Inspection & Test Plan For Cmu Work

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

Document Submittal Form

Document 14-281000-1100003536-ABF-
Contractor AQUA BRIDGE FARMS COMPANY CIV-ITP-100002
submittal no.
Contract no. 1100003536 Date May 2, 2023

To PMC AECOM

Document no. Type Description Rev no. Action required


14-281000- Approval Comments
1100003536- Inspection & Test 1100003536-000-INSPECTION &
ABF-CIV-ITP- TEST PLAN for CMU WORKS 00
Plan Information Other
100002

Approval Comments
Information Other
Approval Comments
Information Other

Contractor authorized signatory


Name Date

Signature

PMC’s comments

Exception as noted revise


No exception taken Revise and resubmit
Status code and resubmit for record
Rejected Review not required Issued for Construction

Engineer’s name Date

Signature

Received by Contractor
Name Date

Signature
In sp e ct io n & t es t P l a n

1100003536-000- I N S P E C T I O N & T E S T P L A N f o r C M U
W O RK S

“1 4 –2 8 1 0 0 0 –1 1 0 0 0 0 3 5 3 6 –A B F –C I V –I T P –1 0 0 0 0 2 ” “ R e v . 0 0 ” “M A Y 0 2, 2 0 2 3 ”

14-281000-1100003536-ABF-CIV-ITP-100002 Rev. 00 Page 2 of 13


Document history

Revision code Description of changes Purpose of issue Date

00 First Issue For Approval May 2,2023

Document approval

Prepared by Reviewed by Approved by


Name For Syed Munir

Job Title
14-281000-1100003536-ABF-CIV-ITP-100002 Rev. 00 Page 3 of 13
ITP No. 14-281000-1100003536-
Contract No. 1100003536 INSPECTION & TEST PLAN FOR CMU WORKS ABF-CIV-ITP-100002
Aquaculture Hatchery DBO Revision: 00
Page No. 1 of 2

UNIT/ AREA / LOCATION DISCIPLINE EQUIPMENT DESCRIPTION / TAG NUMBER


Applicable for whole Project CIVIL

Inspection Assignment Report


Inspection / Test Requirements Reference Document(s) Responsibility Inspection
Activity
#
Activity Description Others Request Hold
Test or Inspection Stage/ Contr. NEOM NEOM (3rd
Code, Spec, Etc Acceptance Criteria QC
Point Release
Performed Frequency PMC ETSD Party)
Reference #

NEOM Spec. S18127-


Approved Material
Review of Prior to Material 0100D –PK1-TDR-SPC- Material Technical
1. Material Submittal Approval Submittal R R R
Documents delivery TR-01-REV0 Section Submittal
092400, 1.4 & 042000
2. Material Receiving & Storage at Site
NEOM Spec. S18127-
0100D –PK1-TDR-SPC- MIR, Approved
Approved Natural Sand, NEOM Spec. S18127-
TR-01-REV0 Section Material Submittal,
Portland Cement, CMU & 0100D –PK1-TDR-SPC-
2.1 Visual Inspection Every Delivery 042000 & 092400, 1.6, H W W Delivery Note,
Plastering Accessories TR-01-REV0 Section
Proper Storage as per Inspection
042000- 1.6
manufacturer Checklist-074
recommendation
3. Application/ Work Execution
NEOM Spec. S18127-
0100D –PK1-TDR-SPC-
NEOM Spec. S18127- TR-01-REV0 Section
0100D –PK1-TDR-SPC- 042000, 3.1, Approved WIR, Inspection
3.1 Pre installation of CMU Visual Inspection Before Installation H H H
TR-01-REV0 Section Shop drawing 01- checklist- 1005
042000, 3.1 660000-0000100201-
MAH-STR-SHD-
531002, 003,005_02
NEOM Spec. S18127- NEOM Spec. S18127-
Installation of Masonry Unit Visual Inspection, 0100D –PK1-TDR-SPC- 0100D –PK1-TDR-SPC- WIR, Inspection
3.2 After Completion H W W
CMU Plumbness check TR-01-REV0 Section TR-01-REV0 Section checklist-1005
042000, 3.3, 3.4 & 3.5 042000, 3.3, 3.4 & 3.5
NEOM Spec. S18127-
NEOM Spec. S18127-
0100D –PK1-TDR-SPC-
Surface Preparation of Masonry Before Plastering 0100D –PK1-TDR-SPC- WIR, Inspection
3.3 Visual Inspection TR-01-REV0 Section H H H
Walls & Concrete Application TR-01-REV0 Section checklist-1007
092400, Part 3, 3.1,
092400, Part 3, 3.1, 3.2.
3.2.
ITP No. 14-281000-1100003536-
Contract No. 1100003536 INSPECTION & TEST PLAN FOR CMU WORKS ABF-CIV-ITP-100002
Aquaculture Hatchery DBO Revision: 00
Page No. 2 of 2

