Professional Documents
Culture Documents
Aip - Bes - 2022 4 Print New
Aip - Bes - 2022 4 Print New
Department of Education
Region IX, Zamboanga Peninsula
Schools Division of Zamboanga del Sur
Quarter 1 Quarter 2
Project Project/ Performance Person(s) Budget per Budget
Program Title Jan Feb Mar Sub-Total Apr May Jun Sub-Total
Objective/s Activities Indicator Responsible Activity Source
Target Amount Target Amount Target Amount Target Amount Target Amount Target Amount Target Amount Target
ACCESS AND QUALITY
IO1: Learners are in school and learning centers
Name of Project: #NAME?
Others 0 0.00 0
Sub-Total #NAME? 4 200.00 106 #NAME? 4 200.00 114 #NAME? 5 #NAME? 1 #NAME? 1 #NAME? 7
ACCESS AND QUALITY
IO2: Learners access programs responsive to their ne
#NAME?
Name of Project: #NAME?
MOOE 5 #NAME? 5 #NAME? 0
Increase the
PTA 0 0.00 0
number of a. Conduct reading No. of
DepED Priorit activities and other SH, Reading BLGU 0 0.00 0
Independent reading related independent
Coordinator
#NAME?
readers. MLGU 0 0.00 0
readers. activities. School Canteen 0 0.00 0
Others 0 0.00 0
c. 0.00 Others 0 0.00 0
Sub-Total #NAME? 0 0.00 5 #NAME? 0 0.00 5 #NAME? 0 0.00 0 0.00 0 0.00 0
ACCESS AND QUALITY
IO3: Learners enjoy learner-friendly environment
Name of Project: Powerlink Rehab
MOOE 0 0.00 17 3,400.00 17
Repair of PTA 0 0.00 0
a. Rehabilitation No. of electrical SH, SDRMM,
electrical BLGU 0 0.00 0
of electrical connections Propety #NAME?
connections rehabilitated. Custodian
MLGU 0 0.00 0
connections.
of School Canteen 0 0.00 0
Repair and
classrooms, Others 0 0.00 0
Maintenance
chalkboards MOOE 0 0.00 0
, and PTA 0 0.00 0
b. Conduct repair No. of SH, SDRMM,
classroom BLGU 0 0.00 0
of classroom classroom Propety #NAME?
doors. doors doors repaired. Custodian
MLGU 0 0.00 0
School Canteen 0 0.00 0
Others 0 0.00 0
Sub-Total #NAME? 0 0.00 0 0.00 0 0.00 0 0.00 17 3,400.00 0 0.00 0 0.00 17
IO3: Learners enjoy learner-friendly environment
Repair and
Name of Project: Repainting of Walls and Ceiling
Maintenance SH, MOOE 1 #NAME? 1 #NAME? 2 #NAME? #NAME? 0
Repainted Property
No. of PTA 0 0.00 0
(Repainting Classroom a. Repaint Custodian,
Classrooms/S BLGU 0 0.00 0
of walls and Classroom walls Brigada #NAME?
chool Building MLGU 45,000.00 0 45,000.00 0
Classroom ceiling and ceiling Eskwela
Repainted School Canteen 0 0.00 0
Walls and Coordinato
r Others 0 0.00 0
Ceiling)
Sub-Total #NAME? 1 #NAME? 1 #NAME? 0 ### 2 #NAME? 0 0.00 0 0.00 0 #NAME? 0
IO3: Learners enjoy learner-friendly environment
Repair and Name of Project: Waterlink Rehab
Maintenance Repair SH, MOOE 1 #NAME? 1 #NAME? 2 #NAME? 0
No. of Property
Washstands PTA 0 0.00 0
a. Conduct rehab washstand Custodian,
(Washstand and replace BLGU 0 0.00 0
of washstand and repaired and Brigada #NAME?
and Water leaking MLGU 0 0.00 0
leaking pipelines pileliens Eskwela
Connections pipelines replaced Coordinato
School Canteen 0 0.00 0
) r
Maintenance Repair SH,
No. of Property
Washstands
a. Conduct rehab washstand Custodian,
(Washstand and replace
of washstand and repaired and Brigada #NAME?
