Feeder CBs closing failure issues during power

transmission
Sr Date Station Feeder Faults E&M Power feedback
. CBs
01 21-04- TC-05 311 04:41 OCC monitored on Station#05 fault Power duty
2023 PSCADA that during power personal reporting Time: 04:47 am
Night transmission of mainline at The action taken by the power
shift Pakistan Mint (05), DC team: 1. Checked the PSCADA
breaker 311 is not closing events details. 2. Checked the relay
and showing alarm “Over indications. 3. checked the auxiliary
current due to blue light relay of line test K03 which was
lamp system”. OCC issues found in normal condition no
emergency repair order latching was observed.
(ERO) 042201 to E&M Observations: CB 311 itself
Power to visit on-site, operated and worked in normal
rectify the fault and report. conditions, Protection device
malfunctioned after resetting the
device CB 311 closed and power
was transmitted to the main line at
04:55 am. Moreover, a power
person is deployed for monitoring
and event records.
02 25-04- TC-09 313 04:42 During power Power team reset the 313 CB at TC-
2023 transmission 313 CB at TC- 09.
Night 09 did not close, on 04:55 power transmission has been
shift PSCADA it is showing ‘’blue completed.
lamp system or station
control room IB protection
action’’. Power team reset
the CB .04:55 power
transmission has been
completed.
03 28-04- TC-05 311 04:45 During power Station#5 Fault Power duty personal
2023 transmission of mainline, reporting Time: 04:58 am The
Night A3 power supply zone DC action taken by the power team: 1.
shift 750V feeder CB 311, at Checked the PSCADA events details.
Pakistan Mint (05) did not 2. Checked the relay indications. 3.
close due to "blue lamp checked the auxiliary relay of line
system or station control test K03 which was found in normal
room IB fault". A3 power condition no latching was observed.
supply zone is being Observations: CB 311 itself
supplied in unilateral operated and worked in normal
mode. OCC issued conditions, The Protection aaction
emergency repair order device malfunctioned after resetting
ERO 042901 to E&M Power the device CB 311 closed and power
to rectify the fault and was transmitted to the main line at
report to OCC. 05:09 am. Moreover, a power
person is deployed for monitoring
and event records.
Sr Date Station Feeder Faults E&M Power feedback
. CBs
04 30-04- TC-26 312 04:36 OCC monitored on 04:54 Station 26 Fault Power duty
Feeder CBs closing failure issues during power
transmission
2023 PSCADA that during power personal reporting Time: 04:53 am
Night transmission of mainline, The action taken by the power
shift Ali Town (26) CB312 team: 1. Checked the PSCADA
tripped due to “over events details. 2. Checked the relay
current integrated tripping indications. 3. checked the auxiliary
signal” and mainline B14 relay of line test K03 which was
section power supply mode found in normal condition no
change from bilateral to latching was observed.
unilateral. OCC issues Observations: CB 312 itself
emergency repair order operated and worked in normal
ERO 050101 to E&M power conditions, Protection device
to visit onsite and rectify malfunctioned after resetting the
the fault. At 04:51, E&M device CB 312 closed and power
power personnel reached was transmitted to the main line at
at Ali Town (26). At 04:53, 04:54 am. Moreover, a power
E&M power reset the 312 person is deployed for monitoring
CB. At 04:54, OCC and event records.
successfully close the 312
CB and completed the
power transmission of
mainline.