WF-428459 - CRS - M3-Sam-Crs-Eel00-T19-000115 - R1 - D4 - Waysidebuild-Mcc (Amr)
WF-428459 - CRS - M3-Sam-Crs-Eel00-T19-000115 - R1 - D4 - Waysidebuild-Mcc (Amr)
WF-428459 - CRS - M3-Sam-Crs-Eel00-T19-000115 - R1 - D4 - Waysidebuild-Mcc (Amr)
OVERALL REVIEW CODE C - Objection - Revise and resubmit. Work may not proceed OVERALL STATUS Red
WF-428459
Transmittal Ref. No. M3-FST-WTRAN-241216(WF-415222) Comments Issued on 10/05/2023 Date CRS Responded by Contractor 5-May-23
M3-SAM-RPT-EEL00-T19-000024
IAT Report for DEPOT-Line-46 WAYSIDE bldgMCC SystemD4_WAYSIDEBUILD-MCC
Transmittal Title Document Type Installation Acceptance Report
Rev.AB
No. Section/ Page/ Drawing No. PMCM Comments Doc. Rev. By Contractor Response By Review Code Status
First cycle comment : Submission of IAT include many Code D, Code C and For Action IR's with
First cycle response : All Code-C/D and ' For Action' IRs Approved. Please refer updated IAT
technical Comments which is not as per IAT Procedure . To avoid unnecessary rejection ,kindly
2 M3-SAM-RPT-EEL00-T19-000024 AA/AB SG file. ZM A
address the comment and resubmit for approval.
Second cycle response :
Second cycle comment : Noted.
Disclaimer : Permission to proceed shall not constitute acceptance or approval of design details, calculations, analyses, test methods or materials developed or selected by the Contractor and shall not relieve the Contractor from full compliance with Contractual
Status
Obligations.
Closed
Agree to Close
Open
Page 1 of 1 CRS_Rev. 2