SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam

- Full

You got 80 of 80 possible points.


Your score: 100 %

Question Results

Question: Score 1 of 1

In the course of a project phase, the customer raises some questions concerning parameters of the procurement
type in the material master in the SAP ECC system. Which of the following procurement type properties apply?

There are 2 correct answers to this question.

Response:

If both procurement types are allowed with entry X, requirements planning assumes in-house production.

A material's procurement type can always be freely selected between E (in-house production), F (external procurement)
and X (both procurement types).

If procurement type E (in-house production) is set, external procurement may still be permissible.

Procurement types E (in-house production) and F (external procurement) have to be further refined with special
procurement types.

Question: Score 1 of 1

You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-
specific actual data from an external process control system to SAP ECC.

How can you fulfill this requirement?


Please choose the correct answer.

Response:

Use the core interface (CIF).

Use the PI-PCS interface.

Use the service application interface (SAPI).

Use the PP-PDC interface.

Question: Score 1 of 1

Which of the following master data do you need to make available for repetitive manufacturing?
There are 3 correct answers to this question.

Response:

Repetitive manufacturing profile

Production versions
Product cost collector

Production supply area

Master records for serial numbers

Question: Score 1 of 1

Which of the following functions occur when a production order is created?


There are 3 correct answers to this question.

Response:

Copying a document that is assigned to the material master for the product to be produced

Calculating the quantity to be produced on the basis of the available material stocks

Calculating the lead time for the production order

Selecting and copying a bill of material

Selecting and copying a routing

Question: Score 1 of 1

Which Customizing element controls the determination of planned costs in production orders?
Please choose the correct answer.

Response:

Accounting type

Calculation procedure

Costing variant

Settlement profile

Question: Score 1 of 1

Where can you define the default storage location for the material component of a production order?
There are 3 correct answers to this question.

Response:

BOM header (product)

Material master (component)

Routing

Production version (product)

Production supply area of a work center


Question: Score 1 of 1

You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning
procedures?

Please choose the correct answer.

Response:

Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning ->
Capacity planning

Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material
requirements planning

Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning ->
Capacity planning

Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning ->
Capacity planning

Question: Score 1 of 1

In modeling in-house production using SAP ECC, bills of material (BOM) are to be recorded in the system. On which
business levels can you create a BOM?
There are 2 correct answers to this question.

Response:

At the plant level

At the company code level

At the client level

At the business area level

Question: Score 1 of 1

Which object in customizing controls the determination of planned total overhead process costs for production
orders?
Please choose the correct answer.

Response:

Accounting type

Cost log

Settlement profile

Costing variant

Question: Score 1 of 1

Which statement regarding lot size procedures is correct?


Please choose the correct answer.

Response:

The lot size quantity can be influenced using a minimum quantity and the rounding profile.
The procurement quantity of a lot size procedure can be specified using a safety time period profile.

If a make-to-order production strategy is in use, a lot for lot (exact) lot size is always determined for the corresponding
procurement element.

If a long-term lot size is in use, procurement is conducted with a long-term perspective.

Question: Score 1 of 1

The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
Please choose the correct answer.

Response:

Planning with make-to-stock (strategy 10)

Planning with final assembly (strategy 40)

Planning without final assembly (strategy 50)

Planning at the assembly level (strategy 70)

Question: Score 1 of 1

Which of the following situations occur when a production order is set to Technically Complete (TECO)?
There are 3 correct answers to this question.

Response:

Purchase orders for external operations or non-stock materials are deleted.

The order and its operations receive the system status Locked (LKD).

Reservations are deleted.

Capacity requirements are deleted.

The order is no longer relevant for Material Requirements Planning.

Question: Score 1 of 1

Which of the following master data can be used with process orders?
There are 3 correct answers to this question.

Response:

Production/resource tools

Production versions

Resources

Serial numbers
Master recipes

Question: Score 1 of 1

Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus
generate run schedule quantities (RSQ) from normal planned orders?

There are 3 correct answers to this question.

