2. The offer submitted doesn't include any third party certification charges; if it is required
the same shall be done at an extra cost.
4. The system will be warranted for 12 months from the date of commissioning
5. All civil work like Excavation and Backfilling, PCC Pedestal and Construction of Pump room
and Sump etc., are at your scope
6. Wewillprovidesystemserviceduringwarrantyperiodof1year.
8. The safety of materials at site after delivery is at your scope, in case of loss or theft
of materials at site the same shall be supplied to you at extra cost.
10. Required scaffolding, Lifts, and Boom lifts for material movement in site is at your scope.
DIRECTOR