by hydraulic jacking Y N NA