Asphalt Plant (PDL)
Asphalt Plant (PDL)
(N-8) Highway to 4 Lane with Separate Lane for Slow Moving Venhicle
Executing Agency SWO West Bangladesh Army
Asphalt Plant Calibration
Project Name : Dhaka-Khulna (N-8) Project Package No : 03 Date: 01.04.2018
Contractor : JV of PDL- CAMCE-CR24B
Consultant : HENAN(CHINA) & 24 Engr. Construction Brigade.
Asphalt Plant Name :
Model Number :
Scale: Bitumen
Observed Load (kg) Remarks
SL NO. Actual Load (kg)
Loading (kg) Unloading (kg) Average
0 0.00 0.00 0.45 0.23
1 5.00 5.00 5.02 5.01
2 10.00 10.00 10.30 10.15
3 15.00 15.00 15.40 15.20
4 20.00 20.00 20.10 20.05
5 25.00 25.00 25.54 25.27
6 30.00 30.00 30.23 30.12
7 35.00 35.00 35.37 35.19
8 40.00 40.00 40.32 40.16
9 50.00 50.00 50.12 50.06
10 60.00 60.00 60.55 60.28
11 70.00 70.00 70.12 70.06
12 80.00 80.00 80.32 80.16
13 100.00 100.00 99.12 99.56
14 120.00 120.00 120.00 120.00
Lab.Technician Lab.Technician Material Engineer Material Engineer Representative
Contractor Consultant Contractor Consultant 24 Engr.C.Brigade
Improvement of Jatrabari Intersection to Pachchar - Bhanga on Dhaka-Mawa-Khulna
(N-8) Highway to 4 Lane with Separate Lane for Slow Moving Venhicle
Executing Agency SWO West Bangladesh Army
Asphalt Plant Calibration
Project Name : Dhaka-Khulna (N-8) Project Package No : 03 Date: 01.04.2018
Contractor : JV of PDL- CAMCE-CR24B
Consultant : HENAN(CHINA) & 24 Engr. Construction Brigade.
Asphalt Plant Name :
Model Number :
Scale: Bitumen
140.00
120.00
100.00
80.00
60.00
40.00
20.00
0.00
0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00
Lab.Technician Lab.Technician Material Engineer Material Engineer Representative
Contractor Consultant Contractor Consultant 24 Engr.C.Brigade
Improvement of Jatrabari Intersection to Pachchar - Bhanga on Dhaka-Mawa-Khulna
(N-8) Highway to 4 Lane with Separate Lane for Slow Moving Venhicle
Executing Agency SWO West Bangladesh Army
Asphalt Plant Calibration
Project Name : Dhaka-Khulna (N-8) Project Package No : 03 Date: 01.04.2018
Contractor : JV of PDL- CAMCE-CR24B
Consultant : HENAN(CHINA) & 24 Engr. Construction Brigade.
Asphalt Plant Name :
Model Number :
Scale: Filler
Observed Load (kg) Remarks
SL NO. Actual Load (kg)
Loading (kg) Unloading (kg) Average
0 0.00 0.00 0.30 0.15
1 5.00 5.00 4.70 4.85
2 10.00 10.00 9.90 9.95
3 20.00 20.00 19.80 19.90
4 30.00 30.00 29.80 29.9
5 40.00 40.00 39.80 39.9
6 50.00 50.00 49.70 49.85
7 60.00 60.00 59.80 59.9
8 70.00 70.00 69.80 69.9
9 80.00 80.00 79.70 79.85
10 90.00 90.00 89.80 89.9
11 100.00 100.00 100.00 100.00
Lab.Technician Lab.Technician Material Engineer Material Engineer Representative
Contractor Consultant Contractor Consultant 24 Engr.C.Brigade
Improvement of Jatrabari Intersection to Pachchar - Bhanga on Dhaka-Mawa-Khulna
(N-8) Highway to 4 Lane with Separate Lane for Slow Moving Venhicle
Executing Agency SWO West Bangladesh Army
Batching Plant Calibration
Project Name : Dhaka-Khulna (N-8) Project Package No : 03 Date: 01.04.18
Contractor : JV of PDL- CAMCE-CR24B
Consultant : HENAN(CHINA) & 24 Engr. Construction Brigade.
Asphalt Plant Name :
Model Number :
Scale: Filler
120.00
100.00
f(x) = 0.999392318911036 x − 0.0510614163020691
80.00
60.00
40.00
20.00
0.00
0.00 20.00 40.00 60.00 80.00 100.00 120.00
Lab.Technician Lab.Technician Material Engineer Material Engineer Representative
Contractor Consultant Contractor Consultant 24 Engr.C.Brigade
Improvement of Jatrabari Intersection to Pachchar - Bhanga on Dhaka-Mawa-Khulna
(N-8) Highway to 4 Lane with Separate Lane for Slow Moving Venhicle
Executing Agency SWO West Bangladesh Army
Asphalt Plant Calibration
Project Name : Dhaka-Khulna (N-8) Project Package No : 03 Date: 01.04.2018
Contractor : JV of PDL- CAMCE-CR24B
Consultant : HENAN(CHINA) & 24 Engr. Construction Brigade.
Asphalt Plant Name :
Model Number :
Scale: Coarse Aggregate
Observed Load (kg) Remarks
SL NO. Actual Load (kg)
Loading (kg) Unloading (kg) Average
0 0.00 0.00 1.00 0.50
1 10.00 10.00 9.00 9.5
2 20.00 20.00 19.00 19.5
3 40.00 40.00 39.00 39.50
4 60.00 60.00 59.00 59.5
5 80.00 80.00 79.00 79.5
6 100.00 100.00 99.00 99.50
7 140.00 140.00 139.00 139.5
8 180.00 180.00 179.00 179.5
9 220.00 220.00 219.00 219.50
10 280.00 280.00 279.00 279.5
11 300.00 300.00 299.00 299.5
12 340.00 340.00 339.00 339.50
13 380.00 380.00 379.00 379.5
14 420.00 420.00 419.00 419.5
15 450.00 450.00 449.00 449.50
16 500.00 500.00 499.00 499.5
17 540.00 540.00 539.00 539.5
18 600.00 600.00 599.00 599.50
19 640.00 640.00 639.00 639.5
20 700.00 700.00 699.00 699.5
21 750.00 750.00 749.00 749.50
22 800.00 800.00 799.00 799.5
23 900.00 900.00 899.00 899.5
24 1000.00 1000.00 999.00 999.50
25 1100.00 1100.00 1099.00 1099.5
26 1200.00 1200.00 1199.00 1199.5
27 1300.00 1300.00 1299.00 1299.50
28 1400.00 1400.00 1399.00 1399.5
29 1500.00 1500.00 1499.00 1499.5
30 1600.00 1600.00 1600.00 1600.00
Lab.Technician Lab.Technician Material Engineer Material Engineer Representative
Contractor Consultant Contractor Consultant 24 Engr.C.Brigade
Improvement of Jatrabari Intersection to Pachchar - Bhanga on Dhaka-Mawa-Khulna
(N-8) Highway to 4 Lane with Separate Lane for Slow Moving Venhicle
Executing Agency SWO West Bangladesh Army
Asphalt Plant Calibration
Project Name : Dhaka-Khulna (N-8) Project Package No : 03 Date: 01.04.2018
Contractor : JV of PDL- CAMCE-CR24B
Consultant : HENAN(CHINA) & 24 Engr. Construction Brigade.
Asphalt Plant Name :
Model Number :
Scale: Coarse Aggregate
Plant Calibration
1800.00
1600.00
f(x) = 0.999992888984221 x − 0.447587150744312
1400.00
1200.00
1000.00
800.00
600.00
400.00
200.00
0.00
0.00 200.00 400.00 600.00 800.00 1000.00 1200.00 1400.00 1600.00 1800.00
Lab.Technician Lab.Technician Material Engineer Material Engineer Representative
Contractor Consultant Contractor Consultant 24 Engr.C.Brigade