ORDER PENAMBAHAN KEBUTUHAN MATERIAL

KALTENG

NO ITEM PEKERJAAN SATUAN JUMLAH

1 2 3 4

I KUSEN PINTU DAN JENDELA BOUVEND


1 Kusen dan Daun Pintu ( P1 ) + Accesorisnya Unit 7
2 Kusen dan Daun Pintu ( P2 ) + Accesorisnya Unit 4
3 Bouvend ( BV ) Unit 4
4 Kusen dan Daun Pintu Kupu Tarung ( PK ) + Accesorisnya Unit 1

II INSTALASI WATER HEATER, WASHTAFEL DAN ACCESORISNYA


SERTA INSTALASI AIR BERSIH DARI TANDON
1 Selang Hose Fleksibel spiral Panjang 40 cm uk. 1/2 Inchi Pcs 54
2 Knee Drat dalam Pipa air panas uk. 1/2 Inchi Pcs 104
3 Double Nipple besi untuk uk. 1/2 ke 1/2 inchi Pcs 54
4 Knee Pipa Pvc 1/2 inchi Pcs 244
5 T bow Pipa Pvc 1/2 Inchi Pcs 72
6 Lem Pipa besar Kaleng 5
7 Knee Pipa PVC drat dalam plastik uk.1/2 inchi Pcs 26
8 Pipa air panas ( pipa Pex ) uk. 1/2 Inchi Meter 50
9 Shock drat laki Pcs 20
10 Reducer 3/4 ke 1/2 Pcs 20
11 Pipa PVC 1/2 Batang 150
12 Pipa PVC 3/4 Batang 2
13 Kran 1/2 inchi Pcs 10
14 Stopper ktan 3/4 Pcs 20
15 Water Mour 3/4 Pcs 20
16 Isolatif Pcs 10

III INSTALASI LISTRIK DAN AC (AIR CONDITIONER )


1 Las dop T dos Pcs 40
2 Kabel NYA 2,5 merah Rol 5
3 Kabel NYA 1,5 hitam Rol 5
4 Kabel NYA 1,5 biru Rol 5
5 Kabel NYA 1,5 kuning/ hijau Rol 3
6 Kabel NYM 3 x 2,5 Meter 100
7 Pipa 20 mm Batang 150
8 STK AC Pcs 10
9 STK Pcs 66
10 Steker AC Pcs 32
11 MCB 6 A Pcs 6
12 Box MCB 26 Rup Pcs 2
13 Fiting Pcs 20
14 Pipa AC 1 PK Meter 160
15 Braket AC Set 31
16 Bohlam 10 watt merk philps Pcs 15

IV PEMASANGAN PARTISI GRC


1 Self Drilling Screw Flat Philips Zinc 4 ribs under head Box 17
uk. 3,5 x 32 m/m #6 x 1 - 1/4 "
2 Trus 75 65 Batang 280
3 GRC tebal 6 mm Lembar 185

V PENGECATAN
1 Cat Putih Peil 25
2 Cat Abu-Abu Peil 8
3 Kuas + Roll (roll nya ) Pcs 5

VI KERAMIK
1 Keramik Putih uk. 40 x 40 cm Duz 27
2 Keramik kasar dan lantai wc uk. 40 x 40 cm Duz 52
3 Keramik Dinding Wc uk. 25 x 40 cm Duz 110

VII INSTALASI AIR KOTOR/SEPTICTANK


1 Y bow 4 inchi Pcs 13