Top Beam Details
Top Beam Details
Top Beam Details
650
75
Tiles kerb
300
400
75 150 75
300
625
75mm CC
75 150 7575
1-12mmØ in btwn. st. Compacted Sand/Soil Mass Concrete
12mmØ @ 150mm c/c 150
12mmØ @ 300mm c/c 225
12mmØ @ 300mm c/c
1-12mmØ in btwn. st. BFS
250
10 mmØ Ring 150 c/c
6-16mmØ st.
300
16mm Dia Bolt
Variable
L/3
150
L/8
75 150 60
16mmØ @ 200mm c/c
250 16mmØ @ 150mm c/c
650
225 975
50
500
75
300
225
100
Precast Pile
200 300 450 300 200
CROSS SECTION OF FOOTPATH (TYPE-02)
DESIGNED BY DRAWN BY CHECKED BY APPROVED BY STATUS: NOT FOR CONSTRUCTION
PROJECT: CONSULTANT : DRAWING TITLE :
Retaining Wall Cap Beam details NAME AAB AAB SMA SCALE: V=1:200, H=1:1000
Madani Avenue to Balu River (Major
WB-01, WB-02 & WB-04 SIGNATURE
REV DATE DESCRIPTION
Road 5) and Balu River to Shitolakkhya
River (Major Road 5A) Road Project CLIENT: CLIENT ACCEPTANCE: SEAL & SIGNATURE: DATE
24 Engineer Construction Brigade,
Zia Colony, Dhaka Cantonment, NOTES:
All Dimensions and Elevations are in meter unless otherwise mentioned in the drawings. A FIRST ISSUE
Dhaka-1206
DRAWING NO: WB-01, 03