Date of Lab: 6th May, 2019 (Sec-E), 7th May, 2019 (Sec-A)
Lecture No: 9
Starting with the 40’ x 80’ 4-storey hall (Lecture 7) students will learn and demonstrate the
following:
1. Remove all slabs (flat plates) from suspended floors and roof and install W24x55
girders in perimeter and with central column.
2. Install floor system of W14x30 at 6’ or 10’ spacing in shorter direction that suits
the floor architecturally.
3. Annotate all beams and girders.
4. Remove central column and cross girders on roof and Install 20K10 angle-web
Joists on the roof with 1.5” Metal Roof deck, with correct height offset.
5. Install 4.75” thick light weight concrete floor on Metal deck on 2nd and 3rd floor,
with correct height offset.