Professional Documents
Culture Documents
Horizontal Omnibus
Horizontal Omnibus
MIXED-USE ESTATE
RESIDENTIAL
COMMERCIAL
Offices, retail, hotels, etc.
INSTITUTIONAL
Schools & hospitals
NUVALI’S
RESIDENTIAL
DEVELOPMENTS
No. of
Brand
Projects
Alveo 5
Avida 7
378 lots 270 lots 464 lots 451 lots 272 lots 462 lots 844 lots 623 lots
Sold out Sold out Sold out Sold out Sold out Sold out 93% sold
TOTAL AREA 70 ha 60 ha 79 ha 72 ha 50 ha 66 ha 85 ha 85 ha
% OPEN SPACE 50% 52% 54% 52% 54% 50% 47% 50%
NO. OF LOTS 378 lots 270 lots 454 lots 451 lots 272 lots 462 lots 844 lots 623 lots
DENSITY 5 5 6 6 5 7 10 7
LOT SIZE
RANGE
801 - 1,234 600 - 2,419 600 - 1,224 600 - 1,418 600 - 2,090 600 - 1,393 480 - 890 520 - 1,300
AVERAGE LOT
SIZE
925 1,064 795 770 865 716 531 681
AVIDA
ESTATES CARMELRAY
XAVIER INDUSTRIAL PARK
SCHOOL
AMAIA
STEPS
TREVEIA
AVIDA
SETTINGS
CANLUBANG
REPUBLIC
GOLF & ELARO WAKE PARK
COUNTRY
CLUB LUSCARA AVIDA
AVIDA
CAMP
N MONTECITO
VENARE AVIDA
SOLIENTO
MIRALA
CERILO LUMIRA
MIRIAM
COLLEGE
MONDIA
RIOMONTE
MAIN PARK
Artist’s Rendering
TO ELARO
total area
85 hectares
TO SOLIENTO
average lot size
680 sqm
number of lots
623 lots
CLUBHOUSE
MAIN
PARK
density
7 lots per hectare
RETAIL
(2 has)
TO MIRIAM COLLEGE
RIOMONTE
CERILO’S TRANCHES
TURNOVER DATES:
Tranche 1: Q3 2020
Tranche 2: Q4 2020
Tranche 3: Q1 2021
Tranche 4: Q2 2021
AMENITIES
Social hall
Residents’ lounge
Swimming pool
Multipurpose court
Indoor children’s play area
Indoor fitness area
Off-road bike trail
ROAD ELEVATION MAP
Tranche 4
LOT CLASS SUMMARY
Tranche 4
Calamba Exit
National University - Laguna
Mt. Makiling
L O C AT I O N M A P
Laguna de Bay
Mt. Makiling
•
•
Luxurious
Living
Amidst the
G ra n d n e s s o f •
Nature
•
•
Niog Station
Updates
2
5
4
3
2
3
4
Q4 2020
5
2
2
2
2
1B
1B
3A
3A
1A
1A
1B
1B
1B
1B
To Jose Abad Santos Road
Phase 3B
45 – 50 meters AMSL
50 – 55 meters AMSL
56 – 60 meters AMSL
61 – 65 meters AMSL
66 – 70 meters AMSL
71 – 75 meters AMSL
76 – 80 meters AMSL
81 – 85 meters AMSL
Phase Summary
Location Imus, Cavite
8 Activity nodes with combinations of various activities per node type are laid
around the main green loop.
Parklane Lots along the main road, facing the Greenway 10 680 - 770 sqm
Courtyard Park Courtyard lots connected to the Greenway 5 570 - 755 sqm
Courtyard Park Premier Courtyard Park directly adjacent to Greenway 5 672 - 865 sqm
43
Ayala Land Residences
Institutional (2%)
Others
Montala
Visitors center
Alviera Country Club
ALP
Recreation in harmony with Nature
First of its kind in Pampanga
Swimming pool
Clubhouse & Veranda
Basketball court
(Junior sized)
Social Hall
Estate Road
Avida
The information in this material is for internal consumption only and may only be used as reference for project
mastery. Said data is being cascaded as advanced information in preparation for the upcoming launch of the project.
This file must not be shared in any form with clients and other external parties.
The information in this material is for internal consumption only and may only
be used as reference for project mastery. Said data is being cascaded as
advanced information in preparation for the upcoming launch of the project.
This file must not be shared in any form with clients and other external parties.
The information in this material is for internal consumption only and may only be used as reference for project
mastery. Said data is being cascaded as advanced information in preparation for the upcoming launch of the project.
This file must not be shared in any form with clients and other external parties.
The information in this material is for internal consumption only and may only be used as reference for project
mastery. Said data is being cascaded as advanced information in preparation for the upcoming launch of the project.
This file must not be shared in any form with clients and other external parties.
FUTURE DEVELOPMENT
MANGO GROVE
The information in this material is for internal consumption only and may only be used as reference for project mastery.
Said data is being cascaded as advanced information in preparation for the upcoming launch of the project. This file
must not be shared in any form with clients and other external parties.
The information in this material is for internal consumption only and may only be used as reference for project mastery.
Said data is being cascaded as advanced information in preparation for the upcoming launch of the project. This file
must not be shared in any form with clients and other external parties.