PROJECT :

PROJECT LOCATION:

COLUMN DETAILED PLAN

REBAR CALCULATION PER COLUMN

1. BEND AT FOOTING BASE:


2. LENGTH FROM FOOTING TO THE GROUND
FLOOR:
3. LENGTH FROM THE GROUND FLOOR TO
THE BEAM SOFFIT:
4. DEPTH OF BEAM:
5. DOWEL:

TOTAL LENGTH: 0

TOTAL REBAR FOR COLUMN

NUMBER OF MAIN BARS PER COLUMN: 6 pcs


NUMBER OF COLUMN: 8 column
TOTAL BARS: 48 pcs
COMMERCIAL LENGTH USED: 6m

TOTAL NUMBER OF MAIN BARS


8 pcs
( TOTAL BARS/COMM. LENGTH ):

NUMBER OF LATERAL TIES

HEIGHT FOR LATERAL TIES ( BOF TO BOS ):


CONCRETE COVER ( CC ):
SPACING ( COUNT ):
1 - 0.05 m
3 - 0.1 m
REST - 0.2 m

NUMBER OF TIES PER SPACING:

0.05 m = 4 pcs
0.1 m = 6 pcs
0.2 m = 20 pcs
TOTAL 30 pcs

NUMBER OF TIES PER COLUMN: 30 pcs.

LENGTH OF LATERAL TIES

CONCRETE COVER: