Professional Documents
Culture Documents
J. Schedule-J - PROPOSED SUBCONTRACTORS - MANUFACTURER
J. Schedule-J - PROPOSED SUBCONTRACTORS - MANUFACTURER
BIDDING DOCUMENT
PACKAGE 2: Design, Supply, Installation, Testing and Commissioning for RRA of 3 nos. 33/11kV
Substation and AIS breaker replacement with GIS breakers at different substations under DPDC
including civil work and related services on Turn-key Basis
SCHEDULE J
PROPOSED SUBCONTRACTORS/MANUFACTURER
The bidder shall propose a list of the Subcontractor/Manufacturer in the following table as per sub-clause 2.7,
Item 2, Civil Subcontractors, Section-3, Evaluation and Qualification Criteria, Volume 1 of 2 of the Bidding
Document.
Signature ----------------------------------
Date ----------------------------------
Bidding Document for Package 2 - Renovation, Reinforcement and Augmentation (RRA) of 3 nos. 33/11kV Substation and AIS breaker replacement
with GIS breakers at different substations under DPDC.
PDF processed with CutePDF evaluation edition www.CutePDF.com