UNIT/ AREA / LOCATION DISCIPLINE EQUIPMENT DESCRIPTION / TAG NUMBER


Applicable for whole Project CIVIL

Inspection Assignment Report


Inspection / Test Requirements Reference Document(s) Responsibility Inspection
Activity
Activity Description Others Request Hold
# Test or Inspection Stage/ Contr. NEOM NEOM (3rd
Code, Spec, Etc Acceptance Criteria QC
Point Release
Performed Frequency PMC ETSD Party)
Reference #

NEOM Spec. S18127- NEOM Spec. S18127-


Visual Inspection, 0100D –PK1-TDR-SPC- 0100D –PK1-TDR-SPC- WIR, Inspection
3.4 Plastering Work After Completion H W W
Plumbness check TR-01-REV0 Section TR-01-REV0 Section checklist-1008
092400, Part 3, 3.6 092400, Part 3, 3.6
NEOM Spec. S18127- NEOM Spec. S18127-
0100D –PK1-TDR-SPC- 0100D –PK1-TDR-SPC- WIR, Inspection
3.5 Curing Visual Inspection Random W W W
ST-01-REV0, Section ST-01-REV0, Section checklist-1009
092400 092400
Legend: I – Visual Inspection; R – Document Review; T – Test; W - Witness Point; H - Hold Point.
AQUA BRIDGE Aquaculture Hatchery DBO - 1100003536 ITP No. 14-281000-
FARMS COMPANY Inspection Checklist for Delivery, Handling & Storage. 1100003536-ABT-CIV-
ITP-100002

UNIT/ AREA / LOCATION Checklist No: ABF-CIV-CL-1004 WIR No:


DISCIPLINE: Civil Rev: Date:
Applicable for whole Project

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Store materials inside under cover and keep them dry and protected NEOM Spec. S18127-0100D –
01 against damage from weather, direct sunlight, surface contamination, PK1-TDR-SPC-TR-01-REV0
corrosion, construction traffic, and other causes. Section 092400, Part 1, 1.6
Store masonry units on elevated platforms in a dry location. If units are
NEOM Spec. S18127-0100D –
not stored in an enclosed location, cover tops and sides of stacks with
02 PK1-TDR-SPC-TR-01-REV0
waterproof sheeting, securely tied. If units become wet, do not install
Section 042000, 1.9A
until they are dry.
Store cementitious materials on elevated platforms, under cover, and NEOM Spec. S18127-0100D –
03 in a dry location. Do not use cementitious materials that have become PK1-TDR-SPC-TR-01-REV0
damp. Section 042000, 1.9B
NEOM Spec. S18127-0100D –
Store aggregates where grading and other required characteristics can
04 PK1-TDR-SPC-TR-01-REV0
be maintained and contamination avoided.
Section 042000, 1.9C
Deliver preblended, dry mortar mix in moisture-resistant containers NEOM Spec. S18127-0100D –
designed for lifting and emptying into dispensing silo. Store PK1-TDR-SPC-TR-01-REV0
05 preblended, dry mortar mix in delivery containers on elevated Section 042000, 1.9D
platforms, under cover, and in a dry location or in a metal dispensing
silo with weatherproof cover.
NEOM Spec. S18127-0100D –
Store masonry accessories, including metal items, to prevent corrosion
06 PK1-TDR-SPC-TR-01-REV0
and accumulation of dirt and oil.
Section 042000, 1.9E
NEOM Spec. S18127-0100D –
Unit Compressive Strength for non-load bearing walls: Provide units
07 PK1-TDR-SPC-TR-01-REV0
with minimum average net-area compressive strength of 15.0 MPa.
Section 042000, 2.2B-1
NEOM Spec. S18127-0100D –
Load Bearing Unit Compressive Strength: Provide units with minimum
08 PK1-TDR-SPC-TR-01-REV0
average net-area compressive strength of 21.0 MPa.
Section 042000, 2.2B-2
NEOM Spec. S18127-0100D –
09 Portland Cement: ASTM C 150/ C150M, Type I. PK1-TDR-SPC-TR-01-REV0
Section 042000, 2.4A
REMARKS

ABFC Representative NEOM Representative


Construction Representative NEOM PMC
Name, initials & Date: Work ready for Work not ready for Inspection Name, initials Record reviewed Work Verified
Inspection & Date:

QC Inspector NEOM ETSD (Q &E)


Name, initials & Date: Performed Inspection Re work / Work may Proceed Name, initials Record reviewed Work Verified
& Date:
AQUA BRIDGE Aquaculture Hatchery DBO - 1100003536 ITP No. 14-281000-
FARMS COMPANY Pre Installation Checklist for CMU works 1100003536-ABT-CIV-
ITP-100002

UNIT/ AREA / LOCATION Checklist No: ABF-CIV-CL-1005 WIR No:


DISCIPLINE: Civil Rev: Date:
Applicable for whole Project

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Examine conditions, with Installer present, for compliance with NEOM Spec. S18127-0100D –
01 requirements for installation tolerances and other conditions affecting PK1-TDR-SPC-TR-01-REV0
performance of the Work. Section 042000, Part 3, 3.1A
Manufacturer
02 Blocks to be clean and free from oil or any loose materials.
recommendation
Blocks should be wet before the application of the adhesive especially in Manufacturer
03
hot and dry conditions. recommendation
Manufacturer
04 Ensure proper mixing of mortar
recommendation
SD01- 660000-0000100201-
05 Ensure and mark the layout area of CMU installation.
MAH-
STR-SHD- 531002, 003,005_02
REMARKS

ABFC Representative NEOM Representative


Construction Representative NEOM PMC
Name, initials & Date: Work ready for Work not ready for Inspection Name, initials Record reviewed Work Verified
Inspection & Date:

QC Inspector NEOM ETSD (Q &E)


Name, initials & Date: Performed Inspection Re work / Work may Proceed Name, initials Record reviewed Work Verified
& Date:
AQUA BRIDGE Aquaculture Hatchery DBO - 1100003536 ITP No. 14-281000-
FARMS COMPANY Inspection Checklist for CMU Installation 1100003536-ABF-CIV-
ITP-100002

UNIT/ AREA / LOCATION Checklist No: ABT-CIV-CL-1006 WIR No:


DISCIPLINE: Civil
Applicable for whole Project
Rev: Date:

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Thickness: Build composite walls and other masonry construction to full NEOM Spec. S18127-0100D –
01 thickness shown. Build single-wythe walls to actual widths of masonry PK1-TDR-SPC-TR-01-REV0
units, using units of widths indicated. Section 042000, 3.2A
Leave openings for equipment to be installed before completing NEOM Spec. S18127-0100D –
02 masonry. After installing equipment, complete masonry to match the PK1-TDR-SPC-TR-01-REV0
construction immediately adjacent to opening. Section 042000, 3.2C
Use full-size units without cutting if possible. If cutting is required to NEOM Spec. S18127-0100D –
provide a continuous pattern or to fit adjoining construction, cut units PK1-TDR-SPC-TR-01-REV0
03 with motor-driven saws; provide clean, sharp, unchipped edges. Allow Section 042000, 3.2D
units to dry before laying unless wetting of units is specified. Install cut
units with cut surfaces and, where possible, cut edges concealed.
Select and arrange units for exposed unit masonry to produce a uniform NEOM Spec. Section 042000,
04
blend of colors and textures. 3.2E
05 Mix units from several pallets or cubes as they are placed. NEOM Spec. Section 042000, 3.2F

