SHOP DRAWING TRACKING LIST

COLOR LEGEND PACKAGE (ACC BUILD - SUBMITTAL)


OPEN IN REVIEW (SSP) Booking/Reserved SH Ref. No for PIC Reference No Not In Use Overall Project OVPR
OVERDUE (SSP) Approved With Comments Pending Mr. Khor's signature (ACC Submittal "OPEN")
Rasau Pond Intake and Raw Water Pumping IWPS
Station
WITHDRAWAN REJECTED Approval Submission To AMS (in progress) Raw Water Pipeline RWP
SUPERSEDED REVIEW VOIDED Approval Submission To AMS Water Treatment Plant WTP

WORKFLOW - ACC Build Submittal (7 days) SSP RESPONSE (FINAL WORKFLOW) SUBMISSION TO AMS (FOR INFO ONLY)
NO REQUEST DATE PACKAGE Discipline ISSUED ACC ID ACC Docs Folder
Code DRAWING_NO DRAWING_TITLE REV REV DATE TO PIC Date Due Date No. STATUS2 DATE REVIEW STATUS WF Status DATE. DTN NO
(Archive) REMARKS

CIVIL AND STRUCTURE (CNS)


GEOTECHNICAL DETAILS (GEO)

1 14/12/2022 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-PIL-GEO-000001 SH : PROPOSED INSTRUMENTED BI-DIRECTIONAL PRELIMINARY H00 13/12/2022 SSP Mujana 30/12/2022 11/01/2023 114 CLOSED 06/01/2023 APPROVED CLOSED 10/02/2023 RWTP-GB-AMS-DTN-000064-2023 705.2.1 - C&S
TEST PILE (PTP1-1200mm) STANDARD DETAILS 01

2 14/12/2022 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-PIL-GEO-000002 SH : PROPOSED INSTRUMENTED BI-DIRECTIONAL PRELIMINARY H00 13/12/2022 SSP Mujana 30/12/2022 11/01/2023 115 CLOSED 06/01/2023 APPROVED CLOSED 10/02/2023 RWTP-GB-AMS-DTN-000065-2023 705.2.1 - C&S
TEST PILE (PTP1-1200mm) STANDARD DETAILS 02

3 17/01/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-PIL-GEO-000003 SH : PROPOSED INSTRUMENTED BI-DIRECTIONAL PRELIMINARY H00 12/01/2023 SSP Mujana 18/01/2023 31/01/2023 138 CLOSED 03/02/2023 APPROVED CLOSED 10/02/2023 RWTP-GB-AMS-DTN-000066-2023 705.2.1 - C&S
TEST PILE (PTP2-1200mm) STANDARD DETAILS 01

4 17/01/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-PIL-GEO-000004 SH : PROPOSED INSTRUMENTED BI-DIRECTIONAL PRELIMINARY H00 12/01/2023 SSP Mujana 01/02/2023 10/02/2023 7 CLOSED 08/02/2023 Approved With CLOSED - N/A 705.2.1 - C&S
TEST PILE (PTP2-1200mm) STANDARD DETAILS 02 Comments

SH : PROPOSED INSTRUMENTED BI-DIRECTIONAL PRELIMINARY


14/02/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-PIL-GEO-000004 TEST PILE (PTP2-1200mm) STANDARD DETAILS 02 H01 13/02/2023 SSP Mujana 14/02/2023 22/02/2023 7 CLOSED 17/02/2023 APPROVED CLOSED 20/02/2023 GB-TRANSMIT-000007 705.2.1 - C&S

5 13/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-PIL-GEO-000005 SH : PROPOSED NON-INSTRUMENTED BI-DIRECTIONAL WORKING H00 11/04/2023 SSP Mujana 14/04/2023 25/04/2023 43 CLOSED 26/04/2023 APPROVED CLOSED 02/05/2023 GB-TRANSMIT-000074
TEST PILE (WTP-1200mm) STANDARD DETAILS 01

SH : PROPOSED NON-INSTRUMENTED BI-DIRECTIONAL WORKING


6 13/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-PIL-GEO-000006 TEST PILE (WTP-1200mm) STANDARD DETAILS 02 H00 11/04/2023 SSP Mujana 14/04/2023 25/04/2023 44 CLOSED 26/04/2023 APPROVED CLOSED 02/05/2023 GB-TRANSMIT-000075

LIST OF DRAWINGS (LOD)

