Approval Biotech
PERSETUJUAN MATERIAL
Contraktor/Kontraktor : PT. KARABHA SAKTI
Project/Proyek : RELAYOUT OFFICE, MUSHOLLA & ADD TOILET CKD
No. :
Date/Tgl : 11 FEBRUARI 2021
1. Material Type
Jenis Material Biotech
2. Product by
Produksi dari PT Biotech International
3. Suplier
PT Biotech International
4. Sub Contraktor
Sub Kontraktor
5 Reference - Drawing No.
Referensi - No. Gambar
- Technical Spesification - Attached
- Spesifikasi Teknis - Terlampir V
- Others - Attached
- Lain - lain - Terlampir
6 Technical Spesification to be proposal
Spesifikasi teknis yang diajukan Biotech Kap 15 m³ (Type RCX-15)
telampir katalag
7 Location
Lokasi ADM - KAP Surya Cipta - Karawang Timur
8 Scope of Work Concrete Stair Wall Floor
Bagian Pekerjaan Celling Roofing Door/ Window Curtain Wall
Painting Partition Electrical CCTV
Pillng Sound System Telephone Fire Alarm
Lighting P BAS Genset V Plumbing
Sanitair Fire Fighting Lift/ Excavator Deep Well
Fence STP Signage Parking Landscape
Others
9 Evaluation Base Match/ Not Match with FOC drawing
Dasar Persetujuan Sesuai/ Tidak sesuai dengan gambar FOC
Match/ Not Match with Technical Spesification
Sesuai/ Tidak sesuai dengan Spesifikasi Teknis
Quality : Good/ Suffience/ Bad
Mutu : Baik/ Cukup/ Jelek
10 After Evaluated the samples, the material Accepted/ Diterima
Berdasarkan evaluasi contoh material tersebut Rejected/ Ditolak
11 Statement for the material Allowed to send to Project
Material tersebut dinyatakan Diijinkan dikirim ke proyek
Not Allowed/ Not Allowed yet to send Project
Tidak/ Belum diijinkan di kirim ke proyek
Have to be Tested for Quality/ Laboratory Test
Harus dilakukan test mutu/ laboratorium
Notes ( filed by Engineer )
Catatan ( disi oleh Manajemen Konstruksi )
IBNU RUS