Matching Existing Masonry: Match coursing, bonding, color, and texture NEOM Spec. Section 042000,
06
of existing masonry 3.2D
Lay out walls in advance for accurate spacing of surface bond patterns
with uniform joint thicknesses and for accurate location of openings, NEOM Spec. S18127-0100D –
07 movement-type joints, returns, and offsets. Avoid using less-than-half- PK1-TDR-SPC-TR-01-REV0
size units, particularly at corners, jambs, and, where possible, at other Section 042000, 3.4A
locations.
Lay concealed masonry with all units in a wythe in running bond or
NEOM Spec. S18127-0100D –
bonded by lapping not less than 100-mm. Bond and interlock each
08 PK1-TDR-SPC-TR-01-REV0
course of each wythe at corners. Do not use units with less than
Section 042000, 3.4B
nominal 100-mm horizontal face dimensions at corners or jambs.
Stopping and Resuming Work: Stop work by racking back units in each
course from those in course below; do not tooth. When resuming work, NEOM Spec. S18127-0100D –
09 clean masonry surfaces that are to receive mortar, remove loose PK1-TDR-SPC-TR-01-REV0
masonry units and mortar, and wet brick if required before laying fresh Section 042000, 3.4C
masonry.
Built-in Work: As construction progresses, build in items specified in this NEOM Spec. Section 042000,
10
and other Sections. Fill in solidly with masonry around built-in items. 3.4D
Fill space between steel frames and masonry solidly with mortar unless NEOM Spec. Section 042000,
11
otherwise indicated. 3.4E
Where built-in items are to be embedded in cores of hollow masonry NEOM Spec. S18127-0100D –
12 units, place a layer of metal lath, wire mesh, or plastic mesh in the joint PK1-TDR-SPC-TR-01-REV0
below and rod mortar or grout into core. Section 042000, 3.4F
Fill cores in hollow CMUs with grout 600 mm under bearing plates, NEOM Spec. Section 042000,
13
beams, lintels, posts, and similar items unless otherwise indicated. 3.4G
Build non-load-bearing interior partitions full height of story to NEOM Spec. S18127-0100D –
14 underside of solid floor or roof structure above unless otherwise PK1-TDR-SPC-TR-01-REV0
indicated. Section 042000, 3.4H
With face shells fully bedded in mortar and with head joints of depth NEOM Spec. Section
15
equal to bed joints. 042000, 3.5A-1
Lay solid masonry units with completely filled bed and head joints; NEOM Spec. S18127-0100D –
16 butter ends with sufficient mortar to fill head joints and shove into PK1-TDR-SPC-TR-01-REV0
place. Do not deeply furrow bed joints or slush head joints. Section 042000, 3.5B

14-281000-1100003536-ABT-CIV-ITP-100002 Rev. 00 Page 8 of 13


AQUA BRIDGE Aquaculture Hatchery DBO - 1100003536 ITP No. 14-281000-
FARMS COMPANY Inspection Checklist for CMU Installation 1100003536-ABF-CIV-
ITP-100002

UNIT/ AREA / LOCATION Checklist No: ABF-CIV-CL-1006 WIR No:


DISCIPLINE: Civil Rev: Date:
Applicable for whole Project

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Tool exposed joints slightly concave when thumbprint hard, using a NEOM Spec. Section
17
jointer larger than joint thickness unless otherwise indicated. 042000, 3.5C
NEOM Spec. S18127-0100D –
Cut joints flush for masonry walls to receive plaster or other direct-
18 PK1-TDR-SPC-TR-01-REV0
applied finishes (other than paint unless otherwise indicated.
Section 042000, 3.5D
NEOM Spec. Section 042000,
19 Comply with ASTM C 270 Property Specification Wet mix life: <1.5 hours
2.9B-1
NEOM Spec. Section 042000,
20 Min. cement sand mix: 1:3-4
2.9B-4
NEOM Spec. Section 042000,
21 Testing: ASTM C 780
2.9B-5
NEOM Spec. Section 042000,
22 Grout for Unit Masonry: Comply with ASTM C 476.
2.9D
For bed joints and top surfaces of bearing walls do not vary from level NEOM Spec. Section 042000,
23
by more than 6 mm in 3 m, or 12 mm maximum. 3.3B-1
NEOM Spec. S18127-0100D –
For vertical alignment of exposed head joints, do not vary from plumb
24 PK1-TDR-SPC-TR-01-REV0
by more than 6 mm in 3 m, or 12 mm maximum.
Section 042000, 3.3B-3
For conspicuous vertical lines, such as external corners, door jambs, NEOM Spec. S18127-0100D –
25 reveals, and expansion and control joints, do not vary from plumb by PK1-TDR-SPC-TR-01-REV0
more than 3 mm in 3 m, 6 mm in 6 m, or 12 mm maximum. Section 042000,3.3B-4
For lines and surfaces do not vary from straight by more than 6 mm in 3 NEOM Spec. Section 042000,
26
m, 9 mm in 6 m, or 12 mm maximum. 3.3B-5
For bed joints, do not vary from thickness indicated by more than plus NEOM Spec. Section
27
or minus 3 mm, with a maximum thickness limited to 12 mm. 042000, 3.3C-1
For exposed bed joints, do not vary from bed-joint thickness of adjacent NEOM Spec. Section 042000,
28
courses by more than 3 mm. 3.3C-2
General: Install entire length of longitudinal side rods in mortar with a
NEOM Spec. Section 042000,
29 minimum cover of 16 mm on exterior side of walls, 13 mm elsewhere.
3.6A
Lap reinforcement a minimum of 150 mm.
30 Space reinforcement not more than 406 mm c.c. NEOM Spec. Section 042000, 3.6B
Provide special shapes for lintels, corners, jambs, sashes, movement NEOM Spec. Section 092400,
31
joints, headers, bonding, and other special conditions. 2.2 A-1
Provide square-edged units for outside corners, unless otherwise NEOM Spec. Section 092400,
32
indicated. 2.2 A-2
REMARKS

