Professional Documents
Culture Documents
Bapa Resolution 2023
Bapa Resolution 2023
RESOLUTION NO. __
Series 2023
WHEREAS, The KC-NCDDP AF through DSWD engage with the Municipal Local
Government Unit of Ipil addressing the negative conditions of the Municipality.
WHEREAS, the body approve and allow the DSWD KC-NCDDP AF PHASE 2 to construct
within 100 square meter lot area owned by the Barangay Local Government Unit of Tomitom.
WHEREAS, part of the requirements of the proposal is to provide an area/location for sub-
project.
NOW THEREFORE; after due deliberation and on motion of Hon. Marites B. Anoy and
unanimously seconded it was,
RESOLVED, as it is hereby resolved, to provide the area containing 100 square meters as sub
project site.
RESOLVED, it is hereby resolved a resolution allowing to install the 1 unit comfort room,
within the lot no.10204, pis-248 area owned by the barangay local government unit of barangay
tomitom, a kc-ncddp af proposed sub project.
Prepared by: