LOKASI : TERMINAL UTAMA

PEKERJAAN : PIT LIFT


REF : Shop Drawing

DIMENSI VOLUM
Dimensi Luas Keliling Vol Total
Type Jumlah Volume Beton Rasio Vol Bekisting
P (m) L (m) T (m) Tebal m2 m2 Besi
m3 (Kg) (kg/m3) m2
PIT LIFT 1 & 3
Plat 3.7 3.475 2.25 0.25 12.68 14.25 2 6.34 2,196.88 346.4 7.13
2
2
2
2
2

Dinding 1 (Panjang) 3.2 0 2 0.25 6.30 10.3 4 6.30 1,002.96 159.2 164.80
4
4

Dinding 2 (Lebar) 0.0 3 2 0.25 6.00 10 4 6.00 788.17 131.4 160.00


4
4

Kolom Lift 0.3 0.3 19.95 0.25 0.09 1.2 8 14.36 5,434.32 378.3 4.80
8
8

Balok B4 3.8 0.3 0.5 8 4.50 683.95 152.0 33.00


8
8
8

Balok B5 3.8 0.3 0.5 2 1.13 112.53 100.0 8.25


2
2
2

PIT LIFT 2,4,5,6


Plat 3.8 3.5 2.25 0.25 13.30 14.6 4 13.30 4,566.46 343.3 14.60
4
4
4
4
4

Dinding 1 (Panjang) 3.3 0 1.95 0.25 6.44 10.5 8 12.87 2,101.94 163.3 327.60
8
8

Dinding 2 (Lebar) 0.0 3 1.95 0.25 5.85 9.9 8 11.70 1,505.32 128.7 308.88
8
8

Kolom Lift 0.3 0.3 19.95 0.25 0.09 1.2 16 28.73 10,868.64 378.3 9.60
16
16

Balok B4 3.8 0.3 0.5 16 9.00 1,367.89 152.0 66.00


DIMENSI VOLUM
Dimensi Luas Keliling Vol Total
Type Jumlah Volume Beton Rasio Vol Bekisting
P (m) L (m) T (m) Tebal m2 m2 Besi
m3 (Kg) (kg/m3) m2
16
16
16

Balok B5 3.8 0.3 0.5 4 2.25 225.06 100.0 16.50


4
4
4

PIT LIFT LT 2
Plat 3.7 3.475 2.2 0.25 12.68 14.25 4 12.68 4,650.81 366.7 64.99
4
4
4
4

Dinding 1 (Panjang) 3.7 0 2.25 0.25 8.21 11.8 8 16.43 2,657.22 161.8 424.80
8
8

Dinding 2 (Lebar) 0.0 3.475 2.25 0.25 7.82 11.45 8 15.64 1,967.08 125.8 412.20
8
8

Kolom Lift 0.3 0.3 9.4 0.25 0.09 1.2 16 13.54 5,309.78 392.3 9.60
16
16

Balok B4 3.8 0.3 0.5 16 9.00 1,367.89 152.0 66.00


16
16
16

Balok B5 3.8 0.3 0.5 6 3.38 337.59 100.0 24.75


6
6
6

GRAND TOTAL 187.14 47,144.47 251.93 2,123.49


LOKASI : TERMINAL UTAMA
PEKERJAAN : PIT TRAVELATOR
REF : DED APPROVE

DIMENSI VOLUM
Dimensi Luas Keliling Vol Total
Type Jumlah Volume Beton Rasio Vol Bekisting
P (m) L (m) T (m) Tebal m2 m2 Besi
m3 (Kg) (kg/m3) m2
PIT TRAVELATOR
Plat Moving Walk A 6.2 2.45 1.5 0.25 15.19 17.3 2 7.60 2,342.49 308.4 8.65
2
2
2
2

Dinding Moving Walk A 6.2 0 2.25 0.25 13.95 16.9 12 41.85 8,804.09 210.4 101.40
12
12

Dinding Moving Walk A 0.0 2.45 2.25 0.25 5.51 9.4 12 16.54 2,800.59 169.3 56.40
12
12
Plat Moving Walk B 33.6 2.45 0.75 0.25 82.32 72.1 1 20.58 6,157.79 299.2 18.03
1
1
1
1

Balok Moving Walk B 33.6 0.25 0.6 0.17 1.2 2 11.76 4,380.80 372.6 80.64
2
2
2

GRAND TOTAL 98.32 24,485.76 249.05 265.12


LOKASI : TERMINAL UTAMA
PEKERJAAN : ESCALATOR
REF : DED APPROVE

DIMENSI VOLUM
Dimensi Luas Keliling Vol Total
Type Jumlah Volume Beton Rasio Vol Bekisting
P (m) L (m) T (m) Tebal m2 m2 Besi
m3 (Kg) (kg/m3) m2
ESCALATOR
Plat 5.2 2.05 1.30 0.25 10.60 14.44 4 10.60 3,329.36 314.1 56.83
4
4
4
4

Dinding 1 (Panjang) 5.2 0 2.25 0.25 11.63 14.84 8 23.27 4,212.88 181.1 59.36
8
8

Dinding 2 (Lebar) 0.0 2.05 2.25 0.25 4.61 8.6 8 9.23 1,587.00 172.0 34.40
8
8
Balok Korbel 2.95 0.4 0.70 0.25 1.18 6.7 8 2.36 3,675.05 1,557.2 13.40
8
8
8

GRAND TOTAL 45.45 12,804.30 281.73 163.99


LOKASI : TERMINAL UTAMA
PEKERJAAN : Tranch
REF : Shop Drawing

DIMENSI

Dimensi Luas Keliling


Type
P (m) L (m) T (m) Tebal m2 m2

KABEL TRANCH
Plat 34.6 1.3 0.5 0.15 44.98 71.8

Dinding 1 (Panjang) 34.6 0 0.5 0.15 17.30 70.2

GRAND TOTAL
VOLUME
Vol Total
Jumlah Volume Beton Rasio Vol Bekisting Lantai Kerja
Besi
m3 (Kg) (kg/m3) m2 m3

1 6.75 1,842.55 273.1 10.77 2.25


1
1
1
1

2 10.38 3,004.96 289.5 140.40


2
2

17.13 4,847.52 283.03 151.17 2.25


VOLUME

Urugan Anti Rayap


Pasir Urug Galian Buang Tanah
Kembali Samping Bawah
m3 m3 m3 m3 m2 m2

3.15 22.49 10.35 12.14 35.90 35.90

3.15 22.49 10.35 12.14 35.90 35.90


71.80
DETAIL PEMBESIAN
Selimut Jarak Jumlah
Nama Tulangan Dia Kg/m
Beton Tulangan Tulangan

Tul Atas Arah X (Panjang) 0.04 D 13 1.04 0.15 10


Tul Bawah Arah X (Panjang) 0.04 D 13 1.04 0.15 10
Tul Atas Arah Y (Lebar) 0.04 D 13 1.04 0.1 347
Tul Atas Bawah Arah Y (Lebar) 0.04 D 13 1.04 0.1 347

Tul Arah Horizontal 0.04 D 13 1.04 0.15 10


Tul Arah Vert 0.04 D 13 1.04 0.1 694
PEMBESIAN
Panjang Tulangan Berat Vol Total
Panjang Tekukan Ld Panjang Besi Besi 8
Murni (40d) Total (Kg) (Kg) D8

1,842.55 1,842.55
34.52 0.15 0.43 35.68 371.74 371.74 0.00
34.5 0.15 0.43 35.68 371.74 371.74 0.00
1.2 0.15 1.52 549.53 549.53 0.00
1.2 0.15 1.52 549.53 549.53 0.00
0.00
1,502.48 3,004.96
34.52 0.15 0.43 35.25 367.26 734.53 0.00
0.42 0.15 0.43 1.57 1,135.22 2,270.43 0.00
0.00

-
Besi Beton ( kg )
10 13 16 19 22 25
D10 D13 D16 D19 D22 D25

0.00 371.74 0.00 0.00 0.00 0.00


0.00 371.74 0.00 0.00 0.00 0.00
0.00 549.53 0.00 0.00 0.00 0.00
0.00 549.53 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00

0.00 734.53 0.00 0.00 0.00 0.00


0.00 2,270.43 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00

- 4,847.52 - - - -
7.40 12.50 18.94 26.71 35.81 46.24
Ket.
32
D32

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

- 4,847.52
75.76 -