ABFC Representative NEOM Representative


Construction Representative NEOM PMC
Name, initials & Date: Work ready for Inspection Work not ready for Inspection Name, initials Record reviewed Work Verified
& Date:

QC Inspector NEOM ETSD (Q &E)


Name, initials & Date: Performed Inspection Re work / Work may Proceed Name, initials Record reviewed Work Verified
& Date:

14-281000-1100003536-ABT-CIV-ITP-100002 Rev. 00 Page 9 of 13


AQUA BRIDGE Aquaculture Hatchery DBO - 1100003536 ITP No. 14-281000-
FARMS COMPANY Inspection Checklist for Surface Preparation work prior to 1100003536-ABF-CIV-
ITP-100002
Plastering

UNIT/ AREA / LOCATION Checklist No: ABF-CIV-CL-1007 WIR No:


DISCIPLINE: Civil Rev: Date:
Applicable for whole Project

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Examine areas and substrates, with Installer present, and including


NEOM Spec. S18127-0100D –
welded hollow-metal frames, cast-in anchors, and structural framing,
01 PK1-TDR-SPC-TR-01-REV0
for compliance with requirements and other conditions
Section 092400, Part 3, 3.1A
affecting performance of the Work.
NEOM Spec. S18127-0100D –
Proceed with installation only after unsatisfactory conditions have been
02 PK1-TDR-SPC-TR-01-REV0
corrected.
Section 092400, Part 3, 3.1B
NEOM Spec. S18127-0100D –
Protect adjacent work from soiling, spattering, moisture deterioration,
03 PK1-TDR-SPC-TR-01-REV0
and other harmful effects caused by plastering.
Section 092400, Part 3, 3.2A
Prepare solid substrates for plaster that are smooth or that do not have NEOM Spec. S18127-0100D –
04 the suction capability required to bond with plaster according to ASTM PK1-TDR-SPC-TR-01-REV0
C 926. Section 092400, Part 3, 3.2B
Install components according to requirements for design NEOM Spec. S18127-0100D –
05 designations from listing organization and publication indicated on PK1-TDR-SPC-TR-01-REV0
Drawings And complying with the fire and life safety report. Section 092400, Part 3, 3.3A
Where required as per the Acoustical Report and drawings, seal joints NEOM Spec. S18127-0100D –
06 between edges of plasterwork and abutting construction with acoustical PK1-TDR-SPC-TR-01-REV0
sealant. Section 092400, Part 3, 3.3B

REMARKS

ABFC Representative NEOM Representative


Construction Representative NEOM PMC
Name, initials & Date: Work ready for Work not ready for Inspection Name, initials Record reviewed Work Verified
Inspection & Date:

QC Inspector NEOM ETSD (Q &E)


Name, initials & Date: Performed Inspection Re work / Work may Proceed Name, initials Record reviewed Work Verified
& Date:

14-281000-1100003536-ABT-CIV-ITP-100002 Rev. 00 Page 10 of 13


AQUA BRIDGE Aquaculture Hatchery DBO – 1100003536 ITP No. 14-281000-
FARMS COMPANY Inspection Checklist for Plastering Work 1100003536-ABF-CIV-
ITP-100002

UNIT/ AREA / LOCATION Checklist No: ABF-CIV-CL-1008 WIR No:


DISCIPLINE: Civil Rev: Date:
Applicable for whole Project

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Interior Plasterwork: Maintain room temperatures at greater than 4.4 NEOM Spec. S18127-0100D –
01 deg C for at least 48 hours before plaster application, and continuously PK1-TDR-SPC-TR-01-REV0
during and after application. Section 092400, 1.7B
NEOM Spec. S18127-0100D –
Avoid conditions that result in plaster drying out during curing period.
02 PK1-TDR-SPC-TR-01-REV0
Distribute heat evenly; prevent concentrated or uneven heat on plaster.
Section 092400, 1.7B-1
Ventilate building spaces as required to remove water in excess of that
NEOM Spec. S18127-0100D –
required for hydrating plaster in a manner that prevents drafts of air
03 PK1-TDR-SPC-TR-01-REV0
from contacting surfaces during plaster application and until plaster is
Section 092400, 1.7B-2
dry.
Apply and cure plaster to prevent plaster drying out during curing
NEOM Spec. S18127-0100D –
period. Use procedures required by climatic conditions, including moist
04 PK1-TDR-SPC-TR-01-REV0
curing, providing coverings, and providing barriers to deflect sunlight
Section 092400, 1.7C-1
and wind.
NEOM Spec. S18127-0100D –
05 Apply plaster when ambient temperature is greater than 4.4 deg C. PK1-TDR-SPC-TR-01-REV0
Section 092400, 1.7C-2
NEOM Spec. S18127-0100D –
Protect plaster coats from freezing for not less than 48 hours after set
06 PK1-TDR-SPC-TR-01-REV0
of plaster coat has occurred.
Section 092400, 1.7C-3
NEOM Spec. S18127-0100D –
Factory-Prepared Finishes: Comply with manufacturer's written
07 PK1-TDR-SPC-TR-01-REV0
recommendations for environmental conditions for applying finishes.
Section 092400, 1.7D
Portland Cement Mixes:
a. Scratch Coat: For cementitious material, mix 1-part Portland cement
and 2-1/2 to 4parts aggregate per part of cementitious material.
NEOM Spec. S18127-0100D –
b. Brown Coat: For cementitious material, mix 1-part Portland cement
08 PK1-TDR-SPC-TR-01-REV0
and 3 to 5 parts aggregate per part of cementitious material, but not
Section 092400, 2.5B
less than volume of aggregate used in scratch coat.
c. Admixtures and workability aids, as per manufacturer’s printed
instructions.
Base-Coat Mixes: Single base coats for two-coat plasterwork as follows:
NEOM Spec. S18127-0100D –
Portland Cement Mix: For cementitious material, mix 1-part Portland
09 PK1-TDR-SPC-TR-01-REV0
cement and 3/4 to 1-1/2 parts lime. Use 2-1/2 to 4 parts aggregate per
Section 092400, 2.5D
part of cementitious material.
NEOM Spec. S18127-0100D –
10 Install according to ASTM C 1063 and at locations indicated on Drawings. PK1-TDR-SPC-TR-01-REV0
Section 092400, 3.5A
Reinforcement for External Corners: NEOM Spec. S18127-0100D –
11 1. Install lath-type, external-corner reinforcement at exterior locations. PK1-TDR-SPC-TR-01-REV0
2. Install cornerbead at interior and exterior locations. Section 092400, 3.5B
NEOM Spec. S18127-0100D –
12 Control Joints: Install control joints at locations indicated on Drawings PK1-TDR-SPC-TR-01-REV0
Section 092400, 3.5C
NEOM Spec. S18127-0100D –
13 Bonding Compound: Apply on unit masonry and concrete plaster bases. PK1-TDR-SPC-TR-01-REV0
Section 092400, 3.6B

14-281000-1100003536-ABT-CIV-ITP-100002 Rev. 00 Page 11 of 13


AQUA BRIDGE Aquaculture Hatchery DBO - 1100003536 ITP No. 14-281000-
FARMS COMPANY Inspection Checklist for Plastering Work 1100003536-ABF-CIV-
ITP-100002

