Inspection Task Report No. - 1 - : Rev.01 1 Inspection Activity Hydrotest of Flowline
Inspection Task Report No. - 1 - : Rev.01 1 Inspection Activity Hydrotest of Flowline
HYDROTEST OF FLOWLINE
2 Inspection Activity Description
(Flowline Final Hydrotest of Hazar 25338(103) 6’’-300# Test Pressure @59.375 Bar ,300#)
Hydrotest is test carried out using water or other incompressible liquid to a prove integrity of a
component or system by specified pressure from the design engineer.
3 RFI No
RFI No. : 238/2023
4 Controlling document
PDO approved ITP No. & Rev. No.: BOS-QA-ITP-2035, REV-2 & BOS-QA-ITP-2037, REV-03
PDO approved Drawing No. & Rev. No.: HAZ-14-104510-LA-5880-00007-REV-02
5 Measuring devices used
Pressure Gauges (3 gauges).
Chart Recorders for Pressure and Temperature.
Acceptance
6 Criteria
PDO approved Projects Specification No. & Rev. No.: SP-1212 Rev-05
Reference Documents/Standards/Specifications: BOS-QA-PRO-2019 Rev-03 SP -2094 CL 9.2
7 Inspection Report used
NA
8 Actual values following inspection
10 Clarifications Required
4/3/202
11 Trainee Name:Adham Discipline: Date: Signature:
3
4/3/202
12 Coach Name:Saif Ref. Ind. Date: 3 Signature:
PNEUMATIC TEST
2 Inspection Activity Description
Pneumatic test is when you blow up something and see if it pops. The pneumatic test is a pressure test
you can use air or nitrogen. In our test we use nitrogen. In this test the material was covered with
tape, then gas pressure is raised as what mention in procedure. Then, soap and water are applied on
the tape. If there any gas leak, it will show air bubbles produced from the soap.
3 RFI No
RFI No.: AIP-MIC-MECH-245
4 Controlling document
PDO approved ITP No. & Rev. No.: AIP-C3100000111-ITP-18 Rev.1
PDO approved Drawing No. & Rev. No.: RMT-28-103440-MP-SITE-JS0094-0011-00-01
5 Measuring devices used
Pressure Gauges.
Acceptance
6 Criteria
PDO approved Projects Specification No. & Rev. No.: SP1173 VER3.0/SP2051 VER.5
Reference Documents/Standards/Specifications: AIP/C3100000111/CONM/27 Rev.0
7 Inspection Report used
NA
8 Actual values following inspection
The Pressure was 17.6 bar and there is no leaks found.
9 Observations (if any)
10 Clarifications Required
1. Why we use nitrogen instead of air ?
11 Trainee Name: Adham Discipline: Date: 5/3/23 Signature:
12 Coach Name: Saif Ref. Ind. Date: 5/3/23 Signature:
Firstly, the QC checked the bend pipe report (Pipe No., Heat No., and Angle). Secondly, they
put the pig from one side and push it from other side to check if there is ovality. Then, checked
the thickness by using UT which it was calibrated by V2.
3 RFI No
RFI No.: 243/20223
4 Controlling document
PDO approved ITP No. & Rev. No.: BOS-QA-ITP-2001A & Rev.03
5 Measuring devices used
UT Machine (Sonatest).
Acceptance
6 Criteria
PDO approved Projects Specification No. & Rev. No.: BOS-QA-PRO-2018 & Rev.04
Reference Documents/Standards/Specifications: BOS-QA-PRO-2018 Rev.04 / SP -2018, BOS-
QA-ITP-3003 Rev.
7 Inspection Report used
NA
8 Actual values following inspection
All the pipe numbers, heat numbers, and angles was correct.
9 Observations (if any)
10 Clarifications Required
11 Trainee Name: Adham Discipline: Date: 6/3/23 Signature:
12 Coach Name: Ahmed Ref. Ind. Date: 6/3/23 Signature:
N/A
10 Clarifications Required
What is SAP number?
What is MRIR number?
11 Trainee Name: Adham Discipline: Date: Signature:
12 Coach Name: Saif Ref. Ind. Date: Signature:
3 RFI No
N/A
4 Controlling document
N/A
5 Measuring devices used
Voltage meter.
Acceptance
6 Criteria
SP 1173 VER 3.0.
ASME B31.3 & Sec. IX.
7 Inspection Report used
8 Actual values following inspection
9 Observations (if any)
1
Clarifications Required
0
1 Discipline
Trainee Name: Adham Date: Signature:
1 :
1
2 Coach Name: Saif Ref. Ind. Date: Signature: