Declaration Template: Indicator 2.

12
Data required for Q3:

Total amount of operational cost incurred by the ULB for


Solid Waste Management specifically for Collection and Rs. ________
transportation of waste:

Total amount of cost recovered by the ULB through


collection of User Charges, through property Rs. ________
tax/water/electricity bill etc.

The duration for both the heads(above) operational cost and revenue/earning should be the same. For Ex:
performance can also be assessed for total revenue collected till 31 st December 2021 Vs cumulative operational
cost incurred till 31st Dec 2021

Documents to be submitted by the ULB for evaluation:

ULB should submit the detailed statement maintained by it


showing the total operational cost incurred and the
revenue generated. Attached  Not Available. 
Note: The duration for both should be the same.

I hereby declare that the data/information provided above table, on Swachhatam portal and in the attached
documents is true to the best of my knowledge and reflects the status of the progress on ground in the ULB.

Signature & Stamp of the Nodal Officer/Head of the ULB


Name: ULB Code: