FUEL SYSTEM
FIGURE 235
)
2
, 4
5
3 9
I 8:--ttIHI
2~866
The fuel system comprises: When the pressure of the excess fuel is greater than
o dry air filter; the calibrated pressure (OJ bar) of the single-acting
o fuel filter; valve (6), it is sent back to the tank. When starting the
o fuel tank; engine in ambient temperature conditions below
o pipes; 2° ± 2°C, the thermostarter control device enrgizes the
o fuel lift pump; solenoid valve (I) which enables the supply of fuel to
oVER 293 injection pump with rotating distributor. the thermostarter (2). The pressure drop in the
speed governor, advance unit. excess-fuel injection thermostarter fuel supply pipe activates the single-
and LDA device; acting valve that stops the fuel from returning to the
o injectors; tank and supplies constantly fuel to the thermostarter.
o device to start engine at temperatures below 2°C With the engine running, after the post-heating stage.
(Thermo-starter). the solenoid valve (I) is de-energized; this interrupts
,
the supply of fuel to the thermostarter and causes an
DESCRIPTION increase in pressure which causes the single-acting valve
to open, thus enabling the return of excess fuel to the
Fuel is drawn from fuel tank (I) by injection pump (5) tank.
and through the filters it reaches the inlet which leads
into the intake chamber of transfer pump (4).
The transfer vane pump serves to increase the fuel
pressure to cater for increased engine speed.
The fuel' then reaches the valve which regulates its
pressure inside the injection pump.
The distriQutor plunger further increases this pressure
and pushes the fuel through the delivery outlet and into
the injectors.
Fuel that leaks from the injectors is recovered by the
backflow valve and returned to the tank.
Excess fuel which returns from the injectors and from
the injection pump will feed. when necessary, the
thermostarter (2) through the solenoid valve (I).
TURBODAILY INTERCOOLER ENGINE 67
FIGURE 239
33126
PIPES
......
", -FIGURE 240'\, ;-
, .-.-...................
19184
33128
o unscreW wing nut (I), pull out the cartridge and Check that fuel pump is working efficiently_ The self-
, replace it with a new one after having cleaned its regulating pressure should be 2.5 to 0.5 bar, if not.
seat in its housing, before replacing pump 'check that push rod stroke is
2.5 to 2.6 mm.
00 ENGINE I UKBUDAILY IN I ~KCOUL~K
INJECTORS CALIBRATION
DISMANTLING
FIGURE 241 FIGURE 243 )
[IJ-------'f
[IJ-------
00000
INJECTOR COMPONENTS
I. Injector body - 2. Injection Pressure Adjustment Shim - 3. Spring - 4. Plate
- 5. Spacer - 6. Nozzle Body - 7. Nozzle Retaining Nut.
FIGURE 24-4
FIGURE 242
33~3S
FIGURE 245
-----+~;d-----15
2 ------+--¥~1£.41.,.1
-----14
5--------t7..1-~~~
,..---12
9--------:::~--__1Hf. tI1
7 9
-
B 5 FIGURE 2-48
19198
I. Fuel Inlet - 2. Solenoid Valve - 3. Axial Groove - 4. Compression
Chamber - 5. Fuel Passage between Pumping Element and Injectors - 6.
Distributor Plunger - 7. End-Of-Delivery Hole - 8. Slider - 9. Injector.
DELIVERY STAGE
.FIGURE 2-47
& 5 4 3
19200
5 3 4
19199
"- -
FIGURE 2-49 .-
~.
FIGURE 251 "
•.....- J - - - - 4
""".J+j~---3
'- I --tlt---t--- 2
'Z-_---5
19201
18588
STARTER
FIGURE 252.
6723
I. Starter Lever - 2. Leaf Spring - 4. Slider - 5. Adjustment Sleeve - 6. Solenoid Valve - 7. Compression Chamber.
When solenoid valve (6) is supplied with power, fuel Thus the full stroke of the pumping element is utilised
flows into compression chamber (7): in this condition for the effective delivery to the injectors.
the counterweights of governor sleeve (5) are closed;
leaf spring (2) then pushes lever (I) and slider (4) into
the excess-fuel position.
FIGURE 253 -
JI
7148
I. Starter Lever - 2. Leaf Spring - 3. Tension Lever - 4. Slider - 5. Adjustment Sleeve - 6. Solenoid Valve - 7. Counterweights - 8. Correction Lever.
Once the engine has started, the effect of centrifugal In this condition slider (4) moves across and causes
force due counterweights (7) opening causes adjust- minimum delivery.
ment sleeve (5) to move axially. pushing starter lever
(I) into contact with tension lever (3) and thus
compressing leaf spring (2).
START OF DELIVERY TO MATCH LOAD (LFB)
FIGURE 25-4
---------3
1+--->c:t------4
+------5
30434
DESCRIPTION
The device for correcting start of delivery to match As the r.p.m. of the injection pump increase. regardless
load (LFB) governs the transfer pressure that controls of the position of the external acceleration lever, the
the advance unit of the injection pump. governor counterweights, due to centrifugal force,
This allows the device to adjust the injection advance move governor sleeve (4, Fig. 255) along the governor
according to the delivery of fuel when engine speed spindle (2), thus aligning hole (3) with groove (6) and
increases or decreases. By doing so it reduces engine hole (7). Part of the fuel is discharged through passages
noise (smoother running). ( I and 5) into the supply chamber, thus causing a
reduction in the transfer pressure inside the pump and
OPERATION therefore a reduction in the injection advance.
.
FIGURE 255
.
., ~ ~
If, on the contrary, the r.p.rl). of the injection pump
decrease, the movement of sleeve (4) will not align hole
(3) with groove (6) and hole (7). thus. since there is no
fuel discharge. the pressure inside the pump will
increase the injection advance.
2---+-+==:::::::
3--------'.cAftt€E~
4----~~~-
5----fF~~~~f
6~r-ttm~iiiPfQ~
3~53
19202
FIGURE 259
OPERATION
FIGURE 257
m-------==~
m---I'!,~~~==~~
19203
Remove: cup (2), spring (3) and cup (4). Remove fixing
Fix injection pump (I) to plate (2) of Adjustable bolts and take off LDA cover (I).
Support 99365014.
I UI\DUUI\IL I "'I I t:1\~UULt:1\
19209
Mark fitting position (see arrow) of diaphragm (I) in Unscrew spring load adjustment ring nut (I).
relation to cover (2).Take off lead seal (3) and remove
stop pins (5) and turbocharge maximum flow screw (4).
Remove plug (6).
FIGURE 265
FIGURE 262
2r-------l
19207
Remove seal plug (2). remove bleed screw ( I ), unscrew
Turn diaphragm (I) complete with adjustment pin (2) bolts (3) fixing cover to pump body.
and remove from housing.
19211
FIGURE 267
19212
Push out guide pin using a punch and pull out shut-off
lever (I). Measure distance between top of bush (I) and surface
of cover and note it down.
Unscrew nut (3), remove spring clip (2) and unscrew
guide bush (I) for adjustment pin.
FIGURE 268
FIGURE 271
19213
FIGURE 269
FIGURE 272
[IJ-----------.
\
FIGURE 27-4 FIGURE 277
19221
Take out speed governor assembly (I) and retain Turn the pump and using wrench 99352140 (I)
thrust washer and adjusting plate (2). unscrew the hydraulic head closing plug. Unscrew the 4
delivery connections (2).
OJ------------:IIl'...,c""'IIII~
[I)-----------iIl~
o ~
m~ 3O~1
FIGURE 282
-OJ-~-------r OJ -,:.---=-----"-.:...:.....-----,,+-
~~
/ ml---'1L--if.SS~'f=::~~·
/
m---=-:::::;;==,:~ m--~~-i?=2T-
0--4~~
19226
Using wrench (I) undo screws (2) fixing hydraulic head. Remove distributor plunger (I) complete with return
springs (2), slider (3) and spring support plate (4), and
levelling and adjusting shims from pump body.
FIGURE 280
FIGURE 283
19224
. FIGURE 281
FIGURE 284
,J
OJ--~
0 - -A
m---+~~~=~ji'lJ
m---;-r~~~~
O]_....J
18609
OJ-;;-;;..;n.~~~~
[IJ-+f-\\--W~---;":'~fnlr('
rn---ij~~~Ul--1Y-
18623 19230
Remove spring clip (I) and locking pin (2). Using socket wrench (2) undo fixing screw (I) and
remove both covers of advance unit.
FIGURE 287
18608
Move advance unit control pin (2) towards inside of Take out complete advance unit (I).
roller ring (3).
I Ul'\DVUI'\IL I II'" I CI'\\..VVLCI'\
- -
FIGURE 291 FIGURE 294
FIGURE 295
FIGURE 292
ITJI--~';:'
FIGURE 293
CHECKS
FIGURE 296 NOTE - To ensure that the eccentric ring (I Fig. 298) is
fitted correctly. position it so that transfer pressure
hole (3 Fig 298) is facing the cover. and that hole (2 Fig.
298). which is furthest away from the internal diameter
of the ring. is facing the pump identification plate.
OJ---------i=-
Fit seal (2) onto pump body using standard drift (I). TRANSFER PUMP COMPONENTS
I. Drive Shaft - 2. Spring Pads - 3. Governor Drive Gear - 4. Shim - S.
. Retaining Plate - 6. Vane Transfer Pump - 7. Eccentric Ring.
18620 18608
Place advance unit drive pin (2) in its seat in roller ring Push drive pin (2) into unit plunger connecting pin (I fig. -....-/1
( I). 303). Arrange the final section of the drive shaft as
shown in the figure.
-~-~
FIGURE 302 FIGURE 305
OJ-ii'ii"m~~"'i'::=:\"t:\-1
rn----l~~~=::rv/T11T(
0----lt~~~t~
18623
18621
Fit roller ring (I) into pump body. Insert lock pin (2) into connecting pin (3) together with
its spring clip (I).
ADJUSTING PRELOAD ON DISTRIBUTOR
PLUNGER RETURN SPRINGS ("KF Dimension")
FIGURE 309 .
. ~ ~ "
Fit sealing rings (2) and flat cover (5). Fit a I mm shim in
spring seat, fit spring (3). Fit a shim (4) in cover recess
(I) and fit cover.
NOTE: The exact number of shims must be determi- Place a dial gauge in tool 99365 150 (2), then set it to
ned on the test bench (see SVS measurement). zero on surface plate (I) with a pre-load of 6 mm.
FIGURE 310
FIGURE 307 •
1~---- .....
2
19858
Fit cross (I) into its seat. Fit spring guide pins (5), shims (4), spring support
washers (2) and springs (3) into hydraulic head (I).
FIGURE 311
---~
CD 19859
/8629
Fit distributor plunger ( I) into hydraulic head complete
Fit cam disc (I). taking care to position it with the with spring support plate (4) and two shims (2 and 3).
pumping element stop (2) facing the keyway in the
drive shaft. Fit delivery start pad (3).
FIGURE 312 CONTROL PLATE WITH NEGATIVE
ADJUSTMENT
FIGURE 314
Position tool 99365150 as shown and carry out check. The control plate with negative adjustment increases
the delivery of fuel as the engine speed increases.
KF
FIGURE 316 ~
6729
m--r-~~~~~
NOTE - Only one adjusting washer of the same size f21
should be fitted on each guide pin. ~---i--J
Fit control plate (3) placing drive pin (2) in .seat (I) in
slider. ]
FIGURE 317 . ~.~ FIGURE 320 ,"';..
FIGURE 318
FIGURE 319
OJ------+-
(lJ------f-
26353 Fit plug (3) together with bleed screw and tighten it to a
torque of 60 to 80 Nm: fit delivery valves and pressure
Place tool with dial gauge (I) on hydraulic head (2). connections (2), tightening them to a torque of 35 to 45
Nm. Fit solenoid valve (I).
ADJUSTING GOVERNOR SPINDLE (LFB)
FIGURE 326 ~)
26356
Fit spring clip (2) on plug (I) and insert them into
adjustment sleeve (3).
~~ffi
~-----[IJffi
)003
GOVERNOR COMPONENTS
I. Governor Spindle Lock Nut - 2. Washer - 3. Governor Spindle· 4. Shim
Plate - 5. Shim Washer - 6. Governor Body· 7. Counterweights - 8. Spacer
Washer - 9. Adjustment Sleeve.
GOVERNOR SPINDLE SETTING
A+ -3
Place counterweights (7), washers (5 and 8) and
adjustment sleeve (9) in governor body (6). Exact adjustment is carried out later on test bench.
