BORE PILE BORING DEPTH CASING LENGTH STEEL REBAR LENGTH VOLUME CONCRETE
NO PILE NUMBER CASTING DATE REMARK
DIAMETER (MM) (METER) (METER) (METER) (M3)
1 1 400 14 12 12.64 02.03.2023 2.5 Rebar goes down 2 meter after casing pulled out
2 36 400 14 12 12.64 02.03.2023 2.5 Rebar goes out after casing pull out. Point failed
3 30 400 12 12 12.64 04.03.2023 2.25 Rebar goes down 0.64 meter after casing pulled out
4 16 400 12 12 12.64 04.03.2023 2.25 Rebar goes down 2 meter after casing pulled out
5 38 400 12 12 12.64 04.03.2023 2 Concrete less 3 meter from ground level. Point failed
6 35 400 12 12 12.64 04.03.2023 2 Rebar goes down 2 meter after casing pulled out
7 10 400 14.5 15 14.64 06.03.2023 3 Rebar goes down 0.30 meter after casing pulled out
8 33 400 16 15 14.64 06.03.2023 3
9 34 400 14.6 15 14.64 07.03.2023 3
10 37 400 14.5 15 14.64 + 1 07.03.2023 3 Rebar goes down 0.64 meter after casing pulled out
11 24 400 14.5 15 14.64 + 1 07.03.2023 3
12 31 400 14.5 15 14.64 + 1 07.03.2023 3 Rebar goes down 1.5 meter after casing pulled out
13 22 600 25.5 (from top casing) 15 25.14 19.03.2023 10