Response:

Automatic selection of the production version in material requirements planning (MRP) using the selection methods
setting

Automatic selection of the production version by applying quota arrangement records in material requirements planning
(MRP)

A planning algorithm from capacity planning

Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)

Manual assignment of planned production quantities in a planning table

Question: Score 1 of 1

In the SAP ECC system, you interpret the result of a routing schedule. When scheduling a routing in the SAP ECC
system which of the following time elements are inter operation times?

There are 2 correct answers to this question.

Response:

Floats before and after production

Processing time

Safety time

Move time

Question: Score 1 of 1

A user has entered planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a
product. For the coming months, requirements with requirement type LSF (derived from the main strategy 10)
have been planned.

The user would like to change the requirement type from LSF to VSF planning with final assembly (in accordance
with planning strategy 40) for requirements in the production plan that have already been saved.

Which of the following statements are applicable in this case?


There are 2 correct answers to this question.

Response:

The planning strategy group can be changed from 10 to 40 in the existing production plan, and the requirement type for
all requirements is changed automatically.

The user can enter the new planning strategy group 40 in the material master of the product, but the requirement type is
not changed automatically for existing requirements.

The user has to change the requirement type for planning strategy 10 to VSF planning with final assembly in Customizing.
The requirement type for all existing requirements is then changed automatically.

The present requirement for the product can be changed manually from LSF to VSF in the Requirement Type field in the
production plan, so that the new strategy 40 determines the next planning operation.

Question: Score 1 of 1

The master data for a logistical process is to be stored in the SAP ECC system. In this context, you require the
production versions for subsequent planning and production. You know a mass maintenance transaction that you
could use here.

Where else in the SAP ECC system could you define production versions?
Please choose the correct answer.

Response:

In the repetitive manufacturing profile in Customizing.

In the line routing.

In the material master.

In the work center.

Question: Score 1 of 1

You set a rolling planning time fence (firming type = 1) for a material in an SAP ECC system. When an unforeseen
production failure occurs, firmed planned orders might fall into the past.

How can these firmed planned orders be deleted automatically?


Please choose the correct answer.

Response:

Use an MRP type in which the roll-backwards mechanism is activated.

Use reorganization.

Use an MRP type in which the roll-forward.

Activate demand adjustment in Customizing.

Question: Score 1 of 1

Which of the following statements about the planning functions available in SAP ECC are true?
There are 2 correct answers to this question.

Response:

In demand management (DM) material shortage situations are identified and given requirement coverage elements.

Master production scheduling (MPS) refers to preferred planning of important materials.

Material requirements planning (MRP) does not include automatic capacity leveling.

Long-term planning (LTP) is a long-term form of forecast planning.

Question: Score 1 of 1
What are the consequences of setting a production order to Technically Complete (TECO)?
There are 3 correct answers to this question.

Response:

The order and its operations receive the system status Locked (LKD).

Confirmations are no longer possible.

The order is no longer relevant for material requirements planning.

Capacity requirements are set to null.

Reservations are no longer relevant for material requirements planning.

Question: Score 1 of 1

From what point can you no longer use the Read PP master data in the production order?
Please choose the correct answer.

Response:

From the release of the production order.

After assigning the confirmed quantity of a material component due to carrying out a material availability check.

After printing the order papers.

After the first posting of goods movements or confirmation.

Question: Score 1 of 1

Which options can you offer a user of the SAP ECC system for managing costs (costing and settlement) with
regards to production orders?

There are 2 correct answers to this question.

Response:

Order-based costing

Work center-based costing

Series-based costing

Product cost collecting

Question: Score 1 of 1

Which of the following master data do you need to provide for process manufacturing?
There are 3 correct answers to this question.

Response:

Production versions

Resources

Product cost collector


Master recipe

Serial numbers

Question: Score 1 of 1

Which of the following master data is necessary for the creation of material reservations for production orders?
Please choose the correct answer.

Response:

Material master records

Production versions

Routings

Production/resource tools

Question: Score 1 of 1

In your enterprise, a planning strategy is used in SAP ECC that enables joint planning of all MRP scheduled
assemblies for a finished product to trigger procurement of these assemblies.

It is important to ensure that the finished product is only produced when there is a customer order present.

When a customer order is received, production of the finished product should be triggered in the form of make-to-
order planning and production.

Which planning strategy covers this scenario?


Please choose the correct answer.

Response:

Planning with make-to-stock (strategy 10)

Planning with final assembly (strategy 40)

Planning without final assembly (strategy 50)

Planning at the assembly level (strategy 70)

Question: Score 1 of 1

What do you have to consider regarding consumption?


There are 2 correct answers to this question.

Response:

Consumption takes place on the material level between the planned independent requirements and the planned orders.

Consumption can take place between order reservations and planned independent requirements, depending on the
strategy.

Consumption is restructured with the planning run.

Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP
group.
Question: Score 1 of 1

Which issue can occur if the lot size-dependent in-house production time in the material master is not updated
after changing the routing?
Please choose the correct answer.

Response:

Dependent requirements request the components from the bill of materials at wrong times when using basic dates
scheduling.

Requirements planning creates an appropriate exception message in basic dates scheduling.

Lead time scheduling cannot take place.

Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.

Question: Score 1 of 1

The Service Desk is available as part of the SAP Solution Manager. Which functions are included in the scope of the
Service Desk?
There are 2 correct answers to this question.

Response:

Troubleshooting

SAP Help

Process for processing messages

Managing SAP Notes

Question: Score 1 of 1

A new material with the following properties is to be recorded in SAP ECC. the material is kept in stock, is
externally procured, and is used as a component in the bills of material for various final products. However, this
material may not be purchased directly.

Which standard SAP material type would you use?


Please choose the correct answer.

Response:

NLAG (non-stock material)

HAWA (trading good)

FERT (finished product)

ROH (raw material)

Question: Score 1 of 1

What can you use to organize material staging for production orders?
There are 3 correct answers to this question.

Response:

Pull list
Material documents

KANBAN

Logistics Information System (LIS)

Transfer orders

Question: Score 1 of 1

What master data do you need for material replenishment using the KANBAN procedure?
There are 2 correct answers to this question.

Response:

Rate routing

Control cycle

Production version

Production supply area

Product cost collector

Question: Score 1 of 1

A user of the SAP ECC system wants a rolling planning time fence (firming type = 1) to be set up for a material; in
other words, new planned orders are firmed within a planning time fence.

When an unforeseen production failure occurs, it can happen that such firmed planned orders are not being
processed because time passes.

What solution would automatically delete firmed planned orders?


Please choose the correct answer.

Response:

The demand adjustment activated in the Customizing for demand adjustment is used.

In the material master, an MRP type is used in which the roll-forward mechanism is activated (Customizing for
requirements planning).

Firmed planned orders can only ever be deleted manually because of the header data firming.

Question: Score 1 of 1

Which of the following organizational units can be used for planning and manufacturing in an SAP ECC system?
There are 3 correct answers to this question.

Response:

MRP area

Sales Location

Sales area

Storage location
Distribution channel

Question: Score 1 of 1

A customer wishes to only produce a finished product when customer orders for it are present. Final assembly
should then be carried out at short notice in make-to-order production.

Up until this point, the important assemblies needed in final assembly should already be available in stock.
Provision of these assemblies should therefore be triggered by planning.

Which options could you offer the customer as useful alternatives in SAP ECC?
There are 2 correct answers to this question.

Response:

The finished product uses strategy 30 (production by lots) and all the important assemblies in the bill of material for the
finished product should have strategy 70 (planning at the assembly level).

The finished product uses strategy 20 (make-to-order production) and all the important assemblies in the bill of material
for the finished product should have strategy 70 (planning at the assembly level).

The finished product uses strategy 40 (planning with final assembly) and all the important assemblies in the bill of
material for the finished product should have strategy 70 (planning at the assembly level).

The finished product uses strategy 50 (planning without final assembly) and all the assemblies in the bill of material for
the finished product have no strategy.

Question: Score 1 of 1

Which of the following possible errors would lead to the message shown?
There are 2 correct answers to this question.

Response:

There are no valid routings or no routings available on the explosion date.

The material master (product) is set to manual routing selection and valid routing exists.

The Customizing for the order type is set to manual routing selection and a valid routing exists.

In the material master, plan selection was set to production version. A production version was created and it is faulty.

Question: Score 1 of 1

Which of the following requirements for a manufacturing plant can be supported by using process manufacturing?

There are 3 correct answers to this question.

Response:

Manufacturing in charge quantities.

Variable calculation of material quantities (product output, material usage).

Master recipe-based manufacturing.

Manufacturing without orders.

Material requirements planning for production resources.


Question: Score 1 of 1

What sequence do you follow in master data maintenance to define the production of a material?
Please choose the correct answer.

Response:

Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing

Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center

Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing

Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center

Question: Score 1 of 1

In which scenario following error message occur?

Routing selection P-100

No routing found:

Material - P-1000
Plant - 1000
Quantity - 10 PC
Explosion Date - 05.06.2009

Please choose the correct answer.

Response:

The selection method is set to "selection only by production version" in the material master.

The material master is set to manual routing selection and a valid routing exists.

The routing is not valid at the explosion date.

The Customizing for the order type is set to manual routing selection and a valid routing exists.

Question: Score 1 of 1

An enterprise based in the USA produces an end product that is used with the unit of measure "pound" (LB). The
material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit
kilogram (KG).

Which of the following solutions does SAP ECC offer?


Please choose the correct answer.

Response:

There is no need to take any action. There is a general conversion in the central customizing of units of measurements, so
that automatic conversion of pounds to kilograms takes place.

You create a new material with a reference to the original material and assign the metric unit of measure to the new
material master.

In the material master, you create a conversion factor for converting pounds to kilograms on basic data view 1.

In the basic data customizing, you create a unit of measure group that converts pounds to kilograms. You then assign this
to the material master on basic data view 1.
Question: Score 1 of 1

What are the consequences of a confirmation of an operation?


There are 2 correct answers to this question.

Response:

The produced and confirmed quantity is automatically posted to the warehouse stock as a receipt.

Serial numbers are assigned for the confirmed quantity.

The operation's capacity requirements are reduced.

Actual costs are posted for the production confirmed.

Question: Score 1 of 1

A supply chain planning run is to be carried out in the SAP ECC system as an example. What would be the most
effective sequence in which to run through the planning modules?

Please choose the correct answer.

Response:

1. Long-term planning
2.Sales and Operations Planning
3. Demand management
4. Requirements planning
5. Capacity planning

1.Sales and Operations Planning


2. Demand management
3. Long-term planning
4. Requirements planning
5. Capacity planning

1. Capacity planning
2. Sales and OperationsPlanning
3. Demand management
4. Long-term planning
5. Requirements planning

1. Demand management
2. Sales and Operations Planning
3. Capacity planning
4. Long-term planning
5. Requirements planning

Question: Score 1 of 1

In the SAP ECC system, a material is produced using production orders. The planning table for repetitive
manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you
select this material and then receive a message informing you that you cannot use the planning table for this
material.

Planning Table Initial Screen: Change Mode

Planning Table

No elements exist for the selection MF50 t37tdc00 INS


What could be the reason?

Please choose the correct answer.

Response:
The repetitive manufacturing indicator has been set.

There is no valid production version for this material.

There are no planned orders or production orders present.

There are no requirements present.

Question: Score 1 of 1

Which of the following statements is true for the simulation mode in the context of material requirements planning
in SAP ECC?
Please choose the correct answer.

Response:

The simulation mode opens the analysis of the delay time. Manual rescheduling of the receipt in the finished product and
subsequent requirements planning lead to a solution that is feasible from the requirements planning perspective.
However, this solution may lead to a date/time violation in the finished product.

The simulation mode represents an interactive multilevel form of planning, the result of which is automatically posted to
the database after the planning run.

Assuming a delay time in the critical path, the simulation mode triggers multilevel bottom-up scheduling through to the
finished product, which therefore receives a delayed receipt.

The simulation mode is used in scenarios in which requirements planning created the procurement element prematurely
in terms of demand.

Question: Score 1 of 1

Which options can you use to convert planned orders into production orders in the SAP ECC system?
There are 3 correct answers to this question.

Response:

Customizing for the planned order

Automatically in the planning run (MRP)

Background processing in a program

Order progress report

Mass processing

Question: Score 1 of 1

You want to use production/resource tools in your manufacturing process. Which production type do you use?

Please choose the correct answer.

Response:

Production order

Process order

KANBAN
Repetitive manufacturing

Question: Score 1 of 1

Which of the following master data is mandatory for production order processing, when material reservations and
capacity requirements for operations should be generated automatically?

There are 2 correct answers to this question.

Response:

Inspection characteristics

Routing

Production versions

Document structure

Material master records (product and material component)

Question: Score 1 of 1

Which statements are true for ECC Long-Term Planning (LTP)?


There are 2 correct answers to this question.

Response:

A planning scenario must be released to use it in long-term planning.

Reorder point planned materials can be included in long-term planning.

Long-term planning generally is operational planning of important components.

In case of external procurement, long-term planning creates purchase requisitions.

Question: Score 1 of 1

In which of the following objects can you activate backflushing of components if you want to use this functionality
during order confirmation?

There are 3 correct answers to this question.

Response:

Production Scheduling Profile

Routing

Material Master (Component)

Work Center

Material Master (Finished Product)

Question: Score 1 of 1
For a specific end product, you want to use a planning time fence and fixing type 1 to ensure that the planning
situation in SAP ECC calms down in a short-term time window.

Two customer orders arrive at short notice and their receipts should really be within the planning time fence, due
to their date/time.

Which statement is true with this scenario?


Please choose the correct answer.

Response:

Within the planning time fence, the newly created planned orders are automatically frozen by requirements planning (roll
forward).

The MRP controller has no possibility of creating planned orders within the planning time fence.

Newly created planned orders cannot be created by requirements planning before the end of the planning time fence, at
the earliest.

Requirements planning only examines changes that are relevant to scheduling within the planning time fence; the
customer orders are covered in time.

Question: Score 1 of 1

What do you have to consider, when you use the ATP (Available To Promise) checks for material?
There are 2 correct answers to this question.

Response:

ATP checks are mandatory for lead-time scheduling.

ATP checks can be carried out automatically when releasing a production order.

ATP checks are used to evaluate the free capacity on a certain work center.

ATP checks are automatically performed during Material Requirements Planning (MRP) runs.

ATP checks can be adjusted to also consider future requirements and receipts.

Question: Score 1 of 1

When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the
assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.

Which planning procedure do you use to create a feasible production plan from a requirements planning
perspective?
Please choose the correct answer.

Response:

Interactive single-item planning for the delayed assembly

Multi-level single-item planning with the "simulation mode" option

Multi-level single-item planning with the "display material list" option

Total planning online

Question: Score 1 of 1

Which functions lead to a reduction in the capacity requirement for an individual operation at a work center?
There are 3 correct answers to this question.

Response:

Confirming the operation

Reducing the order quantity

Setting the status technically complete (TECO)

Rescheduling the operation

Posting the goods receipt for the production order

Question: Score 1 of 1

Which objects can you use in the production order for a material component to propose the storage location in its
reservation?
There are 3 correct answers to this question.

Response:

Production version

Work center

Material master (component)

Material master (product)

Routing

Question: Score 1 of 1

You want to produce a finished product only when it is requested by a customer order in make-to-order
production. However, all assemblies need to be procured beforehand.

How can you fulfill these requirements in SAP ECC?


There are 2 correct answers to this question.

Response:

Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of
material.

Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level)
for all assemblies in the bill of material.

Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for
all assemblies in the bill of material.

Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all
assemblies in the bill of material.

Question: Score 1 of 1

The company you advise wants to control the availability check in so that when a production and/or process order
is created, the following receipts or issues are taken into account: planned orders, purchase orders, production
orders, reservations, dependent requirements.
When the production and/or process order is released, only the stock that is currently freely usable should be
taken into consideration. How can you fulfill this request?

Please choose the correct answer.

Response:

Activate the freely usable stock in the scope of check.

Enter an appropriate availability checking group in the material master.

Enter an appropriate availability checking rule in the order type.

Differentiated assignment of two different checking rules in check control.

Question: Score 1 of 1

Where can you define the valid receivers for production order costs?
Please choose the correct answer.

Response:

In the settlement profile

In the valuation variant

In the costing variant

In the production scheduling profile

Question: Score 1 of 1

What could be a consequence of confirming an operation?


Please choose the correct answer.

Response:

The production order is rescheduled

The actual costs are settled

The capacity requirements are updated

The planned costs are updated

Question: Score 1 of 1

Which information is contained in production versions for selecting routings and bills of material?
Please choose the correct answer.

Response:

The routing and BOM alternatives to be used for production

All the control parameters for selecting routings and bills of material

The plant for which the routing and BOM have to be created

The explosion date on which the validity of the routing and bill of material is checked
Question: Score 1 of 1

What is SAP Solution Manager?


Please choose the correct answer.

Response:

A standalone system that communicates with other systems in a system landscape

A transaction in the SAP ECC system

A managed system in a system landscape

An add-on industry solution

Question: Score 1 of 1

Which of the following statements about ATP (Available To Promise) checks for material components are correct?
There are 2 correct answers to this question.

Response:

ATP checks are automatically performed during MRP (Material Requirements Planning) runs.

ATP checks can be adjusted to also consider future requirements and receipts.

ATP checks are mandatory for lead-time scheduling.

ATP checks are used to evaluate the free capacity on a certain work center.

ATP checks can be carried out automatically when releasing a production order.

Question: Score 1 of 1

A user you advise wishes to transfer variable process instructions for automated processing directly to certain
work centers and machines in the production department (for example, feed speed, pressing pressure, dry
temperature).

The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work
centers and machines and to process these messages for feedback concerning production orders.

Which of the following options would you recommend to implement these requirements?
Please choose the correct answer.

Response:

SAP Application Link Enabling (ALE)

SAP Business Intelligence (BI)

Execution Steps (XSteps) and process messages

Plant data collection (PP-PDC) interface

Question: Score 1 of 1

How can you convert planned orders into production orders in an SAP ECC system?
There are 3 correct answers to this question.

Response:
Use the order progress report.

Set the conversion indicator in Customizing for the planned order.

Use mass processing.

Automatically, in the planning run (MRP)

Use background processing.

Question: Score 1 of 1

Which SAP NetWeaver component realizes cross-system application processes?


Please choose the correct answer.

Response:

SAP Enterprise Portal (SAP EP)

SAP Business Warehouse (SAP BW)

SAP Exchange Infrastructure (SAP XI) / SAP Process Integration (SAP PI)

SAP Master Data Management (SAP MDM)

Question: Score 1 of 1

You are using MRP controllers in an SAP ECC system. Which of the following statements concerning MRP
controllers are correct?
There are 2 correct answers to this question.

Response:

An employee responsible for the planning of materials can be assigned to multiple MRP controllers.

The MRP controller is maintained in production versions.

In multilevel single-item planning, materials are selected using the MRP controller.

The MRP controller is a central selection criterion for evaluating material requirements planning.

Question: Score 1 of 1

What repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and thus
generate Run Schedule Quantities (RSQ) from normal planned orders?
There are 3 correct answers to this question.

Response:

Using a planning algorithm from capacity planning.

Automatic selection of the production version by applying quota arrangement records in material requirements planning
(MRP).

Automatic selection of the production version in material requirements planning (MRP) using Selection Methods setting.

Selecting a suitable repetitive manufacturing profile that contains an option for automatic line selection.
Manual assignment of planned production quantities in a planning table.

Question: Score 1 of 1

Where are the standard operation times for an operation defined?


Please choose the correct answer.

Response:

Material Master

Routing

Work Center

Production Resource/Tool (PRT)

Question: Score 1 of 1

In SAP ECC, you want to map an in-house production process for general warehouse production.

The fields in the area of the lot size-dependent in-house production time are to be populated when the material
master for the final product is created.

These fields can be maintained by updating from the scheduling result for the associated routing. You now think
that there could be significant changes to the production times in the routing and decide against updating the
material master.

What problem could this lead to?


Please choose the correct answer.

Response:

In the course of basic dates scheduling with requirements planning, dependent requirements request the components
from the bill of materials at the wrong times.

Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.

Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest),
cannot take place on the basis of incorrect basic dates.

Requirements planning runs up against an exception message in basic dates scheduling because the material master
parameters do not match the scheduling result from the routing.

Question: Score 1 of 1

Which of the following master data do you always have to make available for material replenishment using the
KANBAN procedure?
There are 2 correct answers to this question.

Response:

Product cost collector

Control cycles

Production versions

Rate routings

Production supply areas


Question: Score 1 of 1

Which one of the following scheduling types cannot be assigned as default to an order type (production order)?
Please choose the correct answer.

Response:

Midpoint

Only capacity requirements

Backward

Forward

Question: Score 1 of 1

Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the
goods receipt?
Please choose the correct answer.

Response:

Set Container in transport

Set Container full

Set Container empty

Set Container in process

Question: Score 1 of 1

Which of the following elements do you have to prepare for costing of a production order to function without
errors?
There are 3 correct answers to this question.

Response:

Assign costing variants to order type.

Use an operation control key with the indicator costing-relevant.

Enter formulas for costing in the work center.

Assign a production scheduling profile to the material master (product).

Propose a standard text key in work center.

Question: Score 1 of 1

Which activities lead to a reduction of the capacity requirements for an operation?


There are 3 correct answers to this question.

Response:
Confirming the operation

Setting the status technically complete (TECO)

Reducing the order quantity

Rescheduling the operation

Posting the goods receipt for the production order

Question: Score 1 of 1

What are characteristics of repetitive manufacturing?


There are 3 correct answers to this question.

Response:

Shop fabrication

Period-based planning of the quantities to be produced

Production without using production orders and without status management

Automatic line loading based on capacity limits across all production lines

Continuous material consumption, production flow and output

Question: Score 1 of 1

You enter a new BOM (Bill of Materials) in SAP ECC but forget to enter a plant reference. Which of the following
statements describes what happens when you try to save it?

Please choose the correct answer.

Response:

When saving the BOM, a dialog box appears prompting the user to enter a plant.

When saving the BOM, a group BOM is created which can, under certain conditions, be assigned to a plant later.

When saving the BOM, a warning message appears. In the corresponding dialog box, it is possible to create a plant-
specific engineering BOM.

When saving the BOM, an error message appears stating that it is not possible to save a BOM without a plant reference.

Question: Score 1 of 1

Which objects can affect the calculation of capacity requirements for an operation?
There are 3 correct answers to this question.

Response:

Operation control key (routing)

Formulas (work center)

Standard values (routing)


In-house production time (material master)

Transport time (routing)

Question: Score 1 of 1

Which of the following elements can be used in a process order?


There are 3 correct answers to this question.

Response:

Phases

Process instructions

Relationships

Parallel sequences

Suboperations

Question: Score 1 of 1

What happens when a repetitive manufacturing planned order is assigned to a production line in the planning
table?
There are 2 correct answers to this question.

Response:

The planned order type changes.

The planned order is converted to a production order.

The system status of the planned order changes.

The planned order generates capacity requirements.

Question: Score 1 of 1

Which statements about the reorganization of planned independent requirements in SAP ECC are true?
There are 2 correct answers to this question.

Response:

The reorganization is a form of demand adjustment in which non-settled planned independent requirements for the
planning are set to inactive but are not deleted.

The reorganization only affects planned independent requirements that lie on a time axis to the past from a specified key
date.

The reorganization can be parameterized using a plant-specific reorganization interval.

The reorganization only deletes planned independent requirements that have no fixed planned orders to them.

Question: Score 1 of 1

Which types of objects can be changed with Engineering Change Management (ECM)?
There are 3 correct answers to this question.

Response:

Task list

Production version

Bill of material

Work center

Material master

Question: Score 1 of 1

An enterprise wants to absorb the uncertainty caused by fluctuating demand for a finished product by means of a
buffer variable in SAP ECC. They suggest a dynamic safety stock.

What specifications are used to calculate the dynamic safety stock?


Please choose the correct answer.

Response:

The static safety stock per day and the safety time

The average daily demand and the desired days supply

The average daily demand and the safety time

The static safety stock and a material forecast