ENERGY AUDIT SCOPE OF WORK

Brief Scope of Work:

The following methodology should be adopted to carry out the various activities during
the Energy Audit.

Evaluation Measurement of various parameters (electrical /mechanical) with the help of


calibrated instruments. In some of the cases, if measurement is not possible then the
reading should be taken from control room or local installed panel meters or gauges. Based
on the measurements, the process energy losses should be quantified. After considering
the optimum energy requirement to the process, the best alternatives should be suggested
for efficient utilization of energy resources.

All the site measurement and data collection should be completed within a maximum of
one month time frame.

Feasibility Study:

To minimize various energy losses in the power generation processes, number of


alternatives should be considered on energy/cost basis for feasibility study. Based on your
optimum energy cost requirement, the best alternative should be suggested for efficient
utilization of your process energy. The results of feasibility study should be submitted in
the form of a report along with the recommendations.

Potential Investments and Saving:

The energy saving potentials may be estimated in three categories namely.


• Without investment
• Minor investment
• Major investment

The draft report should be submitted within one month from the date of completing all the
site measurement.

and data collection. After scrutinizing the draft report, the final report will be accepted.
The major plants and system included for energy audit study are as under

• Auxiliary Cooling Water Systems


• Feed Water System
• Condenser performance
• Main & Auxiliary Steam system
• Vacuum system
• Plant and Control Air System
• Individual Heater Performance
• Heat cycle pumps -BFP & CEP performance
• Heat Balance Study
• Coal Mill System
• Primary, Secondary, Seal Air Fans & ID fans
• ESP
• Air Pre-heater (APH) performance
• Natural Draft cooling tower performance
• Condensate Extraction system
• HP, IP & LP cylinder efficiency
• Plant Lighting System (Boiler & Turbine areas)
• Transformers & Electrical Harmonic Analysis (UAT, ESP, & Station)
• HT motors current signature analysis for motor efficiency gap analysis.
• Performance study of steam traps if any
• Air Compressor System
• Insulation & Refractory study
• Air conditioned & Refrigeration systems (control room)
• Boiler performance
• Turbine Heat Rate
• Overall Heat Rate
• Auxiliary Power Consumption
• Submission of Form-2 & Form-3 for statutory requirement of BEE.

Note:
Loading condition of motors > 15 KW should be considered for audit studies. The detailed
scope of work in given in Annexure-A.

The following information prior to the energy audit study shall be provided.

1. Name and address of unit/site where measurements are to be carried out.


2. Plant history and geographical location
3. Activities/ projects already completed/ undertaken for energy conservation.
4. Brief description of plant process with important process parameters and single line
diagram
5. Single line diagram of the electrical distribution system
6. Name plate rating of all the motors and driven equipment’s
7. Design flow/head of pumps, Fans/Blowers
8. Rating of the transformers, rating of capacitors installed with the locations.
9. Test report of transformers supplied by manufacturer.
10. Any other details to prepare the energy audit report.
11. Necessary arrangements and assistance for site preparation, connection, and
disconnection of
12. measuring instruments/fixtures to the supply system.
13. Safe custody of equipment before and after the measurement at the site.
14. Technical coordinator and assistance to plan and coordinate the activities at all
areas.
15. Contact person or coordinator name, phone/fax number (office & residence)
Energy Audit Report (Draft & Final).

The comprehensive audit report should contain all energy saving measures, which are
identified & quantified, along with recommendation and action plan.

The following outlines the final report of the energy audit.

1. Table of contents.
2. Executive Summary.
3. Field measurement of all consumption.
4. Schematic diagram with mass & energy balance all measured system.
5. Identifying relationship of production processes & operational methods being
following and
6. details of changes required for energy saving.
7. Identifying the major factors, which are contributing to high-energy consumption
for all the systems.
8. Recommendations to reduce energy consumption relating to system changes
(process improvement, maintenance practices, replacement or modification etc.).

9. Detailed estimates of project costs, with supporting documents from vendors and
equipment specifications.
10. Comprehensive benefit / cost analysis.
11. Payback period calculation keeping in view the energy cost of Raipur TPS.
12. Total impacts on the system on implementation of all the recommendations with
various level of production.
13. Related impact, on the system reliability, availability, and stability.
14. List of instruments and devices used during audit with accuracy level and
traceability of calibration status.