FIGURE 325
CD--------
... ~\\
c~
rf 1'1:: s
Using feeler gauge (I), check axial clearance of gover-
nor (3). This clearance should be 0.25 to 0.45 mm
between pin (2) and governor (3); if not, replace
Place shim plate (4 Fig. 324) and governor in pump adjustment shim.
body. Screw in spindle (I).
CHECKING TRANSFER PRESSURE REGULATING
VALVE
FIGURE 329
OJ-------o---
L -- -.-.-/
--......_ ..
Using tool 99342141 (I), pull off spring clip (I Fig. 330),
then pull out plunger (2 Fig. 330) and spring (3 Fig. 330)
Temporarily fit cover (3) onto pump body, screw in
of valve body (5 Fig 330).
bush ( I) so that distance between its end and the cover
surface is the same as when dismantling, with hole (2)
facing downwards pointing towards seat of feeler pin
FIGURE 330 (4).
FIGURE 333
26359
FIGURE 331
FIGURE 335
19246
192+4
19247
1924S
21--------...,
'.
FIGURE 340
19252
If Measurement « F» is not to specification, correct by Remove cut-away cover and complete diaphragm,
turning adjustment screw (I) with allen key (2). then fil adjustment shim (2) and spring (I).
FIGURE 341
30670
Fit cut-away cover (2) without adjustment screw, rest Place tool from kit 99395622 (3) on cover (I) with
spindle of dial gauge ( I) on diaphragm disc (3), preload curved part in contact with lever (2). The exact fitting
and zero it. Pushing diaphragm adjustment pin down- position of diaphragm is found when, on turning the
wards, check its maximum travel (LOA lift). Subtract diaphragm, resistance is encountered due to tapered
measurement read in Setting Table (LOA lift) from part of spindle coming into contact with feeler pin.
measurement just taken. Make up the difference with
an adjustment shim.
FIGURE 346 .
/)
19253
Fit cover (I) and secure it with its own screws. Screw in plug (I) with allen key (2).
19257
Fit ring nut (2) and guide bush ( I), complete with sealing Remove cover ( I) from pump, fit stop lever (3) and fix
ring and copper washer. onto special tool and place in it to cover with guide pin (2).
housing on pump body.
.~ -
FIGURE 348 l FIGURE 3_5I...............
Fit tool from kit 99395622 (2) onto pump body (3) and
secure it with bolts (I). .
Position tool from kit 99395622 on cover (3). Bring Keeping control plate (4) in contact with pin (6), insert
movable part (2) of tool into contact with turbocharge feeler gauge (5) as shown in Figure and check that
adjustment screw (4) and fix it in that position by means Measurement « MS» is 0.8 to I mm.
of screw (5).
Using a gauge, measure the distance between slot on
tool (I) and inner side of movable part (2): Measure-
FIGURE 355
ment « A », e.g. 11.5 mm.
FIGURE 353
26356
FIGURE 356
Fit guide pin (3), idling spring (5) and spring support disc
(4) on control plate: hook on expansion spring (2) and
drive spindle (.I), complete with ring and shim washer.
I UI\DVUAIL T IN I t:1\~VULt:1\
rIJ--1;;:::£;~~~
rn-~"'
Then fit lever (4) complete with plate (5) and control
Fit gasket (I) in housing on cover. lever (I). positioning it so that the reference mark
coincides with the one made when spindle (2) was
removed and secure lever with nut (3).
FIGURE 358
FIGURE 361.
FIGURE 359
16341
Position bottom cup (4). spring (3) and top cup (2) on
drive spindle.
7
INJECTION PUMP TESTING DATA
ENGINE: 8140.47.2700
STATIC AND DYNAMIC SPECIFICATIONS OF TEST BENCH COMPLY WITH ISO STANDARDS 400811 AND 400812.
PIPES I 680750073 (6 x 2 x 450 mm)
INJECTORS I 688 90 I 027
INJECTOR SETIING: 250 + 3 bar
CALIBRATED HOLE IN PAD: DIAM. 0.5 mm
TEST FLUID COMPLIES WITH ISO STANDARD 41 13
SUPPLY PRESSURE: 0.30 ± 0.05 bar
BURETIE EMPTYING TIME: 30 seconds
TEST OIL TEMPERATURE: WITH THERMOMETER = 38 to 42°C
: ELECTRONIC = .......oC
DATE: 01.12.90
8 - DEVIATION CURVE WITH GOVER- 12 - SETTING AND CHECKING "LFB"
NOR AT MAXIMUM DELIVERY Speed r.p.m. : I 100
Speed r.p.m.: 2100 Pressure on LDA hPa: 1000
Pressure on LDA hPa: 1000 Setting:
Average Flow .1 Average Flow
per 1000 Deliveries cm 3 : 49.5-57.5 per 1000 Deliveries cm 3: minus 20 ± 1.0
Transfer Pressure bar: minus 0.2 ± 0.1
.2 Average Flow
9 - STARTING per 1000 Deliveries cm 3 : minus 25 ± 4.0
Speed r.p.m.: 100 Advance Stroke mm: minus 0.8 ± 0.1
Average Flow Control:
per I 000 Deliveries cm 3: 40-70 .1 Average Flow
per I 000 Deliveries cm 3: 5.0 ± 3.0
Advance Stroke mm:0.6±OJ
10 - DEVELOPMENT OF TRANSFERT .2 Average Flow
PRESSURE per 1000 Deliveries
hPa: 1000 Advance Stroke
Pressure on LDA
.1 Speed r.p.m. : I 100
13 - FLOW ON BACKFLOW
Transfer Pump
VALVE
Pressure bar: 4.7-5J
.2 Speed r.p.m. : I sao Speed r.p.m.: 550
Trasfer Pump Pressure on LDA hPa:O
Pressure bar: 6.2-6.8 Backflow :41-83
J Speed r.p.m. : 1900 Flow cm 3: (26-98)
Trasfer Pump .1 Speed r.p.m.: 1900
Pressure bar: 7J-7.9 Pressure on LDA hPa: 1000
.4 Speed r.p.m.: Backflow : 55-138
Transfer Pump Flow cm 3: (40-153)
Pressure bar:
II - DEVELOPMENT OF INJECTION
ADVANCE
Pressure on LDA hPa: iooo
.1 Speed r.p.m. : I 100
Advance Stroke mm: 1.2- i.6
:(1.0-1.8)
.2 Speed r.p.m. : I sao -.....-II
Advance Stroke mm: 3J-4.1
:(3.0-4.4)
J Speed r.p.m. : 1900
Advance Stroke mm: 5.2-6.0
:(4.9-6J)
.4 Speed r.p.m.:
Advance Stroke mm:
DATE: 01.12.90
14 - DEVELOPMENT OF FLOW RATES 15 - ZERO FLOW (STOP)
.1 Speed r.p.m. :700 .1 Mechanical:
Speed r.p.m.:
Setting Point
Pressure on LDA hPa:(*) 400 Average Flow
Average Flow per 1000 Deliveries
per 1000 Deliveries em 3 : 47.5-48.5 .2 Electrical:
r.p.m.: 500 Speed r.p.m.:
.2 Speed
Pressure on LDA hPa: 1000 Voltage volt:
Average Flow Average Flow
per I000 Deliveries em 3: 56.5-60.3 per 1000 Deliveries
.3 Speed r.p.m.: 800
Pressure on LDA hPa: O 16 - FLOW AT IDLING
Average Flow .1 Speed rp·m.:500
per 1000 Deliveries em 3: 32.0-36.0 Average Flow
.4 Speed r.p.m.: 500 per 1000 Deliveries em 3: 0.0-2.0
Pressure on LDA hPa: O .2 Speed r.p.m.: 375
Average Flow Average Flow
per 1000 Deliveries em 3: 24.0-25.0 per 1000 Deliveries em 3: 13.0-14.0
.5 Speed r.p.m.: 1500 .3 Speed r.p.m.: 300
Pressure on LDA hPa: 1000 Average Flow
Average Flow per 1000 Deliveries em 3: 41.0-51.0
per 1000 Deliveries em 3: 55.5-60.5 Radial Flow:
.6 Speed r.p.m.: 1800 .4 Speed r.p.m.:
Pressure on LDA hPa: 1000 Average Flow
Average Flow per 1000 Deliveries
per 1000 Deliveries em 3: 58.5-59.5
.7 Speed r.p.m.: 1900 17 - EXTRA FLOW AUTOMATIC
Pressure on LDA hPa: 1000 STARTER
Average Flow .1 Speed r.p.m.:
per 1000 Deliveries em 3 : 55.8-59.8 Average Flow
.8 Speed r.p.m.: 2000 per 1000 Deliveries
Pressure on LDA hPa: 1000 .2 Speed
Average Flow Average Flow
per 1000 Deliveries em 3: 53.0-59.0 per 1000 Deliveries
.9 Speed r.p.m.: 2100
Pressure on LDA hPa: 1000
Average Flow
per 1000 Deliveries em 3: 49.5-57.5
.10 Speed r.p.m.: 2300
Pressure on LDA hPa: 1000
Average Flow
per I000 Deliveries em 34.5-9.5
.11 Speed r.p.m.:
Pressure on LDA hPa:
Average Flow
per I000 Deliveries
DATE: 01.12.90
18 - SETTING AND CHECKING THE NOTES:
POTENTIOMETER I) ENTRIES WITH NO ALPHANUMERIC VALUES
Supply volts: REFER TO OTHER TYPES OF INJECTION
Setting: PUMPS.
Speed r.p.m.: 3) MEASUREMENTS MADE ON INJECTION
Average Flow PUMPS FITTED WITH "KSB" MUST BE TAKEN
per 1000 Deliveries em 3: WITH THE KSB OFF.
Potentiometer Output 4) (*) TURN LDA SPRING PRELOAD ADjUST-
Voltage volts: MENT RING NUT (BOSCH REFERENCE N° 46).
Control:
Speed r.p.m.:
Average Flow
per 1000 Deliveries em 3:
Potentiometer Output
Voltage volts:
19 - STOP ELECTROMAGNET
Minimum Working
Voltage volts:
Rated Voltage volts:
Timing:
- Injection pump static advance (Output reference "A") 0 ± 05
degrees before II after II ID.C With I.P pumping in phase of delivery at I mm from BDC
- Or with piston at IDC and injection pump pumping in phase of delivery at I ± 0.04 mm from BDC
- Engine idling speed without load: 77S ± 2S rpm
REMARKS:
I) References for which no letters or numbers are given are reserved for other injection pump
designs.
2) For a conrect adjustment of injecton pumps on the electric bench, conform to the manual
IVECO Technical Publications and Training No. XXXXXXXXX
3) Measurements taken on injection pumps equipped with "KSB" must be performed with the
same at rest.
6) For adjusting the starting point (ARF valve) add a 12.0 mm spacer to the third delivery stop.
Sheet 4/4
DAJLY - TURBODAJLY - TURBODAILY 4X4 FEEDING 97
Thermometer
Influx
Defluxion
: S5 ± I °C
Ixi
- =
Backflow chock: 121 0,60 mm - Electronic ±4°C
REMARKS:
I) References for which no letters or numbers are given are reserved for other injection pump
designs.
2) For a correct adjustment of injection pumps on the electric bench, conform to the manual
IVECO Technical Publications and Training No. XXXXXXXXX
3) Measurements taken on injection pumps equipped with "KSB" must be performed with the
same at rest.
./'.
6) For adjusting the starting point (ARF valve) add a 12.0 mm spacer to the third delivery stop.
Sheet 4/4
DAILY - TURBODAJLY - TURBODAILY 4X4 FEEDING 101
Timing:
- Injection pump static advance (Output reference "A") 15 ± 05 degrees
before IXI after II TDC with I.P pumping in phase of delivery at I mm from BD.C
- Or with piston at TDC and injection pump pumping in phase of delivery
at 1.1 S ± 0.04 mm from BD.C
- Engine idling speed without load: 7S0 ± 2S rpm
REMARKS:
I) References for which no letters or numbers are given are reserved for other injection pump
designs.
2) For a correct adjustment of injection pumps on the electric bench, conform to the manual
IVECO Technical Publications and Training No. XXXXXXXXX
3) Measurements taken on injection pumps equipped with "KSB" must be performed with the
same at rest.
6) For adjusting the starting point (ARF valve) add a 12.0 mm spacer to the third delivery stop.
Sheet 4/4
DAlLY - TURBODAILY - TURBODAlLY 4X4 FEEDING 105
- Pipes: I 680 750 073 (6X2X450) Bench test control box: EPS 865
- Injectors: 1688 90 I I 16 Signal converter: EPS 9 10
- Calibrated hole pad: d='" mm - Supply pressure bar 0.35 ± 0.05
- Injector setting: 207 + 3 bar - Burette emptyng time 30"
- Backfiow chock: '" = 0.75 mm - Test fluid ISO 4113
- Test cables: Temperature at:
I) Delivery actuator: KDEP 1865/5 • Defluxion: Electronic 45°C
2) Injection start electromagnetic valve: KDEP 1865/6 • Influx: Thermometer 35 + 40°C
• Wa~ing state 1100
• Recovery signaling voltage 2500 mv
Denomination:
K mm: 3.74
KF mm: K-oT
SVS max mm:
FH mm:
REMARKS:
I) References for which no letters or numbers are given, are reserved for other injection
pump designs.
2) Checking HDK transducer in only allowed with EPS 910 signal converter.
3) Concerning the bench test of injection pump, conform to the manual IVECO Technical
Publications and Training No. XXXXXXXX
! ~ \
-l~yA
I-c I42032A I
I. Wax thermal bulb - 2. Control lever - 3. Flexible connecting cable - 4. Eccentric pin -
5. Rolkarrier ring - 6. Advance changer piston - a. Lever position (2) in cold start condition - .
b. Lever position (2) in normal operating condition
Description
Rotary injection pumps, With mechanical speed governoc that
are frtted on the engines we dealt with in this publication. are
equipped with a cold injection advance automatic device
(K5B). This tool has the purpose to set the injection advance,
below a given temperature, to a greater value than that static
of pump fitting to the engine, and to reset it by degrees to the
value of this latter; as temperature rises.
Operation
KSB cold injection advance automatic device is a mechanical
type electric drive tool that mainly consists of a wax thermal
bulb (I) that acts on the advance changer control lever (2),
through a pushing rod and a connecting cable (3). When
starting a cold engine, the thermal bulb (I) pushing rod, that
operates on the connecting cable (3), is placed at back
position: consequently the lever (2) is kept in position "a". In
this condition the eccentric pin (4) (which is operated by the
lever (2»), changes the position of roll carrier nng (5) with
respect to its normal position and, in its turn. it causes piston
'''''I/'~~_::::::r4+1\.7)
1420341
(6) to move, thus producing an increase of advance with
Remove the cover of advance changer piston. fit tool
respect to the value of fitting static advance. At engine start 99365143 (7) and set it to zero.
the resistance existing in the thermal bulb (I) is fed by 5upplya 12V voltage to the thermal bulb (I) ofKSB to cut out
alternator 0+. The heat generated by the flow of current, this lattec
heats the wax that expands and causes pushing rod to come --'-- ..........--
out, resetting the lever (2) to position "b" by degrees.
~.I KSB device is cut out when the lever (2) is released.
In this way the extra advance is cancelled, since the parts of
advance changer come back to their normal operating position. ........
The full cut-out of KSB device is achieved after about 3-4 Shift the lever (2) leftward, so as to put the pin (4, Fig. 246) in
minutes of operation. contact with roll canner ring (5, Fig. 246). In this cond~ion, check
with thickness gauge (4) that a distance, according to the
prescribed value, existS between the lever (2) and the stop (3).
Otherwise, loosen the screws (0=» and position in the proper
way the stop (3), then tighten the screws (0=»: disconnect the
Check and adjustment thermal bulb. Set the lever (2) so as to read, on tool 99365 14 3,
a piston (4, Fig. 246) travel of the advance changec equal to
The check and adjustment, if required, of K5B tool is the prescribed value, otherwise loosen the clamp (6) and
carried out with the injection pump placed on a test tighten it again after placing it conveniently on the cable (5). Fit
bench. then thermal bulb (I).
110 FEEDING DAILY - TURBODAILY - TURBODAILY 4X4
FEED PUMP
I INJECTORS
The check and setting of injectors IS carried out by means of
tool 99305017: the setting value must be the same aIS that
indicated in the following table:
(
~--
SmlNG
ENGINE
--~ ' - '
PRESSURE I
I 814067F 120+8
-- ~---