BOTTOM DIMENSION

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-001 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 4/1/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-003

Point Result
Plate No.
A B C D E F Acc. / Un Acc.

1 1524 1524 4657 4657 4900 4900 Acc.


2-1 1524 1198 1718 Acc.
2-2 1524 1198 1718 Acc.
2-3 1524 1198 1718 Acc.
2-4 1524 1198 1718 Acc.
3-1 1221 859 Acc.
3-2 1221 859 Acc.
3-3 1221 859 Acc.
3-4 1221 859 Acc.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
SHELL DIMENSION

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-002 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 4/1/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-002

C=6096 C=2589
A=610

A=610
B=610

B=610
D=6096 D=2589

C=6096 C=2589

A=1526
A=1526

B=1526

B=1526
D=6096 D=2589

Point Result
Plate No.
A B C D E F Acc. / Un Acc.

1-1 1526 1526 6096 6096 6284 6284 Acc.

1-2 1526 1526 6096 6096 6284 6284 Acc.

1-3 1526 1526 6096 6096 6284 6284 Acc.

1-4 1526 1526 6096 6096 6284 6284 Acc.

1-5 1526 1526 6096 6096 6284 6284 Acc.

1-6 1526 1526 6096 6096 6284 6284 Acc.

2-1 1526 1526 2589 2589 3005 3005 Acc.

2-2 1526 1526 2589 2589 3005 3005 Acc.

2-3 1526 1526 2589 2589 3005 3005 Acc.

3-1 610 610 6096 6096 6126 6126 Acc.

3-2 610 610 6096 6096 6126 6126 Acc.

4 610 610 2589 2589 2660 2660 Acc.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
G.
ness
B=1526 B=610
ROOF DIMENSION

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-003 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 4/1/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-004

Point Result
Plate No.
A B C D Acc. / Un Acc.

1-1 1524 1524 3680 4759 Acc.


1-2 1524 1524 3680 4759 Acc.
2-1 1524 1524 775 775 Acc.
2-2 1524 1524 775 775 Acc.
3-1 1132 785 Acc.
3-2 1132 785 Acc.
3-3 1132 785 Acc.
3-4 1132 785 Acc.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
FOUNDATION INSPECTION

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-004 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 4/4/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-D03

* Slope check
Point 1 2 3 Result
Degree
Dwg. 20.4 10.2 1.2 Acc./Un Acc.

0O 20.4 10 1 Acc.

45O 20.4 11 0 Acc.

90O 20.4 9 0 Acc.


ACTUAL

135O 20.4 9 0 Acc.

180O 20.4 10 1 Acc.

225O 20.4 9 0 Acc.

270O 20.4 9 2 Acc.

315O 20.4 10 2 Acc.

* Where a sloping foundation is specified, the actual elevation difference shall not deviate form the calculated

difference and ± 1/4 inch ) ± 6.0mm) in the total circumference.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.


Date
ness

G.
RADIUS CHECK REPORT OF BOTTOM

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-005 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 4/1/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

BOTTOM PLATE

Bottom Dia. (mm) : 4900

Actual Radius (R) Judgment


Check Point Difference (mm) Remarks
(mm) (Acc / Un Acc)

0°-180° 4902 +2 Acc.

45°-225° 4902 +2 Acc.

90°-270° 4903 +3 Acc.

135°-315° 4903 +3 Acc.

* NOTE : 1) Radius of bottom shall be measured at the middle of each shell after weld.
2) Tolerance of radius : -0 mm to +20 mm than specified radius ( mm)

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
RADIUS CHECK REPORT OF ROOF

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-006 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 4/1/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

ROOF PLATE

Roof Dia. (mm) : 4759

Actual Radius (R) Judgment


Check Point Difference (mm) Remarks
(mm) (Acc / Un Acc)

0°-180° 4760 +1 Acc.

45°-225° 4762 +3 Acc.

90°-270° 4761 +2 Acc.

135°-315° 4761 +2 Acc.

* NOTE : 1) Radius of roof shall be measured at the middle of each shell after weld.
2) Tolerance of radius : -0 mm to +20 mm than specified radius ( mm)

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
LEVEL CHECK REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-007 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/29/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

6
4

5188
610
5t

4578
1526
5t
5200

3048
1526
5t

1
1526
1526
5t
6t

Degree
Dwg. Result
Point No. 0° 90° 180° 270°
(mm.) Actual Diff. Actual Diff. Actual Diff. Actual Diff. Acc./Un Acc.
1 1526 1525 -1 1526 0 1526 0 1527 +1 Acc.
2 3052 3051 -1 3053 +1 3052 0 3053 +1 Acc.
3 4578 4579 +1 4579 +1 4576 -2 4578 0 Acc.
4 5188 5188 0 5189 +1 5189 +1 5190 +2 Acc.

* Note 1) After setting a measuring equipment on the center of bottom, shell plate levelness shell be measured
at every check point.
2) a. the top of the first shell course shall be within +- 3 mm in any 9 meter of the circumference and
+- 6 mm in the total circumferential length for concrete ring wall.
b. The top of the first shell course shall be within +- 3 mm in any of the circumference and +- 13 mm
in the total circumference.
Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
ANCHOR CHAIR INSPECTION REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-008 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/29/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

0?
22.5 ?
337.5 ?

WB3-1 8-? 40 HOLES

WB2-1

WB3-2
292.5 ? 67.5 ?

WB1-1

270 ? 90 ?

WB1-2

112.5 ?
WB3-3

WB3-4
WB2-2

247.5 ?

202.5 ? 157.5 ?

180 ?

BOTTOM PLATE

Actual Difference Result


Point / Degree
(mm.) (mm.) (Acc. / Un Acc.)

22.5°-67.5° 1845 0 Acc.

67.5°-112.5° 1846 +1 Acc.

112.5°-157.5° 1845 0 Acc.


(A) = 1845 mm.

157.5°-202.5° 1844 -1 Acc.

202.5°-247.5° 4845 0 Acc.

247.5°-292.5° 1845 0 Acc.

292.5°-337.5° 1856 +1 Acc.

337.5°-22.5° 1846 +1 Acc.

22.5°-202.5° 4820 0 Acc.


(B) = 4820 mm.

67.5°-247.5° 4820 0 Acc.

112.5°-292.5° 4820 0 Acc.

157.5°-337.5° 4820 0 Acc.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
PLUMBNESS INSPECTION REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-009 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/26/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

1st = 1526 mm.


2nd = 3052 mm.
3rd = 4578 mm.
4th = 5188 mm.

Measured Orientation Difference Tolerance


Shell
Point 0° 45° 90° 135° 180° 225° 270° 315° Average (mm.)
1 100 100 100 100 100 100 100 100 0
4 th 26
2 100 98 100 100 100 98 99 99 99.25
3 101 95 100 99 98 98 99 99 98.63
3 rd 23
4 110 102 99 90 98 100 95 110 100.5
5 110 102 99 90 98 100 95 110 100.5
2nd 16
6 110 95 99 90 98 100 97 110 99.88
7 110 95 92 98 103 100 102 103 100.38
1st 8
8 106 94 96 95 100 99 105 105 100

* note : 1) Inspection method : plumb bob method

2) Tolerance for out - of - plumb : 1/200 of height


3) + shows leaning to outside.

4) - shows leaning to inside.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.

Date
Tolerance
(mm.)

26

23

16

ness

G.
TANK APPURTENANT REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-010 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/29/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

6
610
5t
1526
5t
5200

5200
1526
5t
1526
5t
6t

Degree
Dwg. Result
Point No. 0° 90° 180° 270°
(mm.) Actual Diff. Actual Diff. Actual Diff. Actual Diff. Acc./Un Acc.
1 5200 5198 -2 5201 +1 5202 +2 5202 +2 Acc.

* Note 1) After setting a measuring equipment on the center of bottom, shell plate levelness shell be measured
at every check point.
2) a. the top of the first shell course shall be within +- 3 mm in any 9 meter of the circumference and
+- 6 mm in the total circumferential length for concrete ring wall.
b. The top of the first shell course shall be within +- 3 mm in any of the circumference and +- 13 mm
in the total circumference.
Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
ROUNDNESS INSPECTION REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-011 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/26/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

Allowable : See * Note (2)


I.D. of Dwg. : 4700 mm.
ACTUAL INNER DIAMETER
POINT No. DWG. DIFERENCE REMARK
TOP BOTTOM
0O-180O 4700 4701 4702 +3
45 -225
O O
4700 4697 4696 - 3.5
4th
90 -270
O O
4700 4707 4705 +6
135O-315O 4700 4694 4697 - 4.5
0O-180O 4700 4705 4707 +6
45 -225
O O
4700 4693 4695 -6
3rd
90 -270
O O
4700 4696 4697 - 3.5
135O-315O 4700 4705 4706 + 5.5
0O-180O 4700 4705 4704 4.5
45 -225
O O
4700 4693 4695 -6
2nd
90O-270O 4700 4699 4701 0
135O-315O 4700 4702 4704 +3
0 -180
O O
4700 4693 4694 - 6.5
45 -225
O O
4700 4703 4705 +4
1st
90O-270O 4700 4695 4696 - 4.5
135O-315O 4700 4697 4697 -3

* Note : 1) Measurement shall be made after vertical


and comer joints are completely welded.
2) Roundness tolerances shall be :
Tank Diameter (m) Radius Tolerance (mm)
< 12 ± 13.0
12 to < 45 ± 15.0
45 to < 75 ± 20.0
≥ 75 ± 25.0
3) The measurement point is at the middle on the shell plate from 0° clock wise.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
ness

G.
CIRCUMFERENCE INSPECTION REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-012 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/28/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

6
610
5t
4

1526 3
5t
5200

1526

2
5t
1526

1
5t

Inside Diameter ( ID ) : 4700


6t

External Circumference ( C ) : 14796.9


Greatest permisible deviation from nominal Inside Diameter ( ID ) : 4700
D.MAX-D.MIN ≤ 1% ID ( 4700 )
ACTUAL CIRCUMFERENCE (X)
POINT No. DWG. DIFERENCE REMARK
TOP BOTTOM
1 14797 14800 14794 ±6
2 14797 14796 14795 ±1
3 14797 14800 14797 ±3
4 14797 14794 14796 ±2

