Bar Bending Schedule

Contractor Name : Property Deplopment Limited (PDL)

Name of Work : SEZL Bridge Project


Location of Work : Pier-3 (420D)

Client : Sirajganj Economic Zone Limited (SEZL)


Consultant : Development Design Consultants Limited
Pile Length= 58 m
Nos. of Total Bar
Sl. Dia bar Spacing Shape No of bar
Bar DescriptionBar Mark Bar Length
Lap (nos)
No. mm m a a no.
1 Main Bar P1a+P1b 32 0.11 59.864 28 5.000
2 Main Bar P1c 32 0.1 31.732 28 2.00
3 Spiral P2a 16 0.075 3.249 13 43.32 3.00
4 Spiral P2b 16 0.075 3.249 34 110.48 9.00
4 Spiral P2c 16 0.15 3.249 370 1,202.23 100.00
954 954

5 Inner P3 25 2 2.919 16 1.00


6 Inner P3 16 2 2.919 14 1.00

7 Space Bar P4 16 2 92
Supportin
8 25 10 2.000 3 6 0.00
g Bar
Supportin
9 25 9.3 1.400 3 4.20 0.00
g Bar
10 Tie Bar 16 1.97 1.100 30 33.00 0.00
11 Hook Bar 25 5.160 4 20.64 0.00
12 Separator 25 0.100 14 1.40 0.00
13 Hook Holder 25 1.000 2 2.00 0.00

QS PM Engineer
Contractor Contractor SEZL
Date : 25.12.2022

Pile Length = 58.00 m


Pile Type : Cast-in-Situ Pile
Pile Number : 36,37,38,39,40,41,42,44,45

Pile dia = 1.200 m


Total lap Length of Total Length Unit
Total Weight Remarks
Length of
length Each bar Weight
Lap (m)
(m) m m kg/m Kg
1.755 8.775 68.639 1,921.89 6.32 12,148.26
1.755 3.510 35.242 986.78 6.32 6,237.40
4.874 14.62 57.95 1.58 91.57
4.874 43.87 154.34 1.58 243.90
4.874 487.39 1689.62 1.58 2,670.02
1.050 1.05 3.969 63.50 3.86 244.97
0.700 0.70 3.619 50.66 1.58 80.05

0.550 50.60 1.58 79.96

0.000 0.00 2.000 6.00 3.86 23.15

0.000 0.00 1.400 4.20 3.86 16.20


0.000 0.00 1.100 33.00 1.58
0.000 0.00 5.16 20.64 3.86 79.63
0.000 0.00 0.1 1.40 3.86 5.40
0.000 0.00 1.0 2.00 3.86 7.72
Total = 21,928.22 21928.221

DGM
SEZL
Bar Bending Schedule

Contractor Name : Property Deplopment Limited (PDL)

Name of Work : SEZL Bridge Project


Location of Work : P-3 (420 DWR)

Client : Sirajganj Economic Zone Limited (SEZL)


Consultant : Development Design Consultants Limited
Pile Length= 58 m
Nos. of Total Bar
Sl. Dia bar Spacing Shape No of bar Lap
Bar DescriptionBar Mark Bar Length
(nos)
No. mm m a a no.
1 Main Bar P1a+P1b 32 0.11 63.225 28 5.000
2 Main Bar P1c 32 0.1 35.732 28 3.000
3 Spiral P2a 16 0.075 3.249 13 43.32 3.00
4 Spiral P2b 16 0.075 3.249 34 110.48 9.00
4 Spiral P2c 16 0.15 3.249 393 1,276.96 106.00
954 954

5 Inner P3 25 2 2.919 18 1.00


6 Inner P3 16 2 2.919 32 1.00

7 Space Bar P4 16 2 94
Supportin
8 25 10 2.000 3 6 0.00
g Bar
Supportin
9 25 9.3 1.400 3 4.20 0.00
g Bar
10 Tie Bar 16 1.97 1.100 30 33.00 0.00
11 Hook Bar 25 5.160 4 20.64 0.00
12 Separator 25 0.100 14 1.40 0.00
13 Hook Holder 25 1.000 2 2.00 0.00
Date : 25.12.2022

Pile Length = 58.00 m


Pile Type : Cast-in-Situ Pile
Pile Number : 9th (43) Test pile.

Pile dia = 1.200 m


Total lap Length of Total Length Unit
Total Weight Remarks
Length of
length Each bar Weight
Lap (m)
(m) m m kg/m Kg
1.755 8.775 72.000 2,016.00 6.32 12,743.11
1.755 5.265 40.997 1,147.92 6.32 7,255.96
4.874 14.62 57.95 1.58 91.57
4.874 43.87 154.34 1.58 243.90
4.874 516.63 1793.60 1.58 2,834.33
1.050 1.05 3.969 71.43 3.86 275.59
0.700 0.70 3.619 115.79 1.58 182.98

0.550 51.70 1.58 81.70

0.000 0.00 2.000 6.00 3.86 23.15

0.000 0.00 1.400 4.20 3.86 16.20


0.000 0.00 1.100 33.00 1.58
0.000 0.00 5.16 20.64 3.86 79.63
0.000 0.00 0.1 1.40 3.86 5.40
0.000 0.00 1.0 2.00 3.86 7.72
Total = 23,841.24 23841.236
Bar Bending Schedule

Contractor Name : Property Deplopment Limited (PDL)

Name of Work : SEZL Bridge Project


Location of Work : Pier-3 (500DWR)

Client : Sirajganj Economic Zone Limited (SEZL)


Consultant : Development Design Consultants Limited
Pile Length= 58 m
Nos. of Total Bar
Sl. Dia bar Spacing Shape No of bar
Bar DescriptionBar Mark Bar Length
Lap (nos)
No. mm m a a no.
1 Main Bar P1a+P1b 32 0.11 59.864 24 5.000
2 Main Bar P1c 32 0.1 31.732 24 2.00
3 Spiral P2a 16 0.075 3.249 13 43.32 3.00
4 Spiral P2b 16 0.075 3.249 34 110.48 9.00
4 Spiral P2c 16 0.15 3.249 370 1,202.23 100.00
954 954

5 Inner P3 25 2 2.919 16 1.00


6 Inner P3 16 2 2.919 14 1.00

7 Space Bar P4 16 2 92
Supportin
8 25 10 2.000 3 6 0.00
g Bar
Supportin
9 25 9.3 1.400 3 4.20 0.00
g Bar
10 Tie Bar 16 1.97 1.100 30 33.00 0.00
11 Hook Bar 25 5.160 4 20.64 0.00
12 Separator 25 0.100 14 1.40 0.00
13 Hook Holder 25 1.000 2 2.00 0.00
Date : 25.12.2022

Pile Length = 58.00 m


Pile Type : Cast-in-Situ Pile
Pile Number : 36,37,38,39,40,41,42,44,45

Pile dia = 1.200 m


Total lap Length of Total Length Unit
Total Weight Remarks
Length of
length Each bar Weight
Lap (m)
(m) m m kg/m Kg
1.755 8.775 68.639 1,647.34 6.32 10,411.16
1.755 3.510 35.242 845.81 3.86 3,264.82
4.874 14.62 57.95 1.58 91.57
4.874 43.87 154.34 1.58 243.90
4.874 487.39 1689.62 1.58 2,670.02
1.050 1.05 3.969 63.50 3.86 244.97
0.700 0.70 3.619 50.66 1.58 80.05

0.550 50.60 1.58 79.96

0.000 0.00 2.000 6.00 3.86 23.15

0.000 0.00 1.400 4.20 3.86 16.20


0.000 0.00 1.100 33.00 1.58
0.000 0.00 5.16 20.64 3.86 79.63
0.000 0.00 0.1 1.40 3.86 5.40
0.000 0.00 1.0 2.00 3.86 7.72
Total = 17,298.60 21928.221
Bar Bending Schedule

Contractor Name : Property Deplopment Limited (PDL)

Name of Work : SEZL Bridge Project


Location of Work : P-3 (500 DWR)

Client : Sirajganj Economic Zone Limited (SEZL)


Consultant : Development Design Consultants Limited
Pile Length= 58 m
Nos. of Total Bar
Sl. Dia bar Spacing Shape No of bar
Bar DescriptionBar Mark Bar Length
Lap (nos)
No. mm m a a no.
1 Main Bar P1a+P1b 32 0.11 63.225 24 5.000
2 Main Bar P1c 32 0.1 35.732 24 3.000
3 Spiral P2a 16 0.075 3.249 13 43.32 3.00
4 Spiral P2b 16 0.075 3.249 34 110.48 9.00
4 Spiral P2c 16 0.15 3.249 393 1,276.96 106.00
954 954

5 Inner P3 25 2 2.919 18 1.00


6 Inner P3 16 2 2.919 32 1.00

7 Space Bar P4 16 2 94
Supportin
8 25 10 2.000 3 6 0.00
g Bar
Supportin
9 25 9.3 1.400 3 4.20 0.00
g Bar
10 Tie Bar 16 1.97 1.100 30 33.00 0.00
11 Hook Bar 25 5.160 4 20.64 0.00
12 Separator 25 0.100 14 1.40 0.00
13 Hook Holder 25 1.000 2 2.00 0.00
Date : 25.12.2022

Pile Length = 58.00 m


Pile Type : Cast-in-Situ Pile
Pile Number : 9th (43) Test pile.

Pile dia = 1.200 m


Total lap Length of Total Length Unit Total Weight Remarks
Length of
length Each bar Weight
Lap (m)
(m) m m kg/m Kg
1.755 8.775 72.000 1,728.00 6.32 10,920.96
1.755 5.265 40.997 983.93 3.86 3,797.96
4.874 14.62 57.95 1.58 91.57
4.874 43.87 154.34 1.58 243.90
4.874 516.63 1793.60 1.58 2,834.33
1.050 1.05 3.969 71.43 3.86 275.59
0.700 0.70 3.619 115.79 1.58 182.98

0.550 51.70 1.58 81.70

0.000 0.00 2.000 6.00 3.86 23.15

0.000 0.00 1.400 4.20 3.86 16.20


0.000 0.00 1.100 33.00 1.58
0.000 0.00 5.16 20.64 3.86 79.63
0.000 0.00 0.1 1.40 3.86 5.40
0.000 0.00 1.0 2.00 3.86 7.72
Total = 18,561.08 23841.236
Coprasion on 420 DWR Between 500 DWR

Unit
Unit Total
Desciption Grade Nos differenc
quantity Quantity
e

Service 420dwr 9 21928.2 197354


4629.6
Pile
500dwr 9 17298.6 155687
420dwr 1 23841.2 23841.2
Test Pile 5280.2
500dwr 1 18561.1 18561.1
Total
Quantity Quantity
Difference(t raised
on)

41.7
46.9

5.3