Summary
The site we visited on Sunday 12th May 14, 2023 was The Satrudhan hospitals building at Bode
Barsain Municipality, Barsain ward-5 It is located in Saptari in Nepal District Saptari. The site is still
Old Health Post Building So it constructed New hospital Building . Its aim is for all People from illness or
disease should not left to suffer or die but should treated at the highest class.
It is the first hospital in the Bode Barsain Municipality Office of the Rural Municipal Executive
Barsain, Saptari (Madhesh Province) that specify only in the treatment of All people therefore showing
a class in health care and safety in terms of local and international bases. It was started on the 2023 and
is said to be done in June in the year 2026. Employer Say about Hospital procurement process and
construction will begin next month.
The hospital is said to have a 15-bed capacity, it also said to have a 1800 square meters of multi
color of interlock paving and 400 Sq.M of garden and Landscaping, Boundary wall, Mortuary Block in
the Main Hospital Block 1 no’s operation theatres. The hospital also uses a Foundation of matt footing
And Like Good Finishing works, and has Matt Footing a ground floor, a first floor And Second Floor
the hospital is a great hospital, it is the vision of the sheik himself to provide high quality health care to
the future generation.
Ref: Construction works of 15 Bedded Hospital, Bodebarsain-5 (Construction Works of 15 Bedded Main Hospital Block,
Mortuary Block, Boundary Wall & Land
IFB No: BBMS/NCB/WORKS/2079/080-09
Contract Identification No: BBMS/NCB/WORKS/2079/080-09
Table of contents
4 Introduction……………………………………………………
a. Site visit…………………………………………………………
b. Description of site (written and pictures) ……………………
c. Client’s Objectives…………………………………………
5. Risk assessment (safety and hazards) ……………………
6. Site do and don’ts………………………………………
8. References……………………………………………………
Ref: Construction works of 15 Bedded Hospital, Bodebarsain-5 (Construction Works of 15 Bedded Main Hospital Block,
Mortuary Block, Boundary Wall & Land
IFB No: BBMS/NCB/WORKS/2079/080-09
Contract Identification No: BBMS/NCB/WORKS/2079/080-09
Site do and don’ts in a site there are always rules and regulations to ensure peace and a faster work.
Here we are going to look at the things to do or not do in the site worker .
DONT’S DO’S
Don’t steal. Check loading equipment has a valid test
certificate.
Don’t abuse welfare properties. Report faults and hazards immediately.
Ref: Construction works of 15 Bedded Hospital, Bodebarsain-5 (Construction Works of 15 Bedded Main Hospital Block,
Mortuary Block, Boundary Wall & Land
IFB No: BBMS/NCB/WORKS/2079/080-09
Contract Identification No: BBMS/NCB/WORKS/2079/080-09
Materials
Walls The walls are non-load bearing walls, meaning it must support it owns weight, the
weight of live loads and the weight of dead loads. Gypsum boards also known as
dry walls, are placed in the walls to increase resistance to fire. When there is a fire
out break the boards are very useful and will block penetration of fire for up to 2
hours.
Roof Green roof used. It makes it look unique, beautiful and eco- friendly. It is
waterproof and insulation are installed. Timber used to design roof.
Foundation The foundation in the building is a mixture of pile and raft foundation. The hospital
has a square shape therefore meaning there are 4 cores all around it. In each core
there are pile caps under, and raft foundation was used 3m below basement level.
Cladding system Box doubled facades are used in the building because it is the best in hospitals and
helps to prevent air spread of disease. It is a glass facade with panel louvers. It uses
astronomical clock technology that are energy efficient which automatically
changes with time difference.
Ceiling Gypsum board used to prevent from fire.
Columns Concrete columns used
Floor Flexible concrete floor