BP 220 1.7M- 2.

5M

PD 957 Medium 2.-4M TO Open Market 4M

1. Theme
2. Cut is 80 sqm more than 10K per sqm
3. Remaining 2ha should be incorporate in the ongoing planning of phase 2
4. Cherista should have separate location
5. Incentivice socialized housing
6. Consideration of threshold (VAT)
7. Consideration of outfall (Engr. Graheda)
8. Start embankment @ phase 5 (1 week)
9. Loft type updated cost (1.8M target house and lot) (1 week)
10. Enclosed clubhouse
11.
12.