* Note : 1) Measurement shall be made after vertical


and comer joints are completely welded.
2) Roundness tolerances shall be :
Tank Diameter (m) Radius Tolerance (mm)
< 12 ± 10.0
12 to < 45 ± 15.0
45 to < 75 ± 20.0
≥ 75 ± 25.0
3) The measurement point is at the middle on the shell plate from 0° clock wise.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC ENGINEERING) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
AGE 1 of 1

ness
G.
PEAKING & BANDING INSPECTION REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-013 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 4/8/2015 JOB No. : PL-5809
TANK No : DRAWING No : TK3200-PLP-TK3200-002

A A A
A A A
5 6 7 36"
1 2 3
V1 V1
36" V2 Plate No. B H1 H2 H3 H1 H2 H3
V2 Plate No.1
2 1
V3
V3
Plate No. Plate No.
1 2

Check points (inside view)

Banding Peaking

Position After W/D Result Position After W/D Result

Joint 1 2 3 1 2 3 Joint 1 2 3 1 2 3
V1A +2 +2 +1 Acc. Acc. Acc. H1A -2 -2 Acc. Acc.
V1B +1 +2 +2 Acc. Acc. Acc. H1B +2 +3 +3 Acc. Acc. Acc.
V1C +2 +1 +2 Acc. Acc. Acc. H1C -2 +2 +3 Acc. Acc. Acc.
V2A -2 -3 -1 Acc. Acc. Acc. H2A +2 +3 +2 Acc. Acc. Acc.
V2B +2 +1 +1 Acc. Acc. Acc. H2B -2 +2 +3 Acc. Acc. Acc.
V2C -1 -1 +2 Acc. Acc. Acc. H2C +1 -2 -1 Acc. Acc. Acc.
V3A +3 +2 -1 Acc. Acc. Acc. H3A -1 -2 -6 Acc. Acc. Acc.
V3B -1 +2 +2 Acc. Acc. Acc. H3B -3.5 -5 -5 Acc. Acc. Acc.
V3C +2 -1 -2 Acc. Acc. Acc. H3C -5 0 Acc. Acc.
V4A 0 +3 Acc. Acc.
V4B +3 +1 Acc. Acc.
V4C +1 +1.5 Acc. Acc.

* Note : 1) Measurement shall be made after vertical welded joints are completed
2) Tolerance for peaking shall not exceed ± 13.0 mm.
3) Peaking, check each vertical welded joints
and report as accepted per ring.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.


Date
L-5809

Acc.
Acc.
Acc.
Acc.
Acc.
Acc.
Acc.

ness

G.
MANHOLE & NOZZLE ORIENTATION

APPURTENANT
CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-014 PAGE 1 of 2
PROJECT : TK-3200 Replacement DATE : 5/30/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

Mark Of Elevation Orienatation Projection or Align. Of face


Rate
nozzle & Size (A) (B) Height ( C ) (D)
manhole (#) DWG. Actual DWG. Actual DWG. Actual DWG. Actual
1 24" API650 1500 1498 92° 92° 170.3 170 0° 0.5°
2 24" API650 500 500 0° 0° 195 194 0° 0.5°
3 8" #150 1500 1501 0° 0° 160 158 0° 0.5°
5 2" #150 Center Center Center Center 167 165 0° 0.5°
11 8" #150 260 260 90° 90° 210 211 0° 0.5°
18 4" #150 520 521 180° 180° 180 178 0° 0.5°
19 3" #150 200 200 75° 75° 180 179 0° 0.5°
22 2" #150 150 150 105° 105° 160 160 0° 0.5°
31 2" #150 200 199 82.5° 82.5° 160 159 0° 0.5°
35 2" #150 200 199 195° 195° 160 158 0° 0.5°
40 1-1/2" #150 200 201 165° 165° 165 163 0° 0.5°
46A 3" #150 4300 4301 135° 135° 180 178 0° 0.5°

* Note : 1. All flange bolt holes shall be straddled the principal center line of tank ( 0° to 180° & 90° to 270° )

2. Dimension Tolerance ; Nozzle Manhole

Orientation (B) ±10 ±25


Projection or height ( C ) ±4 ±15
Elevation (A / F) ±10 ±25
Alignment of face (D) 1/2° 1°

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

Date
MANHOLE & NOZZLE ORIENTATION

APPURTENANT
CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-014 PAGE 2 of 2
PROJECT : TK-3200 Replacement DATE : 5/30/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

Mark Of Elevation Orienatation Projection or Align. Of face


Rate
nozzle & Size (A) (B) Height ( C ) (D)
manhole (#) DWG. Actual DWG. Actual DWG. Actual DWG. Actual