UNIT/ AREA / LOCATION Checklist No: ABF-CIV-CL-1008 WIR No:


DISCIPLINE: Civil Rev: Date:
Applicable for whole Project

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Walls; Base-Coat Mix: Scratch coat for two-coat plasterwork, 15 mm


thick on concrete masonry, unless otherwise indicated to meet
acoustical and fire performances indicated in both fire and acoustic NEOM Spec. S18127-0100D –
14 report. PK1-TDR-SPC-TR-01-REV0
1. Portland cement mixes. Section 092400, 3.6E
2. Masonry cement mixes.
3. Portland and masonry cement mixes
NEOM Spec. S18127-0100D –
Plaster Finish Coats: Apply to provide float finish to match Engineer's
15 PK1-TDR-SPC-TR-01-REV0
sample.
Section 092400, 3.6F
Manufacturer
16 The suitable thickness of application is 25mm
Recommendation
If higher thickness is required another layer should be applied after the Manufacturer
17
first layer has initially set (3-6hrs) Recommendation
Accessories shall Comply with ASTM C 1063 and coordinate depth of NEOM Spec. S18127-0100D –
18 trim and accessories with thicknesses and number of plaster coats PK1-TDR-SPC-TR-01-REV0
required. Section 092400, 2.2A
Cornerbeads: Fabricated from austenitic stainless steel according to NEOM Spec. S18127-0100D –
19 ASTM A240/A240M- grade 304.Small nose corner-bead with expanded PK1-TDR-SPC-TR-01-REV0
flanges; use unless otherwise indicated. Section 092400, 2.2B.1A
NEOM Spec. Section 092400,
20 Small nose corner-bead with perforated flanges; use on curved corners.
2.2B.1B
Bull nose corner-bead, radius 19.1 mm minimum, with expanded NEOM Spec. Section 092400,
21
flanges; use at locations indicated on Drawings. 2.2B.1C
Reinforcement for External Corners: NEOM Spec. Section 092400,
22
1. Install lath-type, external-corner reinforcement at exterior locations. 3.5B.1
NEOM Spec. Section 092400,
23 Install corner-bead at interior and exterior locations.
3.5B.2
REMARKS

ABFC Representative NEOM Representative


Construction Representative NEOM PMC
Name, initials & Date: Work ready for Work not ready for Inspection Name, initials Record reviewed Work Verified
Inspection & Date:

QC Inspector NEOM ETSD (Q &E)


Name, initials & Date: Performed Inspection Re work / Work may Proceed Name, initials Record reviewed Work Verified
& Date:

14-281000-1100003536-ABT-CIV-ITP-100002 Rev. 00 Page 12 of 13


AQUA BRIDGE Aquaculture Hatchery DBO - 1100003536 ITP No. 14-281000-
FARMS COMPANY Inspection Checklist for Curing 1100003536-ABF-CIV-
ITP-100002

UNIT/ AREA / LOCATION Checklist No: ABF-CIV-CL-1009 WIR No:


DISCIPLINE: Civil Rev: Date:
Applicable for whole Project

Item Acceptance Criteria Re-Insp.


#
Reference Pass Fail N/A Date

Exterior Plasterwork: NEOM Spec. S18127-0100D –


01 Apply and cure plaster to prevent plaster drying out during curing PK1-TDR-SPC-ST-01-REV0,
period. Section 092400, 1.7C -1
NEOM Spec. S18127-0100D –
Use procedures required by climatic conditions, including moist curing,
02 PK1-TDR-SPC-ST-01-REV0,
providing coverings, and providing barriers to deflect sunlight and wind.
Section 092400, 1.7C-1
Manufacturer
03 Soak the applied surface with water 2-3 times a day
Recommendation
REMARKS

ABFC Representative NEOM Representative


Construction Representative NEOM PMC
Name, initials & Date: Work ready for Work not ready for Inspection Name, initials Record reviewed Work Verified
Inspection & Date:

QC Inspector NEOM ETSD (Q &E)


Name, initials & Date: Performed Inspection Re work / Work may Proceed Name, initials Record reviewed Work Verified
& Date:

14-281000-1100003536-ABT-CIV-ITP-100002 Rev. 00 Page 13 of 13