1 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-LOD-000001 SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM : LIST OF H00 17/04/2023 SSP Mujana 19/04/2023 03/05/2023 59 CLOSED 13/05/2023 Approved With CLOSED - N/A Please provide PEPC Endorsement.
DRAWING Comments

LAYOUT PLAN (LAP)

1 13/02/2023 WTP CNS RWTP-GB-H-WTP-CBP-CNS-FOD-LAP-000001 SH - WATER TREATMENT PLANT CONCRETE BATCHING PLANT H00 01/01/2023 SSP Azizah 02/03/2023 10/03/2023 13 CLOSED 09/03/2023 Approved With CLOSED - N/A
FOUNDATION AND SLAB DETAILS Comments

SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM KING Approved With


2 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-LAP-000001 POST AND FOUNDATION LAYOUT PLAN H00 17/04/2023 SSP Mujana 19/04/2023 03/05/2023 60 CLOSED 13/05/2023 Comments CLOSED - N/A

3 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-LAP-000002 SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM KING H00 17/04/2023 SSP Mujana 19/04/2023 03/05/2023 61 CLOSED 13/05/2023 Approved With CLOSED - N/A
POST AND DECK POST TABLE Comments

4 11/05/2023 RWP CNS RWTP-GB-H-RWP-GEN-CNS-PIL-LAP-000001 SH - RAW WATER PIPELINE CUT-OFF LEVEL OF SPUN PILES AT PIPE H00 11/05/2023 SSP Syahira 11/05/2023 19/05/2023 86 CLOSED 15/05/2023 Approved With CLOSED - N/A
HORIZONTAL BENDING 22.5 Degrees CH 4975.00 - CH 5025.00 Comments

SH - RAW WATER PIPELINE CUT-OFF LEVEL OF SPUN PILES AT PIPE Approved With
5 11/05/2023 RWP CNS RWTP-GB-H-RWP-GEN-CNS-PIL-LAP-000002 HORIZONTAL BENDING 45 Degrees CH 4250.00 - CH 4275.00 H00 11/05/2023 SSP Syahira 11/05/2023 19/05/2023 87 CLOSED 15/05/2023 Comments CLOSED - N/A

STANDARD DETAIL (STD)

1 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-STD-000001 SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM GUIDE H00 17/04/2023 SSP Mujana 19/04/2023 03/05/2023 62 Step Back PENDING OPEN
FRAME DETAIL 01

SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM GUIDE


2 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-STD-000002 FRAME DETAIL 02 H00 17/04/2023 SSP Mujana 19/04/2023 03/05/2023 63 CLOSED 16/05/2023 REJECTED CLOSED

3 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-STD-000003 SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM GUIDE H00 17/04/2023 SSP Mujana 19/04/2023 03/05/2023 64 CLOSED 16/05/2023 REJECTED CLOSED
FRAME DETAIL 03

SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM GUIDE


4 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-STD-000004 FRAME DETAIL 04 H00 17/04/2023 SSP Mujana 19/04/2023 03/05/2023 65 CLOSED 15/05/2023 REJECTED CLOSED - N/A

5 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-STD-000005 SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM GUIDE H00 17/04/2023 SSP Mujana 20/04/2023 04/05/2023 66 CLOSED 15/05/2023 REJECTED CLOSED - N/A
FRAME DETAIL 05

SH - INTAKE (IRWPS) - TEMPORARY STRUTTING SYSTEM GUIDE


6 19/04/2023 IWPS CNS RWTP-GB-H-IWPS-GEN-CNS-CFF-STD-000006 FRAME DETAIL 06 H00 17/04/2023 SSP Mujana 20/04/2023 04/05/2023 67 CLOSED 15/05/2023 REJECTED CLOSED - N/A

REINFORCEMENT DETAIL (RED)


SH - WATER TREATMENT PLANT CONCRETE BATCHING PLANT PILE Approved With
1 13/02/2023 WTP CNS RWTP-GB-H-WTP-CBP-CNS-FOD-RED-000001 CAP DETAILS H00 01/01/2023 SSP Azizah 02/03/2023 10/03/2023 14 CLOSED 16/03/2023 Comments CLOSED Step back on 2/3/23 (to provide structure calculation)

CIVIL WORKS (CWS)

LAYOUT PLAN (LAP)


SH : WATER TREATMENT PLANT LOGISTICS PLAN FOR DTN- Approved With
1 11/11/2022 WTP CWS RWTP-GB-H-WTP-GEN-CWS-EAW-LAP-000001 EARTHWORK STAGE 1 H00 01/11/2022 SSP Kenneth 15/11/2022 24/11/2022 000028 CLOSED 29/11/2022 Comments CLOSED - N/A 705.2.4 - CWS

2 01/12/2022 IWPS CWS RWTP-GB-H-IWPS-GEN-CWS-EAW-LAP-000001 SH : INTAKE & PUMP StATION - LOGISTICS PLAN H00 01/11/2022 SSP Mujana 06/12/2022 14/12/2022 41 CLOSED 04/01/2023 REJECTED CLOSED - N/A 705.2.4 - CWS SSP response via email from Harshini on 4/1/23 but did not cc to
DC. DC only notified on 16/3/23.

1 of 6
SHOP DRAWING TRACKING LIST
COLOR LEGEND PACKAGE (ACC BUILD - SUBMITTAL)
OPEN IN REVIEW (SSP) Booking/Reserved SH Ref. No for PIC Reference No Not In Use Overall Project OVPR
OVERDUE (SSP) Approved With Comments Pending Mr. Khor's signature (ACC Submittal "OPEN")
Rasau Pond Intake and Raw Water Pumping IWPS
Station
WITHDRAWAN REJECTED Approval Submission To AMS (in progress) Raw Water Pipeline RWP
SUPERSEDED REVIEW VOIDED Approval Submission To AMS Water Treatment Plant WTP

WORKFLOW - ACC Build Submittal (7 days) SSP RESPONSE (FINAL WORKFLOW) SUBMISSION TO AMS (FOR INFO ONLY)

STRUCTURE (STR)
TYPICAL (TYP)
RAW WATER PIPELINE - DIMENSION DETAILS OF THRUST BLOCK
1 16/05/2023 RWP STR RWTP-GB-H-RWP-GEN-STR-MSC-TYP-099201 HORIZONTAL BEND 90* SINGLE PIPE 2400MM H00 16/05/2023 SSP Syahira 16/05/2023 24/05/2023 94 CURRENT PENDING OPEN

2 16/05/2023 RWP STR RWTP-GB-H-RWP-GEN-STR-MSC-TYP-099203 RAW WATER PIPELINE - DIMENSION DETAILS OF THRUST BLOCK H00 16/05/2023 SSP Syahira 16/05/2023 24/05/2023 95 CURRENT PENDING OPEN
HORIZONTAL BEND 90* TWIN PIPE 2400MM

3 16/05/2023 RWP STR RWTP-GB-H-RWP-GEN-STR-MSC-TYP-099205 RAW WATER PIPELINE - DIMENSION DETAILS OF THRUST BLOCK H00 16/05/2023 SSP Syahira 16/05/2023 24/05/2023 96 CURRENT PENDING OPEN
HORIZONTAL BEND 22.5* TWIN PIPE 2400MM
RAW WATER PIPELINE - DIMENSION DETAILS OF THRUST BLOCK
4 16/05/2023 RWP STR RWTP-GB-H-RWP-GEN-STR-MSC-TYP-099207 HORIZONTAL BEND 45* TWIN PIPE 2400MM H00 16/05/2023 SSP Syahira 16/05/2023 24/05/2023 97 CURRENT PENDING OPEN

TEMPORARY WORKS (TEM)

STANDARD DETAIL (STD)


1 13/01/2023 OVPR TEM RWTP-GB-H-OVPR-GEN-TEM-MTH-STD-000001 SH - METAL HOARDING DETAILS H00 13/02/2023 SSP Azizah 13/02/2023 21/02/2023 15 CLOSED 09/03/2023 REJECTED CLOSED 705.2.5 - TEM
2 3/16/2023 IWPS TEM RWTP-GB-H-IWPS-CBP-TEM-PIL-STD-000001 SH - CONCRETE BATCHING PLANT PILE LAYOUT H00 SSP Mujana

TYPICAL (TYP)
1 4/14/2023 OVPR TEM RWTP-GB-H-OVPR-GEN-TEM-GEN-TYP-000001 SH - STANDARD DRAWING : WASH THROUGH DETAIL H00 Ooi Jeh Tsong

GENERAL (GEN)

TYPICAL (TYP)
Approved With
1 3/29/2023 RWP GEN RWTP-GB-H-RWP-BNC-GEN-WPL-TYP-000001 SH - RAW WATER PIPELINE : PIPE DETAIL H00 3/22/2023 SSP Hazwani 31/03/2023 10/04/2023 31 CLOSED 4/17/2023 Comments CLOSED Step back on 31/3/23 (Resubmission with amendment)

Approved With
2 3/29/2023 RWP GEN RWTP-GB-H-RWP-BNC-GEN-WPL-TYP-000002 SH - RAW WATER PIPELINE : HEMISPHERICAL SLIP JOINT DETAIL H00 2/15/2023 SSP Hazwani 31/03/2023 10/04/2023 32 CLOSED 4/17/2023 Comments CLOSED Step back on 31/3/23 (Resubmission with amendment)

3 3/29/2023 RWP GEN RWTP-GB-H-RWP-BNC-GEN-WPL-TYP-000003 SH - RAW WATER PIPELINE : PIPE MARKING DETAIL H00 2/15/2023 SSP Hazwani 31/03/2023 10/04/2023 33 CLOSED 4/17/2023 Approved With CLOSED Step back on 31/3/23 (Resubmission with amendment)
Comments
4 4/7/2023 RWP GEN RWTP-GB-H-RWP-APT-GEN-WPL-TYP-000001 SH - RAW WATER PIPELINE : PIPE DETAIL H00 3/30/2023 SSP Hazwani 12/04/2023 20/04/2023 40 CLOSED 4/18/2023 REJECTED CLOSED Step back on 12/4/23 (Resubmission with amendment)
Approved With
5 4/7/2023 RWP GEN RWTP-GB-H-RWP-APT-GEN-WPL-TYP-000002 SH - RAW WATER PIPELINE : HEMISPHERICAL JOINT DETAIL H00 3/30/2023 SSP Hazwani 11/04/2023 19/04/2023 38 CLOSED 4/18/2023 Comments CLOSED

Approved With
6 4/7/2023 RWP GEN RWTP-GB-H-RWP-APT-GEN-WPL-TYP-000003 SH - RAW WATER PIPELINE : PIPE MARKING DETAIL H00 3/30/2023 SSP Hazwani 11/04/2023 19/04/2023 39 CLOSED 4/18/2023 Comments CLOSED

7 5/8/2023 RWP GEN RWTP-GB-H-RWP-OSP-GEN-WPL-TYP-000001 SH - RAW WATER PIPELINE : PIPE DETAILS H00 3/22/2023 SSP Hazwani - - 74 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block
8 5/8/2023 RWP GEN RWTP-GB-H-RWP-OSP-GEN-WPL-TYP-000002 SH - RAW WATER PIPELINE : HEMISPHERICAL SLIP JOINT DETAIL H00 3/22/2023 SSP Hazwani - - 75 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block
9 5/8/2023 RWP GEN RWTP-GB-H-RWP-OSP-GEN-WPL-TYP-000003 SH - RAW WATER PIPELINE : PIPE MARKING DETAIL H00 3/22/2023 SSP Hazwani - - 76 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block
10 5/8/2023 RWP GEN RWTP-GB-H-RWP-PTT-GEN-WPL-TYP-000001 SH - RAW WATER PIPELINE : PIPE DETAIL H00 4/17/2023 SSP Hazwani - - 77 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block
11 5/8/2023 RWP GEN RWTP-GB-H-RWP-PTT-GEN-WPL-TYP-000002 SH - RAW WATER PIPELINE : SPHERICAL JOINT DETAIL H00 4/17/2023 SSP Hazwani - - 78 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block
12 5/8/2023 RWP GEN RWTP-GB-H-RWP-PTT-GEN-WPL-TYP-000003 SH - RAW WATER PIPELINE : PIPE MARKING DETAIL H00 4/17/2023 SSP Hazwani - - 79 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block
13 5/8/2023 RWP GEN RWTP-GB-H-RWP-PTT-GEN-WPL-TYP-000004 SH - RAW WATER PIPELINE : PIPE DETAIL 2100MM H00 4/17/2023 SSP Hazwani - - 80 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block
14 5/8/2023 RWP GEN RWTP-GB-H-RWP-PTT-GEN-WPL-TYP-000005 SH - RAW WATER PIPELINE : HEMISPHERICAL JOINT DETAIL H00 4/17/2023 SSP Hazwani - - 81 Review Voided - - Review Voided Review Voided on 9/5/23 due missing SSP's name in the Title block

2 of 6
SHOP DRAWING TRACKING LIST
COLOR LEGEND PACKAGE (ACC BUILD - SUBMITTAL)
OPEN IN REVIEW (SSP) Booking/Reserved SH Ref. No for PIC Reference No Not In Use Overall Project OVPR
OVERDUE (SSP) Approved With Comments Pending Mr. Khor's signature (ACC Submittal "OPEN")
Rasau Pond Intake and Raw Water Pumping IWPS
Station
WITHDRAWAN REJECTED Approval Submission To AMS (in progress) Raw Water Pipeline RWP
SUPERSEDED REVIEW VOIDED Approval Submission To AMS Water Treatment Plant WTP

WORKFLOW - ACC Build Submittal (7 days) SSP RESPONSE (FINAL WORKFLOW) SUBMISSION TO AMS (FOR INFO ONLY)

3 of 6
Project Settings - Rasau Package 1
Document Attributes

PROJECT - ORIGINATOR - STAGE - LOCATION - SUB LOCATION - DISCIPLINE - COMPONENT - DRAWING SUBTYPE - SERIAL NO
RWTP - GB - H - - - - - - 000001

(3) Stage (6) Discipline (8) Drawing Type


Value Code Value Code Value Code
P - Preliminary P Administration ADM Alignment Control Plan ACP
T - Tender T Alignment ALN Beam Detail BMD
A - Approval A Architecture ARC Construction Sequence CSQ
W - Working W AIS Management Services Sdn Bhd AMS Cross Section CRS
X - As Built X Building Information Modeling BIM Elevation Plan ELP
H - Shop Drawing H Civil & Structure CNS General GEN
Civil Work CWS General Arrangement GAR
Combined Services Drawings CSD Geotechnical Details GEO
(4) Location Contract & Commercial CNC Ground Floor Plan GFP
Value Code Design & Technical DNT Key Plan KEP
Overall Project OVPR Electrical ELE Layout Plan LAP
Rasau Pond Intake and Raw Water Pumping IWPS Engineering Design Management EDM List of Drawings LOD
Station
Raw Water Pipeline RWP Environmental Control System ECS List of Standard Abbreviations LOS
Water Treatment Plant WTP Finance FIN Location Map / Route Map LRM
General GEN Longitudinal Section LOP
Geographic Information System GIS Piping & Instrumentation Diagram PID
(5) Sub Location (60 char) *Supplier Geotechnical GTP Plan & Profile PNP
Value Code * New High Voltage System HVS Process Flow Diagram PFD
11kV Main Switching Substation MSS Human Resource HRD Reinforcement Detail RED
Admin Building ADB Investor Marketing and Land Sales IML Roof Plan RFP
Aerator & PreOzone Chamber APO Jabatan Kerja Raya JKR Schedule SCD
All Pipe Technology APT Land & Approval Management LAM Schematic SCM
BAC Filter BAC Landscape LAN Single Line Diagram SLD
BAC Filter Control Building BCB Mechanical MEC Site Plan SIP
BAC Filter & Control Building BFC Mechanical & Electrical MNE Specification SPC
Boat House BHO Majlis Perbandaran Kuala Langat MPKL Specification Symbol SPS
Boon & Cheah BNC Planning and Risk Management PRM Standard Details STD
Chemical Building CBU Plumbing PLM Typical TYP
Chemical Mixing Chamber CMC Pond Augmentation PAU
Chlorine Building CLB Project IMS / Information Technology ITS
Clarifier Control Building CCB Project Management PMD
Clarifier LCP LCP Planning PLN
Clear Water Tank CWT Perbadanan Kemajuan Pertanian Selangor PKPS
Clear Water Tank Control Building CTC Liaison, PR & Stakeholder LPS
Community Hall COM Quality Assurance Quality Control QAQC
Compressor House CHO Quality, Safety & Health and Environmental QSHE
Consumer 132kV / 11kV Substation CSS Safety, Health & Environment SHE
Control room for P2 P2C Structural, Electrical and Mechanical Drawings SEM
Control room for P3 P3C Structure STR
Control room for P5 P5C Survey Works SUW
Control room for P7 P7C Systems SYS
Concrete Batching Plant CBP Temporary Works TEM
Emergency Lagoon ELG Traffic Management TFM
Filter and Filter Gallery FFG Utilities UTI
General GEN
Guard House GHO
Intermediate Ozone Chamber IOC (7) Component
Interchlorine Injector Room INC Value Code
Lamella Clarifier LCL Aeration Systems AES
Lime and Fluoride Building LFB Air Conditioning & Mechanical Ventilation ACM
Mini Surau MNS Balustrade BLS
Ozone Building OZB Bridge BRD
Oriental Steel Pipe OSP Building BLD
One Ocean OOE Building Management System BMS
PAC & SAS Dosing House PSD Building Services BUS
Post-Chlorine Injector POC Cathodic Protection System CPS
PreOzone Injector Pump Hse & Pneumatic Air
PPH Ceiling Finishes CEF
Compressor Hse
Pumping Station PPS Celcom CEL
Primary Filter & Control Building PFC Center Line of Alignment CLA
Pau Tatt Water Pipe PTT Cold Water Plumbing Services CWP
Recycle Tank RET Culvert CUL
Recycle Tank Control Building RTC Cofferdam CFF
Refuse Chamber RFC Destratification System DES
Residual Holding and Thickening Tank RHT Digi DIG
Staff Quarters SQU Door & Window DNW
Store STO Down Main DOM
Surge Vessel SUV Drainage Dewatering & Sewage Services DDS
Thickened Residual Strg Tank,Dwatering
TRS Drainage Works DGW
Bldg&Residual Strg Yd
TNB Single Chamber / Double Chamber SSU Earth Works EAW
Tech Master TME Extra Low Voltage ELV
Washwater Recovery Tank WRT Fencing FEN
Workshop WKS Fire Protection Services FPS
Floor Finishes FLF
Foundation Detail FOD
Furniture FUR
Foundation & Support FNS
Gas Malaysia GAM
General GEN
Ground Improvement GRI
Grouting Works GRW
High Voltage (132kV) HOV
Infrastructure INF
Instrumentation INS
ITIS ITIS
Laboratory LAB
Landfill LAF
Lift & Escalator Services LES
Lifting Equipment LIE
Lighting Protection System & Earthing LPS
Low Voltage (400V) LOV
Master MAS
Maxis MXS
Medium Voltage (33kV) MOV
Metal Hoarding MTH
Miscellaneous MSC
Petronas Gas Berhad PGB
Piling Works PIL
Plant & Pump Room PPR
Process Works PRW
Protection Works PTW
Raw Water Pipeline RWP
Retaining Wall REW
Retention System RES
Road Work ROD
Sanitary Plumbing Service SNP
SCADA SCA
Setting Out SEO
Sewerage Services SWS
Sewerage Work SEW
Site Context SIC
Soil Investigation SOI
Street Lighting STL
Syabas Water SYW
Tank TAN
Telekom TMB
Telephone TEL
Tenaga Nasional Berhad TNB
Toilet & Surau TNS
Traffic Control TRC
Underpinning Works UPW
Up Main UPM
Wall Finishes WAF
Water Supply WSU
* Water Pipe WPL
Weighbridge WBG
WTP Work Scope

No. Description Remarks

WTP RC Package 1 (Code: W1)

Clear Water Tank


Post Chlorine Injector Room
Clear Water Tank Control Building
BAC Filter Control Building
BAC Filter
Intermediate Ozone Chamber
Washwater Recovery Tank
Filter Control Building
Filter & Filter Gallery
Lime/ Fluoride Building
Chlorine Building
Walk Through Duct & Service Trench
11kV Main Switching Station
Consumer 132/11kV Substation

WTP RC Package 2 (Code: W2)

Clarifier Control Building


Chemical Mixing Chamber
Clarifier
Pre-Chlorine Injector Room
Clarifier LCP
Ozone Building
Chemical Building Incl. Hydrogen Peroxide Building
Workshop Building
Store & Weighbridge
Aerator/ Pre Ozone Tank
Pre Ozone Injector Pump House
Pneumatic Air Compressor House
Gravity Residual Thickening Tank
Residual Holding & Thickening Plant
Recycle Tank
Recycle Tank Control Building
Thickened Residual Storage Tanks
Dewatering Plant Building 1 building
Residual Storage Yard
Elevated Walkway

WTP RC Package 3 (Code: W3)

Administration Building
Covered Car Park
Guardhouse & Main Entrance
STP
Mini Surau
Community Hall
Refuse Chamber
Staff Quarters Type D
Staff Quarters Type E
Staff Quarters Type F
Staff Quarters Type G

WTP External Work Package 1 (Code: E1)

Interconnecting Pipeworks
Residual Pipeworks
Water Supply
Overflow Pipework & Drainage System
Sewerage
Emergency Lagoon
Internal Access Road
Drainage
Fencing & Landscape
Dewatered Residual Disposal Facilities (Landfill)

WTP External Access Road (Code: E2)


External Access Road to WTP
Utilities Relocation

Others:
Earthworks
Ground Treatment