46B 3" #150 500 501 135° 135° 180 178 0° 0.5°
46C 3" #150 4300 4302 150° 150° 180 178 0° 0.5°
46D 3" #150 500 499 150° 150° 180 178 0° 0.5°
45A 1-1/2" #150 2000 2000 60° 60° 271.6 270 0° 0.5°
45B 1-1/2" #150 2000 2000 220 220 272.3 271 0° 0.5°
45C 1-1/2" #150 2000 2000 220 220 272.3 271 0° 0.5°
50 2" #150 1500 1498 270° 270° 160 158 0° 0.5°
51 1-1/2" #150 1500 1502 240° 240° 161 158 0° 0.5°

* Note : 1. All flange bolt holes shall be straddled the principal center line of tank ( 0° to 180° & 90° to 270° )

2. Dimension Tolerance ; Nozzle Manhole

Orientation (B) ±10 ±25


Projection or height ( C ) ±4 ±15
Elevation (A / F) ±10 ±25
Alignment of face (D) 1/2° 1°

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

Date
AGE 2 of 2

ness

G.
AIR LEAK TEST REPORT FOR REINFORCING PAD

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-015 PAGE 1 of 2
PROJECT : TK-3200 Replacement DATE : 5/7/2015 JOB No. : PL-5809
TANK No : DRAWING No : TK3200-PLP-TK3200-001
DESIGN DATA TESTING DATA
APPLICATION CODE : API 650 TESTING MEDIUM : TEMP. : 35 C
o

DESIGN PRESSURE : API 650 ACTUAL TEST PRESSURE : 1.5 Kg/cm2

TEST PRESSURE : 1.05 Kg/cm2 DURATION OF TEST : 10 sec.

Nozzle No. Nozzle size Result

1 24" Acc.

2 24" Acc.

3 8" Acc.

5 2" Acc.

11 8" Acc.

18 4" Acc.

19 3" Acc.

22 2" Acc.

31 2" Acc.

35 2" Acc.

46A 3" Acc.

46B 3" Acc.

46C 3" Acc.

46D 3" Acc.

50 2" Acc.

Leak test of Reinforecing pad was Carried out no Three Weld Surface (1, 2, 3) and one inside (4) of each Nozzle

Listed above by Air.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.


Date
AIR LEAK TEST REPORT FOR REINFORCING PAD

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-015 PAGE 2 of 2
PROJECT : TK-3200 Replacement DATE : 5/7/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001
DESIGN DATA TESTING DATA
APPLICATION CODE : API 650 - TESTING MEDIUM : TEMP. : 35

- DESIGN PRESSURE : API 650 - ACTUAL TEST PRESSURE : 1.5 Kg/cm2

- TEST PRESSURE : 1.05 Kg/cm2 - DURATION OF TEST : 10 sec.

Leak test of Reinforecing pad was Carried out no Three Weld Surface (1, 2, 3) and one inside (4) of each Nozzle

Listed above by Air.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.


Date
C
o

ness

G.
VACUUM TEST REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-016 PAGE 1 of 2
PROJECT : TK-3200 Replacement DATE : 5/7/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

CONDITION

- Testing Solution : Soap Suds Film

- Test Pressure : Min -400 mm./Hg Vacuum

- Vacuum box Size : 250x500 mm.

- Location : Fillet Weld Bottom Plate to Bottom Pate (WB1-1,WB1-2,WB2-1,WB2-2,WB3-1,WB3-2,WB3-3,WB3-4)

: Fillet Weld Bottom Plate to Shell Pate (CN1,CN2,CN3)


At Butt weld with backing of Bottom plate to Bottom plate

No. Joint No. Result Date No. Joint No. Result Date

1 WB1-1 Accept 4/7/2015

2 WB1-2 Accept 4/7/2015

3 WB2-1 Accept 4/7/2015

4 WB2-2 Accept 4/7/2015

5 WB3-1 Accept 4/7/2015

6 WB3-2 Accept 4/7/2015

7 WB3-3 Accept 4/7/2015

8 WB3-4 Accept 4/7/2015

********* END ********

1 CN1 Accept 5/11/2015

2 CN2 Accept 5/11/2015

3 CN3 Accept 5/11/2015

TEST RESULT PRESSURE GAUGE No. ATTACHMENT INCLUDED

O ACCEPTABLE 1: P0400 O YES

O UNACCEPTABLE 2: - O NO

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.


Date
AGE 1 of 2

DED

ness

G.
VACUUM TEST REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-016 PAGE 2 of 2
PROJECT : TK-3200 Replacement DATE : 5/7/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No :

CONDITION

- Testing Solution : Soap Suds Film

- Test Pressure : Min -400 mm./Hg Vacuum

- Vacuum box Size : mm.

- Location : Bottm Plate

Location of Examination

0?

8-? 40 HOLES
WB3-1

WB2-1

WB3-2

WB1-1

270? 90?

WB1-2
WB3-3

WB2-2

WB3-4

180?

