WATER RETICULATION (ALL PROVISIONAL)
‘Water Reticulation Works Including All Pipes, Joints And
Pitines
Notes:
All pipes. valves. bends, soecial fittings, et. shall
‘comply with the appropriate British Standard and with
Ranhill SAY's and SPAN's approval
‘Test eertitication and Certificate of Conformity forall
‘materials from approved source must be submitted to the
Engineer for approval
Prior approval must be obtained as to the source of supply
of all materials. The contractor shall submit the names of
the proposed manufacturers to the Engineer for approval
before any onder is placed. The Enginee’s approval shall
not relieve the contract
All materials supplied and installed shal be in full
sain ATIG PERSO approval
All installation works shall completed by competent
person certified by SPAN,
Supply and lav the approved pine connect from existing
‘mefer to building including excavate. disposal of surplus
excavated materials, compacted backfill, valves, bends.
fituings and all necessary works as directed by S.O.
‘Tenderer shall submit relevant drawings and design
calculations endorsed by Professional Engineers with
Practising Certificate (PEPC) and competent person
certified by SPAN to Ranhill SAJ/SPAN and obtais
approval from Ranhill SAJ/SPAN and complete wi
apply and install meter. Price deemed to include testing
‘work as SAJ requirement and Specifications. submission
fee and contribution fee.
Total DICIS
‘To Summary :