rem DESCRIPTION UNIT quantity] RATE (RM) AMOUNT RM) WATER RETICULATION (ALL PROVISIONAL) ‘Water Reticulation Works Including All Pipes, Joints And Pitines Notes: All pipes. valves. bends, soecial fittings, et. shall ‘comply with the appropriate British Standard and with Ranhill SAY's and SPAN's approval ‘Test eertitication and Certificate of Conformity forall ‘materials from approved source must be submitted to the Engineer for approval Prior approval must be obtained as to the source of supply of all materials. The contractor shall submit the names of the proposed manufacturers to the Engineer for approval before any onder is placed. The Enginee’s approval shall not relieve the contract All materials supplied and installed shal be in full sain ATIG PERSO approval All installation works shall completed by competent person certified by SPAN, Supply and lav the approved pine connect from existing ‘mefer to building including excavate. disposal of surplus excavated materials, compacted backfill, valves, bends. fituings and all necessary works as directed by S.O. ‘Tenderer shall submit relevant drawings and design calculations endorsed by Professional Engineers with Practising Certificate (PEPC) and competent person certified by SPAN to Ranhill SAJ/SPAN and obtais approval from Ranhill SAJ/SPAN and complete wi apply and install meter. Price deemed to include testing ‘work as SAJ requirement and Specifications. submission fee and contribution fee. Total DICIS ‘To Summary :

You might also like