BOTTOM PLATE

TEST RESULT PRESSURE GAUGE No. ATTACHMENT INCLUDED

O ACCEPTABLE 1: P0400 O YES

O UNACCEPTABLE 2: - O NO

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

Date
AGE 2 of 2

DED

ness

G.
HYDRO STATIC TEST REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-017 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

1. Water Filling Status

Filling Height Filling Date / Time

From To From To

1st Filling 0% 25%

2nd Filling 25% 50%

3rd Filling 50% 75%

4th Filling 75% 100%

2. Visual Inspection of Leakage

Shell :

Roof :

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

TK-QA-020
Date

TK-QA-020
AGE 1 of 1

ness

G.

TK-QA-020
TK-QA-020
PAINTING INSPECTION REPORT
HANDRAIL
CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-018 PAGE 1 of 2
PROJECT : TK-3200 Replacement DATE : 4/20/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

Surface Preparation : SSPC SP10 Abrasive Type :

Surface Appearance : ✘ Satisfactory Non-Satisfactory

Coat Layer Brand / Type D.F.T.(Microns)

Primer Coat EPICON ZINC HB-2 70

Intermediate Coat EPICON F-HS 80

Top coat UNY MARINE HS (YELLOW RAL 1021) 40

Temp. : TOTAL 190

Humidit:

Actual Check Check Location


Piece Mark No. 1 (µ) 2 (µ) 3 (µ) 4 (µ) 5 (µ) AVE. (µ) Remark
Primer Coat 80 82 81 84 75 +10.2
Intermediate Coat 165 167 164 167 164 +15.4
Top coat 200 204 205 207 202 +10.4

Comment

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.


TK-QA-023
Date

TK-QA-023
.(Microns)

70

80

40

190

emark

ness

G.

TK-QA-023
TK-QA-023
PAINTING INSPECTION REPORT
HANDRAIL
CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-018 PAGE 2 of 2
PROJECT : TK-3200 Replacement DATE : 4/20/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

Surface Preparation : SSPC SP10 Abrasive Type :

Surface Appearance : Satisfactory Non-Satisfactory

Coat Layer Brand / Type D.F.T.(Microns)

Primer Coat EPICON ZINC HB-2 70

Intermediate Coat EPICON F-HS 80

Top coat UNY MARINE HS (YELLOW RAL 1021) 40

Temp. : TOTAL 190

Humidit:

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.


TK-QA-023
Date

TK-QA-023
.(Microns)

70

80

40

190

ness

G.

TK-QA-023
TK-QA-023
FOUNDATION SETTLEMENT REPORT
Client : MKK Asia Col.,Ltd. JOB No. : PAGE 1 of 1
Project : K2W Project REPORT No :
Tank No. : D-D1072W Deionized Water Tank Drawing No. D-D1072W-001 Rev.4 Date :

Settlement Before Water 25% Full 50% Full 75% 100 % Holding Time After drain
Remarks
Point Filling (Empty) Level Date Level Date Level Date Level After 24 hrs. (Empty)
0o
45o
90o
135o
180o
225o
270o
315o

* Note : Tank Dia mm Elev. (FS)


Tank Height mm

Stay : mm. BS : mm
HI. : mm. EL.: N/A mm.
Elev. : mm. FS : 0 mm.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

TK-QA-022
Date

TK-QA-022
FOUNDATION SETTLEMENT REPORT

Client : JOB No. : PAGE 1 of 1


Project : REPORT No :
Tank No. : Drawing No. Date :

Settlement Before Water 25% Full 50% Full 75% 90 % Holding Time After drain
Remarks
Point Filling (Empty) Level Date Level Date Level Date Level After 24 hrs. (Empty)

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

* Note : Tank Dia mm Elev. (FS)


Tank Height mm

Stay : mm. BS : mm
HI. : mm. EL.: N/A mm.
Elev. : mm. FS : 0 mm.

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

Date

TK-QA-022
HYDROSTATIC TEST GRAPH
Client : MKK Asia Col.,Ltd. Job No. :

Project : K2W Project Dwg. No. :

Item No. : Date :

Height

100% (12.96m)

75% (9.72m)

50% (6.48m)

25% (3.24m)

Hr.

Note.

100% level at Over flow nozzle

Signature and Date Signature and Date Signature and Date


QC Engineer Inspector Owner
WELDING RECORD
CLIENT : Rayong Engineering and Plant Service Co.,ltd. Report No: TK 3200-PLP-TK 3200-WR-019 PAGE 1 of 7
PROJECT : TK-3200 Replacement Date : 4/2/2015 JOB No.5809
TANK No : TK-3200 Drawing No : TK3200-PLP-TK3200-D01

Joint Fit-Up Weld Inspection NDT


Welder No. Result Remark
No. Date Date Date PT Vac. R1 R2
WB1-1 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

WB1-2 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

WB2-1 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

WB2-2 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

WB3-1 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

WB3-2 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

WB3-3 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

WB3-4 PLW-025 4/1/2015 4/2/2015 4/3/2015 P

V1A PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015 P

V1B PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015 P

V1C PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015 P

V2A PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015 P

V2B PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015


V2C PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015
V3A PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015
V3B PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015 P

V3C PLW-042 , PLW-043 4/1/2015 4/2/2015 4/3/2015


V4A PLW-042 , PLW-043 4/2/2015 4/3/2015 4/4/2015
V4B PLW-042 , PLW-043 4/2/2015 4/3/2015 4/4/2015
V4C PLW-042 , PLW-043 4/2/2015 4/3/2015 4/4/2015
H1A PLW-042 , PLW-043 4/19/2015 4/20/2015 4/22/2015 P

H1B PLW-042 , PLW-043 4/19/2015 4/20/2015 4/22/2015


H1C PLW-042 , PLW-043 4/20/2015 4/21/2015 4/22/2015
H2A PLW-042 4/27/2015 4/28/2015 4/30/2015 P

H2B PLW-042 4/27/2015 4/28/2015 4/30/2015 P

H2C PLW-042 4/27/2015 4/28/2015 4/30/2015 P

H3A PLW-042 , PLW-043 4/19/2015 4/20/2015 4/22/2015


H3B PLW-042 , PLW-043 4/19/2015 4/20/2015 4/22/2015 P

H3C PLW-042 , PLW-043 4/19/2015 4/20/2015 4/22/2015


H4A PLW-043 4/21/2015 4/22/2015 4/23/2015
H4B PLW-043 4/21/2015 4/22/2015 4/23/2015

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC Engineering) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
WELDING RECORD
CLIENT : Rayong Engineering and Plant Service Co.,ltd. Report No: TK 3200-PLP-TK 3200-WR-019 PAGE 2 of 7
PROJECT : TK-3200 Replacement Date : 4/2/2015 JOB No.5809
TANK No : TK-3200 Drawing No : TK3200-PLP-TK3200-D01

Joint Fit-Up Weld Inspection NDT


Welder No. Result Remark
No. Date Date Date PT Vac. R1 R2
H4C PLW-043 4/21/2015 4/22/2015 4/23/2015
H5A PLW-043 4/21/2015 4/22/2015 4/23/2015
H5B PLW-043 4/21/2015 4/22/2015 4/23/2015
H5C PLW-043 4/21/2015 4/22/2015 4/23/2015
CN1 PLW-042 4/20/2015 4/21/2015 4/22/2015 P P

CN2 PLW-042 4/20/2015 4/21/2015 4/22/2015 P P

CN3 PLW-042 4/20/2015 4/21/2015 4/22/2015 P P

SP1 PLW-043 5/1/2015 5/2/2015 5/3/2015 P

SP2 PLW-043 5/1/2015 5/2/2015 5/3/2015 P

SP3 PLW-043 5/1/2015 5/2/2015 5/3/2015 P

SP4 PLW-043 5/2/2015 3/5/20155 5/4/2015 P

M1-1 PLW-043 5/1/2015 5/2/2015 5/3/2015


M1-2 PLW-043 5/1/2015 5/2/2015 5/3/2015
M1-3 PLW-043 5/1/2015 5/2/2015 5/3/2015 P

M1-4 PLW-043 5/1/2015 5/2/2015 5/3/2015 P

M2-1 PLW-042 5/1/2015 5/2/2015 5/3/2015 P

M2-2 PLW-042 5/1/2015 5/2/2015 5/3/2015


M2-3 PLW-042 5/1/2015 5/2/2015 5/3/2015 P

M2-4 PLW-042 5/1/2015 5/2/2015 5/3/2015 P

N3-1 PLW-043 4/22/2015 4/23/2015 4/24/2015


N3-2 PLW-043 4/22/2015 4/23/2015 4/24/2015
N3-3 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

N3-4 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

N5-1 PLW-043 4/22/2015 4/23/2015 4/24/2015


N5-2 PLW-043 4/22/2015 4/23/2015 4/24/2015
N5-3 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

N5-4 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

N11-1 PLW-043 4/22/2015 4/23/2015 4/24/2015


N11-2 PLW-043 4/22/2015 4/23/2015 4/24/2015
N11-3 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

N11-4 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC Engineering) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
WELDING RECORD
CLIENT : Rayong Engineering and Plant Service Co.,ltd. Report No: TK 3200-PLP-TK 3200-WR-019 PAGE 3 of 7
PROJECT : TK-3200 Replacement Date : 4/2/2015 JOB No.5809
TANK No : TK-3200 Drawing No : TK3200-PLP-TK3200-D01

Joint Fit-Up Weld Inspection NDT


Welder No. Result Remark
No. Date Date Date PT Vac. R1 R2
N11-5 PLW-043 4/22/2015 4/23/2015 4/24/2015
N11-6 PLW-043 4/22/2015 4/23/2015 4/24/2015
S11-1 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

S11-2 PLW-043 4/22/2015 4/23/2015 4/24/2015 P

N18-1 PLW-042 4/22/2015 4/23/2015 4/24/2015


N18-2 PLW-042 4/22/2015 4/23/2015 4/24/2015
N18-3 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N18-4 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N18-5 PLW-042 4/22/2015 4/23/2015 4/24/2015


