Sirajganj Economic Zone Limited.

Measurement

Budget:Repair and Beautificaton of main gate on sirajganj


economic zone ltd.

Description of Items/ Volume


SL NO. Service Length Wide Height Volume of Truck
1 Earthwork 550 4 1 2200 220
Main Gate Painting
SL No. Description Length wide Area
62.5mmx62.5mmx 4mm ; 2761.76 0.87117 2646.55
Flat Bar (37mmX5mm ) 3493.2 0.27552 1059.3
Total Area 3705.85

SL No. 1L Cover(sft)
3 Materials for color 70
ed.

n sirajganj

No. Truck
10

Total(L)
52.94075
Sirajganj Economic Zone Limited.
Budget on
Renovation of main gate with Arboriculture work.

HBB Repair And Preparing Garden Area.


Description of Remarks
SL NO. Unit Quantity Unit price Total Quantity(Taka)
Items/ Service

1 Worker/Labour Nos 15 550 8250

2 Meson Nos 4 800 3200

3 Soil/Sand(FM-0.8) Nos 10 3000 30000

4 Water pump setting Nos 1 500 500


5 Cable ft 30 30 900

6 Flexible Pipe ft 250 20 5000


Sub Total 47850
Painting work on main gate(Enamel paint)

1 Labour Charge Sft 8 3706 29648

2 Material L 53 300 15900


Sub Total 45548
Electrical work
Supply and installation of Pcs
1 LED light.
4 3000 12000
Supply and installation of Pcs
2 Aviation light.
5 6500 32500
Sub Total 44500
Arboriculture work
1 Fertile Soil Nos/Bag 35 100 3500
2 Flowering tree Nos 500 20 10000
3 Transport Lump sum 2000
4 Worker/Labour Nos 5 550 2750
Sub Total 18250
Grand Total Amount 156148
In Word:One lac Fifty Six Thousand One houndred Fourty Eight taka only.