CONSTRUCTION CHECK SHEET Format

no :EVIO/EL/ITP/F-
ELECTRICAL 07
CABLE INSTALLATION Rev : R-00

ABOVE GROUND
PROJECT BUNGE INDIA PVT LTD PROJECT No. AP-5072

AREA KRISHNAPATNAM CONTRACTOR EVIO PVT LTD

REPORT No. EVIO/BUNGE/CBL- DATE.

LOCATION SYSTEM/DUTY
CABLE ROUTE RACK/TRAY/LADDER
DWG No. LAYOUT DWG No.
CABLE VOLT /
ROUTE FROM ROUTE TO
LENGTH
Inspection Before Cable Laying Results
1. Inspect the cable racks, trays, ladders, pipes/conduits and related accessories for mechanical damage.
2. Check and ensure that the trays and ladders have been routed in accordance with the layout/routing drawing.
3. Check and ensure that spacing between supports for trays & racks is in accordance with the layout/routing drawing.
4. Check fixing of supports.
5. Check the spacing between tray/ladder layers.
6. Check and ensure that correct bends, tees, risers have been installed.
7. Check correct fixing of trays/ladders, bends, tees risers, etc.
8. Check and ensure that all duct banks and pipe sleeves are clean and all sharp edges have been removed.
9. Check bending radius of pipe/conduits and ensure that they are suitable for the cables that are to be pulled through them.
10. Check and ensure that all metal parts are bonded to earth and measure resistance to earth ring.
11. Check that rollers are correctly placed
12. Check that corner rollers are correctly positioned
13. Adequate manpower available
14. Cable bending radius within acceptable limits
15. Pulling team controlled
Inspection After Cable Laying
1. Check and ensure that cable pulled to correct marks.
2. Inspect laid cable for sheath damage.
3. Check and ensure that the spacing between cables is in accordance with the drawings.
4. Check and ensure that cables are fixed to the trays/ladders by ties straps and/or clamps in accordance with the drawings.
5. Check and ensure that all ducts and wall openings are sealed with fire resistant barriers, etc., in accordance with the
drawings.
6. Check and ensure that other services supported and protected
7. Cable route/layout drawing marked up (As-built mark-up).
REMARKS/OBSERVATIONS:

COMPLETED BY CONTRACTOR APPROVED BY PMC/CLIENT


SIGN SIGN
DATE DATE
NAME NAME