3D GRC Daily Production - Vendor Wise

Date: 10-Nov-21

UOM (Sqm)
Produced till
Required Delivered to Manpower
Sl. Vendor / date in
Scope (Sqm) production Site till date Today Remarks
No. Location current

10-Nov-21

11-Nov-21

12-Nov-21

13-Nov-21

14-Nov-21

15-Nov-21

16-Nov-21

17-Nov-21

18-Nov-21

19-Nov-21

20-Nov-21

21-Nov-21

22-Nov-21

23-Nov-21

24-Nov-21

25-Nov-21

26-Nov-21

27-Nov-21

28-Nov-21

29-Nov-21

30-Nov-21
1-Nov-21

2-Nov-21

3-Nov-21

4-Nov-21

5-Nov-21

6-Nov-21

7-Nov-21

8-Nov-21

9-Nov-21
Total Qty per day (Sqm) (Nos)
Produced till Planned for month
assigned to
last month the month
the vendor

Ceiling stud frames fabrication is in


progress. All façade stud frames
Al Tasnim
1 9,790 9,790 2,569 1,050 23.2 23.2 31.5 - - - - 24.4 30.2 132.4 51.0 40 fabrication shifted to site and
(Ahmedabad)
Faridabad. Raw material shortage for
stud frames fabrication.

Al Tasnim Unavailability of raw material of stud


2 5,000 5,000 1,487 750 14.0 16.4 14.0 - - - - 11.7 16.4 72.5 37.6 18
(Vadodara) frames delaying progress.

Al Tasnim 1,776 Unavailability of raw material of stud


3 7,000 7,000 3,343 2,225 27.7 18.5 18.5 - - - - 27.7 27.7 120.0 116.9 22
(Faridabad) frames delaying progress.

Mahesh Prefab
4 7,300 7,300 - 1,129 - - - - - - - - - - 62.7 -
(Khushkhera)

Facility 5
5 249 - - - - - - - - - - -
(Bhiwadi)

Grand Total 29,090 29,090 7399 5403 64.9 58.0 64.0 0.0 0.0 0.0 0.0 63.8 74.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 325.0 268 1776 80

Note: