NB Constructions

Sub contractor: Samsheer


FOOTING
Drawing No/Rev No :- M3M-STR-P.FDN.Plan.-02
Date of Receipt (Drg.) Foundation Layout & RC Details
Nos. Of
Total Total Lenght in Mtr Dia wise
Description of Bar DIA Nos. Of Bar/ Cutting
Sl No Nos. of Bend
Bar Mark (mm) Footing Footing Length (in MM)
Bar 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

X13/Y2 (F6)
Bottom Short
Ra 20 1 55 55 -80 5624 - - - - 309.32 -
Bar
0 - - - - - -
Bottom Long
Rb 20 1 55 55 -80 5624 - - - - 309.32 -
Bar
0 - - - - - -
0 - - - - - -
Top short bar Rc 12 1 28 28 -48 6973 - - 195.236 - - -
0 - - - - - -
0 - - - - - -
Top Long bar Rd 12 1 28 28 -48 6973 - - 195.236 - - -
350 0 - - - - - -
1375 0 - - - - - -
0 - - - - - -

X13/Y1 (F3) 0 - - - - - -
Bottom Short
Ra 16 1 35 35 -64 3739 - - - 130.87 - -
Bar
0 - - - - - -
Bottom Long
Rb 16 1 35 35 -64 3739 - - - 130.87 - -
Bar
0 - - - - - -
0 - - - - - -
Top short bar Rc 12 1 15 15 -48 4324 - - 64.866 - - -
0 - - - - - -
0 - - - - - -
Top Long bar Rd 12 1 15 15 -48 4324 - - 64.866 - - -
300 0 - - - - - -
875 0 - - - - - -
0 - - - - - -
Remarks: 0.000 0.000 520.204 261.744 618.640 0.000
0.395 0.617 0.889 1.580 2.469 3.858

0.000 0.000 462.403 413.620 1527.506 0.000


0.000 0.000 0.462 0.414 1.528 0.000