Calculation Cover Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page 1 6 pages
Calculation Objective Note:
To design a suitable foundation base and pedestal for the pig launcher within
Alt+E

Calculation Method

Assumptions

Software Used
Title Version Validation (Y / N / N/A)
Microsoft Excel 2010

References
1. ACI 318-11 (Building Code Requirement for Structural Concrete)

Conclusions

rev3 date3 desc3 by3 chkd3 app3


rev2 date2 desc2 by2 chkd2 app2
rev1 date1 desc1 by1 chkd1 app1
Rev Date Description By Checked Approved
This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential
and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective
employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Template Change History (this sheet may be deleted from final document)

Changes since previous revision include:


Section Description
General Disclaimer wording modified
General Project and calc information created as named fields
Checklist Added checkboxes regarding signoffs and date formats. Modified units checkbox to
include unit conversions. (per PI#4508)
Calculation Checklist

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page 2 of 6 pages
Please check boxes for all applicable items checked or mark as "N/A" if not appropriate:
Calculations:
Calculation number assigned and registered (refer to project numbering system or Document Numbering System
EPP-0040 for format).
Project title shown.
Calculation title shown.
Revision history box complete and signed.
Table of Contents.
Appropriate stamp for preliminary issues.
Calculation objectives (aims) stated.
Calculation method defined or described (including formulae if relevant).
Reference made to text, standard or code. Check version/edition with that required for project.
Source of input data stated (with revision number and date if relevant).
Customer's requirements included/addressed.
Assumptions stated.
Summary of results or conclusions if appropriate.
For software based calculations, reference to software verification if available.
Approach used is appropriate for problem being solved.
Method clear and easy to follow.
Input data correct.
Calculation arithmetically correct OR software previously verified and reference to verification checked.
Calculation result within expected limits.
Calculation tolerances stated if significant.
Units used as required by customer. Unit conversions correctly performed.
Abbreviations correct.
Appropriate cross-references.
Sketches included and clearly labelled, where required.
Appendices included and referenced, as required.
Considered design reviews, Hazop actions, client input, safety and environmental issues, etc.
Document Sign-offs (typed full names of Originator, Checker, Approver; to be initialed beside at sign-off)
Dates in standard format (DD-MMM-YY)
Checking Records:
Checked and annotated copy of calculation filed (use "Check Print" stamp).
Corrections made as required and calculation dated and signed on cover sheet by checker.
Alternative method calculation and/or representative check performed and filed, as required.
Revisions:
Changes clouded.
Revision history block updated.
Calculation re-checked if required.
rev3 date3 desc3 by3 chkd3 app3
rev2 date2 desc2 by2 chkd2 app2
rev1 date1 desc1 by1 chkd1 app1
Rev Date Description By Checked Approved
This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This
Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither
DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page 3 of 6 pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Table of Contents

1 Calculation cover sheet 1

2 Calculation checklist 2

3 Calculation sheets 3 - 6

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This
Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik
, its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page 4 of 6 pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Weight of slug catcher = 377,150 lbs = 377 kips Length of pig launcher = 13.2 ft
Bearing pressure = 2000 psf = 2 ksf Distance between supports = 6.2 ft

377 kips

26.3 ft
Ra = 188.6 kips Rb = 188.6 kips

f'c = 4 ksi
fy = 60 ksi Critical plane
Dead load, D = 188.6 kips 188.6 k
Cover = 2 in 12 ft
Bar diameter = 0.05 in

3 ft
10 ft 20.2
20.2
20

10 ft
12 ft

ACI318-11 Design
Procedure Calculation Section Aid
Sizing the footing Ignoring the self weight of the footing
D/a = 94.29 sq.ft
Use 12 x 10.0 ft
Area = 120 sq.ft > 94.29 sq.ft OK

Required strength U = 1.4 D 9.2


U = 264 k or 2.2 ksf

Design for shear Ф shear = 0.75 9.3.2.3


Assume Vs = 0 (no shear reinforcement)
Ф Vn = Ф Vc 11.1.1
One way shear action bw = 144 in d = # in
h = 20 in
Vc = 2 (f'c)^½ bw d 11.3.1.1
Ф Vc = 245 kips
Vu = B x[(L/2) - ((b/2) + d)/12)] x U
Vu = 54.9 11.12.1.1
This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This
Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its
subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page 5 of 6 pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

ACI318-11 Design
Procedure Calculation Section Aid
Ф Vn = Ф Vc > Vu OK
Calculate moment at Mu = U x critical plane distance x l/2 15.4.2
pedestal face 1370 kip-ft

Compute flexural Ф kn = Mu (12000) / bd2


tension reinforcement = 425.080 psi
(bottom bars)
for Ф kn = 425.080 psi, select ρ = 1.45 % Flexure 1

Area of steel, As = ρbd 7.12


= 31.2 in2

Check for As,min = 0.0018bh 10.5.4


As,min = 4.32 in2

As,min < As OK

Use 23 no of #4 (0.5'') bars distributed uniformly


across the entire 8ft width of the footing @
8'' c/c
Use 12 no of #4 (0.5'') bars distributed uniformly
across the entire 15ft width of the footing @
8'' c/c

12 ft

10 ft 20.2

19- #401 - 8'' U. BAR

16 - #402 - 8'' U. BAR

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This
Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither
DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Pedestal Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page 6 of 6 pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Loading
Ultimate load, Pu = 189 kips (Weight of Slug catcher)
Ultimate moment, Mu = 59491 kip-in
Assume ϕ = 0.7
Nominal axial load = 269 kips
Nominal moment = 84987 kip-in

Material
f'c = 4 ksi
fy = 60 ksi

Column size
h = 120 in
b = 20.2 in

ACI318-11 Design
Procedure Calculation Section Aid
Determine reinforcement Pn = 269 kips
ration ρg using known Mn = 84987 kip-in
values of variables on h = 120 in
appropriate interaction b = 20.2 in
daigram(s) and compute Ag = bxh = 2424 in2
required cross section
area Ast of longitudinal
reinforcement

A. Compute Kn=Pn/(f'cAg) Kn = 0.02778

B. Compute Rn=Mn/(f'cAgh) Rn = 0.073043

C. Compute ϒ ≈ (h-5)/h ϒ = 0.95833

D. Determine the
appropriate interaction For a rectangular tied column with bars along
diagram(s) four faces f'c = 4ksi, fy = 60ksi and an
estaimated ϒ of 0.90, use R4-60.9 10.2 &10.3 Columns 3.2.4
(R4-60.9)
E. Read ρg for Kn and Rn Provide nominal reinforcements
values from appropriate
interaction diagrams

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This
Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik
, its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page of pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is
confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor
their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location \\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page of pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation
may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location \\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page of pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of
this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or
representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location \\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page of pages
Revision Date By Checked Revision Date By Checked Revision Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective
employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location \\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page of pages
Revision Date By Checked Revision Date By Checked Revision Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume
any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Calculation Sheet

Customer MPN Proj No 11109


Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no
Calculation Title Slug Catcher Foundation Design Phase/CTR phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location proj file Page of pages
Rev Date By Checked Rev Date By Checked Rev Date By Checked
rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Appendix A

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This
Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik
, its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.