Project : India International Convention and Expo centre (IICC Dwarka)

Labour Report & Updated Status of GFC Drawings.


Man Power Deployment in Day shift (A)
01-03-2021
S.no Works Activity Form Work
Convention Centre S Gallery & Fire Station & HSD Batching Plant Total Work Force
& Sub Station Car Parking VT4 & VT7 EH1& VT1 Foyer 1 & VT2 EH2 Foyer 2 EH-3 ESS 1 & 2 Ramp 3, 5, 6 DG Bldg. Boundary Wall Yard Site Fabrication & Rebar Store & Casting Yard Qc Lab (A)
Yard

1 Civil Works 1,194 51 97 423 220 230 365 808 22 903 218 111 31 94 6 14 15 4,802
3 Labour Strength Structural Steel 406 195 225 215 1,041
2 in Day shifts MEP Works 87 35 0 11 44 22 35 26 10 51 12 13 3 349

4 ICT Works 9 3 6 15 0 4 0 6 1 44

1,696 89 97 635 279 477 404 834 32 954 230 111 50 215 94 10 14 15 6,236 (A)
Total

Man Power Deployment in Night Shift (B) 27-02-2021

S.no Works Activity Form Work


Car Parking & Sub S Gallery & Fire Station & HSD Batching Plant Total Work Force
Convention Centre VT4 & VT7 EH1& VT1 Foyer 1 & VT2 EH2 Foyer 2 EH-3 ESS 1 & 2 DG Bldg. Boundary Wall Site Fabrication & Rebar Store Qc Lab
Station Ramp 5, 6 Yard Yard & Casting Yard (B)

1 Civil Works 51 0 20 40 36 20 35 52 0 22 0 0 0 15 1 14 2 308


2 Structural Steel 44 25 65 18 152
Labour Strength
3 in Night shift MEP Works
4 ICT Works

5 Safety

Total 95 0 20 65 36 85 35 52 0 22 0 0 0 18 15 1 14 2 460 (B)

(C). Anticipated P& M staff (C) . 56 (C)

(D). Site Safety & Surveillance Staff (D). 61 (D)

Total Manpower (A+B+C) =6752 Nos.


STATUS OF GFC DRAWINGS
Approved
Submission EPCC Pending Submission PEAC Pending Review PMC Pending Review PMC Review by IICC
Sl. No Building Name Total Revised Scope of GFC as on Date by % %
drawings Submission Approved
EPCC Revised Fresh Revised Fresh Revised Commented No comments
Fresh Submissions Submission Submissions Submission Submissions Submission by PMC by PMC
1 Architecture 529 519 98% 10 0 12 2 0 0 0 7 512 100%
2 Structure 954 954 100% 0 0 24 9 0 0 1 16 937 100%
3 MEP 1940 1924 99% 16 0 21 20 0 5 7 4 1908 99%
4 Interior 455 455 100% 0 0 18 40 0 2 18 27 408 96%
5 Landscape 147 146 99% 1 0 16 58 0 1 15 6 124 89%
6 Façade 211 211 100% 0 0 0 8 0 0 0 8 203 100%
Total 4236 4209 99% 27 0 91 137 0 8 41 68 4092 98%
Facilities Wise Activity Status 01-03-2021

S.no Works Activity Form Work


Car Parking & Sub S Gallery & Batching Plant
Convention Centre VT4 & VT7 EH1& VT1 Foyer 1 EH2 Foyer 2 EH-3 ESS 1 & 2 DG Bldg. Boundary Wall Fire Station Site Fabrication & Rebar Store QC Lab
Station Ramp 5 Yard & Casting Yard

1 Excavation a
2 Back Filling a a a a a a a a a a
3 PCC/Screed a a a a a a a a
4 Rebar Work a a a a a a a a a a a a a
5 Form Work a a a a a a a a a a a a
6 RCC works a a a a a a a a a a a
7 HDPE Water Proofing a a a a a a a
8 Flooring a a a a a a a a a
9 Civil Works Block Work / Plaster a a a a a a a a a a
10 Dry Wall Partition a a a a a
11 Painting a a a a a a a a a
12 Door /Window Fixing a
13 EPDM Terrace W/Proofing a
14 GSB Filling a a a
15 MS Railing a a
16 Material Handling & Testing a a a
17 Sewer & Storm Water line a
18 Assembly a a a a a a
19 Structural Steel Erection a a a a a a
Works
20 Blasting & Painting a a a a a
21 Linear Sheet Work a a
22 HVAC Ducting a a a a a a
23 Elec. Cable Tray a a a a a a a a
MEP Works
24 Electrical Conducting a a a a a a
25 Piping Work a a a a a a a a
26 Containment a a a a a a
27 ICT Works Cabling

28 Installation 0