N18-6 PLW-042 4/22/2015 4/23/2015 4/24/2015
N19-1 PLW-042 4/22/2015 4/23/2015 4/24/2015
N19-2 PLW-042 4/22/2015 4/23/2015 4/24/2015
N19-3 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N19-4 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N19-5 PLW-042 4/22/2015 4/23/2015 4/24/2015


N19-6 PLW-042 4/22/2015 4/23/2015 4/24/2015
S19-1 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

S19-2 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N22-1 PLW-042 4/22/2015 4/23/2015 4/24/2015


N22-2 PLW-042 4/22/2015 4/23/2015 4/24/2015
N22-3 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N22-4 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N22-5 PLW-042 4/22/2015 4/23/2015 4/24/2015


N22-6 PLW-042 4/22/2015 4/23/2015 4/24/2015
S22-1 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

S22-2 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N31-1 PLW-042 4/22/2015 4/23/2015 4/24/2015


N31-2 PLW-042 4/22/2015 4/23/2015 4/24/2015
N31-3 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N31-4 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

N31-5 PLW-042 4/22/2015 4/23/2015 4/24/2015

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC Engineering) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
WELDING RECORD
CLIENT : Rayong Engineering and Plant Service Co.,ltd. Report No: TK 3200-PLP-TK 3200-WR-019 PAGE 4 of 7
PROJECT : TK-3200 Replacement Date : 4/2/2015 JOB No.5809
TANK No : TK-3200 Drawing No : TK3200-PLP-TK3200-D01

Joint Fit-Up Weld Inspection NDT


Welder No. Result Remark
No. Date Date Date PT Vac. R1 R2
N31-6 PLW-042 4/22/2015 4/23/2015 4/24/2015
S31-1 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

S31-2 PLW-042 4/22/2015 4/23/2015 4/24/2015


S31-3 PLW-042 4/22/2015 4/23/2015 4/24/2015 P

S31-4 PLW-042 4/22/2015 4/23/2015 4/24/2015


N35-1 PLW-043 4/23/2015 4/24/2015 4/25/2015
N35-2 PLW-043 4/23/2015 4/24/2015 4/25/2015
N35-3 PLW-043 4/23/2015 4/24/2015 4/25/2015 P

N35-4 PLW-043 4/23/2015 4/24/2015 4/25/2015 P

N40-1 PLW-043 4/23/2015 4/24/2015 4/25/2015


N40-2 PLW-043 4/23/2015 4/24/2015 4/25/2015
N40-3 PLW-043 4/23/2015 4/24/2015 4/25/2015
N40-4 PLW-043 4/23/2015 4/24/2015 4/25/2015 P

N45A-1 PLW-043 4/23/2015 4/24/2015 4/25/2015


N45A-2 PLW-043 4/23/2015 4/24/2015 4/25/2015
N45A-3 PLW-043 4/23/2015 4/24/2015 4/25/2015
N45A-4 PLW-043 4/23/2015 4/24/2015 4/25/2015 P

N45B-1 PLW-043 4/23/2015 4/24/2015 4/25/2015


N45B-2 PLW-043 4/23/2015 4/24/2015 4/25/2015
N45B-3 PLW-043 4/23/2015 4/24/2015 4/25/2015
N45B-4 PLW-043 4/23/2015 4/24/2015 4/25/2015 P

N45C-1 PLW-043 4/23/2015 4/24/2015 4/25/2015


N45C-2 PLW-043 4/23/2015 4/24/2015 4/25/2015
N45C-3 PLW-043 4/23/2015 4/24/2015 4/25/2015
N45C-4 PLW-043 4/23/2015 4/24/2015 4/25/2015 P

N46A-1 PLW-042 4/23/2015 4/24/2015 4/25/2015


N46A-2 PLW-042 4/23/2015 4/24/2015 4/25/2015
N46A-3 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N46A-4 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N46B-1 PLW-042 4/23/2015 4/24/2015 4/25/2015


N46B-2 PLW-042 4/23/2015 4/24/2015 4/25/2015

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC Engineering) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
WELDING RECORD
CLIENT : Rayong Engineering and Plant Service Co.,ltd. Report No: TK 3200-PLP-TK 3200-WR-019 PAGE 5 of 7
PROJECT : TK-3200 Replacement Date : 4/2/2015 JOB No.5809
TANK No : TK-3200 Drawing No : TK3200-PLP-TK3200-D01

Joint Fit-Up Weld Inspection NDT


Welder No. Result Remark
No. Date Date Date PT Vac. R1 R2
N46B-3 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N46B-4 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N46C-1 PLW-042 4/23/2015 4/24/2015 4/25/2015


N46C-2 PLW-042 4/23/2015 4/24/2015 4/25/2015
N46C-3 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N46C-4 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N46D-1 PLW-042 4/23/2015 4/24/2015 4/25/2015


N46D-2 PLW-042 4/23/2015 4/24/2015 4/25/2015
N46D-3 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N46D-4 PLW-042 4/23/2015 4/24/2015 4/25/2015 P

N50-1 PLW-043 4/24/2015 4/25/2015 4/26/2015


N50-2 PLW-043 4/24/2015 4/25/2015 4/26/2015
N50-3 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

N50-4 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

N51-1 PLW-043 4/24/2015 4/25/2015 4/26/2015


N51-2 PLW-043 4/24/2015 4/25/2015 4/26/2015
N51-3 PLW-043 4/24/2015 4/25/2015 4/26/2015
N51-4 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

NP-1 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

NP-2 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

EL1-1 PLW-043 4/24/2015 4/25/2015 4/26/2015


EL1-2 PLW-043 4/24/2015 4/25/2015 4/26/2015
AC1 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC2 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC3 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC4 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC5 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC6 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC7 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC8 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

AC9 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC Engineering) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
WELDING RECORD
CLIENT : Rayong Engineering and Plant Service Co.,ltd. Report No: TK 3200-PLP-TK 3200-WR-019 PAGE 6 of 7
PROJECT : TK-3200 Replacement Date : 4/2/2015 JOB No.5809
TANK No : TK-3200 Drawing No : TK3200-PLP-TK3200-D01

Joint Fit-Up Weld Inspection NDT


Welder No. Result Remark
No. Date Date Date PT Vac. R1 R2
AC10 PLW-043 4/24/2015 4/25/2015 4/26/2015 P

LL1 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

LL2 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

LL3 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

LL4 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC1 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC2 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC3 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC4 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC5 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC6 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC7 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC8 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC9 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

SC10 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

BP1 PLW-042 5/11/2015 5/12/2015 5/12/2015 P

AV1-1 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

AV1-2 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

AV2 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

AV3 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

AV4 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

AV5 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

AV6-1 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

AV6-2 PLW-042 4/24/2015 4/25/2015 4/26/2015 P

LI1-1 PLW-042 5/4/2015 5/5/2015 5/6/2015 P

LI1-2 PLW-042 5/4/2015 5/5/2015 5/6/2015 P

LI1-3 PLW-042 5/4/2015 5/5/2015 5/6/2015 P

LI1-4 PLW-042 5/4/2015 5/5/2015 5/6/2015 P

BK-1 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

BK-2 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

BK-3 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC Engineering) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
WELDING RECORD
CLIENT : Rayong Engineering and Plant Service Co.,ltd. Report No: TK 3200-PLP-TK 3200-WR-019 PAGE 7 of 7
PROJECT : TK-3200 Replacement Date : 4/2/2015 JOB No.5809
TANK No : TK-3200 Drawing No : TK3200-PLP-TK3200-D01

Joint Fit-Up Weld Inspection NDT


Welder No. Result Remark
No. Date Date Date PT Vac. R1 R2
BK-4 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

SC-11 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

SC-12 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

SC-13 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

SC-14 PLW-043 5/4/2015 5/5/2015 5/6/2015 P

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness


Company PLP PLP (QC Engineering) Repco / S.C.G.
Signature
Name Mr.Piya W. Mr.Ramin Y.
Date
NOZZLE DIMENSION

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-020 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/30/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-001

L
Mark Of Projection or
Rate
nozzle & Size Height ( L )
manhole (#) DWG. Actual

1 24" API650 170.3 200


2 24" API650 195 210
3 8" #150 160 170
5 2" #150 167 180
11 8" #150 210 220
18 4" #150 180 190
19 3" #150 180 190
22 2" #150 160 170
31 2" #150 160 170
35 2" #150 160 170
40 1-1/2" #150 165 180
46A 3" #150 180 190
46B 3" #150 180 190
46C 3" #150 180 190
46D 3" #150 180 190
45A 1-1/2" #150 271.6 290
45B 1-1/2" #150 272.3 290
45C 1-1/2" #150 272.3 290

50 2" #150 160 170


51 1-1/2" #150 161 170

* Note : 1. All flange bolt holes shall be straddled the principal center line of tank ( 0° to 180° & 90° to 270° )

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

Date
TK-QA-012
ROOF HANDRAIL INSPECTION REPORT

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-021 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 5/30/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-0012
125?

HANDRAIL #1
525

35? 215?

305?
ROOF HANDRAIL

Dimension (mm.)
Post No.
A B1 B2 C
1 1430 530 499 1100
2 1430 531 500 1102
3 1431 532 500 1100
4 1428 532 500 1102
5 1430 531 501 1100
6 1430 530 500 1100
7 1430 530 500 1100
8 1431 529 502 1103

9 1427 530 501 1100


10 1430 530 501 1100

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

Date
TK-QA-012
NAME PLATE

CLIENT : Rayong Engineering and Plant Service Co.,ltd. REPORT No: TK 3200-PLP-TK 3200-IR-022 PAGE 1 of 1
PROJECT : TK-3200 Replacement DATE : 25/06/2015 JOB No. : PL-5809
TANK No : TK-3200 DRAWING No : TK3200-PLP-TK3200-0012

Completed By Peviewed By QC Reviewed / Approved Reviewed / Witness

Company PLP PLP (QC ENGINEERING) Repco / S.C.G.

Signature

Name Mr.Piya W. Mr.Ramin Y.

Date
TK-QA-012