CONSTRUCTION CHECK SHEET

Form No:
ELECTRICAL EVIO/EL/ITP/F-09
CABLE INSTALLATION Rev : R-00
BELOW GROUND
PROJECT BUNGE INDIA PVT LTD PROJECT No. AP-5072

AREA KRISHNAPATANM CONTRACTOR EVIO PVT LTD

REPORT No. EVIO/BUNGE/CBL- DATE.

LOCATION: SYSTEM/DUTY:

ROUTE FROM ROUTE TO


TRENCH ROUTE CABLE V /
DWG NO: LENGTH
Inspection Before Cable Laying Results
1. Warning signs posted
2. Trench Depth (mm)
3. Trench Width (mm)
4. Other Services safely supported
5. Ducts correct size and clean
6. Bedding sand free of stones and compacted
7. Rollers correctly placed
8. Corner rollers correctly positioned
9. Adequate manpower available
10. Cable bending radius within acceptable limits
11. Pulling team controlled
Inspection After Cable Laying
1. Check cable spacing
2. Inspect cable for damage
3. Cable pulled to correct marks
4. Cable markers fitted along length
5. Cable protection tiles and caution tapes are installed.
6. Trench filled and compacted
7. Other services restored to normal condition.
8. Backfill the trench (after placing the cover) and compact
9. Cable route markers installed.
10. Trench route drawing marked up (As-built mark-up)
REMARKS/OBSERVATIONS:

COMPLETED BY EVIO Approved by PMC/CLIENT


SIGN SIGN
DATE DATE
NAME NAME