and Water leaking
leaking pipelines pileliens Eskwela
Connections pipelines replaced Coordinato
) r Others 0 0.00 0
Sub-Total #NAME? 1 #NAME? 1 #NAME? 0 0.00 2 #NAME? 0 0.00 0 0.00 0 0.00 0
ACCESS AND QUALITY
Improve
IO5: Learners attain the
learning standards
availability Name of Project: Teachers Supplies
of MOOE 0 0.00 #NAME? #NAME? 0
alternative SH, Project PTA 0 0.00 0
Team,
self learning No. of SLAC BLGU 0 0.00 0
a. Conduct SLAC SLAC #NAME?
modules; conducted. MLGU 0 0.00 0
Coordinato
Attainment Developmen r
School Canteen 0 0.00 0
of Learning t of home Others 2 600.00 2 600.00 2 600.00 6 1,800.00 2 600.00 2 600.00 2 600.00 6
Standards' learning b. Provide No. of teachers MOOE #NAME? #NAME? 45 #NAME? 45 #NAME? 1 #NAME? 50 #NAME? 51
materials and received materials
guide; and equipments PTA 0 0.00 0
equipments used and students
Evaluation/ SH, Subject BLGU 0 0.00 0
for production, received the #NAME?
Testing/Ass reproduction and SLMs/Testing/ Teachers MLGU 0 0.00 0
essment distribution of
Assessment School Canteen 0 0.00 0
Materials/Workshe
Materials/ ALM's ets.
Others 0 0.00 0
Worksheets Sub-Total #NAME? 2 #NAME? 2 #NAME? 47 #NAME? 51 #NAME? 2 600.00 3 #NAME? 52 #NAME? 57
ACCESS AND QUALITY
IO6: Learners are well-rounded, happy and smart
Name of Project: #NAME?
EVA MARIA S. ROSLINDA PEACHY SHANE D. CARANDANG ERNESTO F. TARDO, EdD RAYMOND M. SALVADOR, Ed.D, CESE
Elementary School Principal II Accountant III Chief CES, SGOD OIC-Office of Assistant Schools Division Superinten
Date: ___________________________ Date:________________________________ Date: Date:
Quarter 3 Quarter 4
Grand Total for the
Sub-Total Jul Aug Sep Sub-Total Oct Nov Dec Sub-Total Year
Amount Target Amount Target Amount Target Amount Target Amount Target Amount Target Amount Target Amount Target Amount Target Amount
Quarter 3 Quarter 4
Jul Aug Sep Oct Nov Dec
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4,000.00 0.00 400.00 0.00 1,000.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
600.00 600.00 800.00 600.00 1,000.00 600.00
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Quarter 1
Project/ Performance Person(s) Budget per
Program Title Project Objective/s Budget Source Jan Feb Mar Sub-Total
Activities Indicator Responsible Activity
Target Amount Target Amount Target Amount Target
ACCESS AND QUALITY
IO1: Learners are in school and learning centers
Name of Project: PALISTA NA!
MOOE - 20 3,600.00 - 20
PTA 0
a.Oplan Palista
Early Registration Increase enrollment Enrollment BLGU 0
Actvocacy No. of enrollees 6,450.00
Committee MLGU 0
School Canteen 0
Others 0
Name of Project: Powerlink Rehab
MOOE - 71 5,100.00 - 71
PTA 0
a. Conduct reading
No. of independent SH, Reading BLGU 0
activities and other 8,780.00
readers. Coordinator MLGU 0
reading related activities.
School Canteen 0
Increase the number Others 0
DepED Priorities of Independent Name of Project: MMK (Malipayong Makasabot sa Klase) MOOE 0
readers. PTA 0
BLGU 0
a. Conduct reading No. of independent SH, Reading 4,190.00 MLGU 0
activities and other
reading related activities. readers. Coordinator
School Canteen 0
Others 0
Sub-Total 19,420.00 0 0.00 91 8,700.00 0 0.00 91
IO2: Learners access programs responsive to their needs and consistent with their interests and aptitudes
Name of Project: WINS
MOOE 0
a. Provide materials SH, WINS PTA 0
related to WINS program No. of learners Coordinator, BLGU 0
and provide to the provided sets of School Health & 18,870.00
MLGU 0
learners sets of WINS supplies Nutirtion
related supplies. School Canteen 0
Coordinator
Others 0
Name of Project: COVID & SANITATION ESSENTIALS MOOE - 1,300.00 - 0
Enforce implementation
of the following: WINS, PTA 0
OK sa DepEd NDEP, Medical, Dental, BLGU 0
28,420.00
Health Essentials and MLGU 0
Nursing Services. School Canteen 0
Others 0
Name of Project: Waste Management and Ground Mainten MOOE 4,050.00 - - 0
PTA 0
BLGU 0
30,360.00
MLGU 0
School Canteen 0
Others 0
Sub-Total 77,650.00 0 4,050.00 0 1,300.00 0 0.00 0
Others 0
MOOE 0
PTA 0
BLGU 0
c. 0.00
MLGU 0
School Canteen 0
Others 0
Sub-Total 59,775.00 0 0.00 0 0.00 0 0.00 0
27,990.00 9,000.00 9,990.00 9,990.00 0 28,980.00 9,990.00 9,990.00 9,990.00 0 29,970.00 9,990.00 11,490.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
14,960.00 - - 111 23,100.00 100 14,990.00 211 38,090.00 - - 17 3,525.00 38 20,500.00 55 24,025.00 - - 24 4,630.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 - 9,965.0 0 9,965.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
0.00 0 0.00 0 0.00
42,950.00 0 9,000.00 111 33,090.00 100 24,980.00 211 67,070.00 0 9,990.00 17 23,480.00 38 30,490.00 55 63,960.00 0 9,990.00 24 16,120.00
PEACHY SHANE D. CARANDANG ERNESTO F. TARDO, EdD DR. RAYMOND M. SALVADOR, CESE
Accountant III Chief EPS, SGOD OIC-Assistant Schools Division Superintendent
Quarter 4
Grand Total for the Year
Dec Sub-Total
Target Amount Target Amount Target Amount
- 0 0.00 44 6,450.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
- 0 3,460.00 0 18,870.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
2,410.00 0 6,760.00 1 28,420.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 30,360.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 2,410.00 0 10,220.00 1 77,650.00
er 4
Dec
19,000.00
0.00
0.00
0.00
0.00
0.00
19,000.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00
0 0.00 0 0.00 0 0.00
SALVADOR, CESE
Division Superintendent
Name of School: BEGONG ELEMENTARY SCHOOL
Address of School: Begong, Tigbao, Zamboanga del Sur
Instruction: Fill in only the cells with no color fill in this template.
Objectively
Date of Person(s) Physical Financial Accomplishments/ Issues/ Problems/ Recommendations/ Signature of SPT and
PROJECT TITLE Project Objectives Activities Verifiable Budget Source % of % of
Monitoring Responsible Target Actual Target Actual Status to Date Challenges Action Points Project Team Leader
Indicators Accomp. Accomp.
ACCESS AND QUALITY
IO1: Learners are in school and learning centers
MOOE 44 44 100.00 6,450.00 6,450.00 100.00 The project was The implementation of Liquidation documents
PTA 0 #DIV/0! 0.00 #DIV/0! accomplished and the project is delayed must be prepared ahead
a.Oplan Palista BLGU 0 #DIV/0! 0.00 #DIV/0! implemented. due to descrepancies of the schedule.
September to Enrollment No. of
OPLAN PALISTA Actvocacy documents of previous
October 2021 Committee enrollees MLGU 0 #DIV/0! 0.00 #DIV/0!
liquidation.
School Canteen 0 #DIV/0! 0.00 #DIV/0!
Others 0 #DIV/0! 0.00 #DIV/0!
MOOE 145 145 100.00 8,780.00 8,780.00 100.00 The project was The project team were Planning must be done
PTA 0 #DIV/0! 0.00 #DIV/0! accomplished and not able to deliver the to address the problem.
LDR (Learners No. of BLGU 0 #DIV/0! 0.00 #DIV/0! implemented. supplies to the
September to SH, Reading
Documents Increase enrollment document recipients due to high
Reproduction March 2021 Coordinator MLGU 0 #DIV/0! 0.00 #DIV/0!
reproduced risk restriction status in
Conduct reading School Canteen 0 #DIV/0! 0.00 #DIV/0!
the locality.
activities and other Others 0 #DIV/0! 0.00 #DIV/0!
reading related MOOE 38 38 100.00 4,190.00 4,190.00 100.00 The project was Most of the supplies Planning must be done
activities. PTA 0 #DIV/0! 0.00 #DIV/0! accomplished and were not be given to the to address the problem.
No. of
BLGU 0 #DIV/0! 0.00 #DIV/0! implemented. recipients due risk to
MMK (Malipayong September to Identified
Project Team covid-19 pandemic
Makasabot sa Klase) March 2021 struggling MLGU 0 #DIV/0! 0.00 #DIV/0!
pupils School Canteen 0 #DIV/0! 0.00 #DIV/0!
Others 0 #DIV/0! 0.00 #DIV/0!
MOOE 25 25 100.00 12,230.00 12,230.00 100.00 The project was Prices in the market is Estimated price should
a. Repair of electrical PTA 0 #DIV/0! 0.00 #DIV/0! accomplished and almost double be projected.
No. of
a. Rehabilitation of connections of SH, SDRMM, BLGU 0 #DIV/0! 0.00 #DIV/0! implemented. compared against the
electrical
Powerlink Rehab electrical classrooms, October 2021 Propety prices in the sob.
connections MLGU 0 #DIV/0! 0.00 #DIV/0!
connections. chalkboards, and Custodian
rehabilitated. School Canteen 0 #DIV/0! 0.00 #DIV/0!
classroom doors.
Others 0 #DIV/0! 0.00 #DIV/0!
MOOE 5 0 0.00 49,810.00 0.00 0.00 The project failured and This project is realigned Building identified to be
PTA 0 #DIV/0! 0.00 #DIV/0! realigned to health into teachers supplies repainted is subject for
Repainted No. of supplies due to the as per demand for the minor repair.
Repainting of Walls Repaint walls and BLGU 0 #DIV/0! 0.00 #DIV/0!
Classroom walls and October 2021 Project Team classroom unavailibilty of skilled reproduction of
and Ceiling ceiling. MLGU 0 #DIV/0! 0.00 #DIV/0!
ceiling walls repainted workers as affected by worksheets and lacking
School Canteen 0 #DIV/0! 0.00 #DIV/0! the covid 19 pandemic. modules.
Others 0 #DIV/0! 0.00 #DIV/0!
MOOE 125 125 100.00 19,810.00 19,810.00 100.00 The project was Teachers were so happy It must be continued
Improve the availability of PTA 0 #DIV/0! 0.00 #DIV/0! accomplished and ang gay as they received and most probably
alternative self learning
implemented. the most essential allocation must be
modules; Development of Procure teachers September to No. of supplies BLGU 0 #DIV/0! 0.00 #DIV/0!
Teachers' Supplies home learning guide; Project Team supplies for their daily higher than previous
Evaluation/Testing/Assess supplies March 2021 procured. MLGU 0 #DIV/0! 0.00 #DIV/0!
ment Materials/ undertaking in the year.
Worksheets School Canteen 0 #DIV/0! 0.00 #DIV/0!
school.
Others 0 #DIV/0! 0.00 #DIV/0!
ACCESS AND QUALITY
IO2: Learners access programs responsive to their needs and consistent with their interests and aptitudes
MOOE 25 25 100.00 18,870.00 18,870.00 100.00 The project was Essential supplies for Parents or guardian
a. Provide materials
SH, WINS PTA 0 #DIV/0! 0.00 #DIV/0! accomplished and sanitary hygene of must be tapped to
related to WINS
Coordinator, No. of learners BLGU 0 #DIV/0! 0.00 #DIV/0! implemented. pupils and teachers is all address the problem.
program and provide
WINS May 2021 School Health provided sets procured and
Enforce to the learners sets MLGU 0 #DIV/0! 0.00 #DIV/0!
& Nutirtion of supplies distributed. Pupils did
implementation of of WINS related School Canteen 0 #DIV/0! 0.00 #DIV/0!
Coordinator not received due to no
the following: WINS, supplies. Others 0 #DIV/0! 0.00 #DIV/0! face to face classes.
NDEP, Medical,
MOOE 240 350 145.83 28,420.00 41,445.83 145.83 The accomplishment is Delivery of materials is Procurement process
Dental, Health
more than 100% as not on time as must be conducted
Essentials and No. of health PTA 0 #DIV/0! 0.00 #DIV/0!
COVID AND budgeted due to scheduled. ahead of time.
Nursing Services. Provide medical September to essential BLGU 0 #DIV/0! 0.00 #DIV/0!
SANITATION Project Team additional funding from
ESSENTIALS health assistance March 2021 supplies
realigned projects.
procured.
Enforce
implementation of
the following: WINS,
NDEP, Medical,
The accomplishment is Delivery of materials is Procurement process
Dental, Health
more than 100% as not on time as must be conducted
Essentials and No. of health
COVID AND budgeted due to scheduled. ahead of time.
Nursing Services. Provide medical September to essential
SANITATION Project Team additional funding from
ESSENTIALS health assistance March 2021 supplies MLGU 0 #DIV/0! 0.00 #DIV/0!
realigned projects.
procured. School Canteen 0 #DIV/0! 0.00 #DIV/0!
Others 0 #DIV/0! 0.00 #DIV/0!
MOOE 15 15 100.00 30,360.00 30,360.00 100.00 The project was Delivery of materials is Procurement process
PTA 0 #DIV/0! 0.00 #DIV/0! accomplished and not on time as must be conducted
WASTE
Institutionalize implemented. scheduled. ahead of time.
MANAGEMENT AND Cleaning of School Cleanliness of BLGU 0 #DIV/0! 0.00 #DIV/0!
regular conduct of May 2021 Project Team
GROUND Ground. school ground MLGU 0 #DIV/0! 0.00 #DIV/0!
SDRRM.
MAINTENANCE
School Canteen 0 #DIV/0! 0.00 #DIV/0!
Others 0 #DIV/0! 0.00 #DIV/0!
MOOE 12 12 100.00 118,410.00 118,410.00 100.00 The project was Delivery of materials are Procurement process
accomplished and not on time as must be conducted
No. of months PTA #DIV/0! 0.00 #DIV/0!
implemented. scheduled. ahead of time.
January to
b. Provide payment SH,Project paid to BLGU #DIV/0! 0.00 #DIV/0!
UTILITIES December
of electric bills Team ZAMSURECO I MLGU 0 #DIV/0! 0.00 #DIV/0!
2021
Ensure smooth COOP.
School Canteen 0 #DIV/0! 0.00 #DIV/0!
operations in the
Others 0 #DIV/0! 0.00 #DIV/0!
school and other
different transactions MOOE 348 348 100.00 81,705.00 81,705.00 100.00 100% completed and Delivery of materials are Procurement process
in school. PTA 0 #DIV/0! 0.00 #DIV/0! accomplished. not on time as must be conducted
scheduled. ahead of time.
OFFICE AND Provide office and November no. of supplies BLGU 0 #DIV/0! 0.00 #DIV/0!
Project Team
OTHER SUPPLIES other supplies 2021 procured MLGU 0 #DIV/0! 0.00 #DIV/0!
School Canteen 0 #DIV/0! 0.00 #DIV/0!
Others 0 #DIV/0! 0.00 #DIV/0!
MOOE 15 12 80.00 9,965.00 7,972.00 80.00 The project was partially Some materials of the This project will be
PTA 0 #DIV/0! 0.00 #DIV/0! accomplished due to its project were not realized implemented in the next
realignment. All and realigned to other AIP.
BLGU 0 #DIV/0! 0.00 #DIV/0!
WASH STAND Rehabilitation of Repair existing wash September Rehabilitated materials billed were project
Project Team
REPAIR Wash Stand stand 2021 Wash Stand MLGU 0 #DIV/0! 0.00 #DIV/0!
procured.
School Canteen 0 #DIV/0! 0.00 #DIV/0!
Quarter 1
Project/ Performance Person(s) Budget per
Program Title Project Objective/s Budget Source Jan Feb Mar
Activities Indicator Responsible Activity
Target Amount Target Amount Target
ACCESS AND QUALITY
PTA
Dropout Reduction Decrease dropout rate
Provide set of school supplies to No. of supplies SH, Advisers, 40,800.00 BLGU
Program from 2% to 0.
learners procured. Teachers MLGU
School Canteen
Others
Name of Project: COOL KA LANG MOOE
ZDS_SGOD_SMME_AJSA2022
Quarter 1
Summary on Budget of Activities by Funding Source
Note: Jan Feb Mar
Target - refers to the MOOE 408,000.00 15,000.00 15,000.00 15,000.00
Physical Target PTA 400.00 400.00 0.00 0.00
BLGU 500.00 500.00 0.00 0.00
MLGU 400.00 400.00 0.00 0.00
Amount - refers to the School Canteen 0.00 0.00 0.00 0.00
Financial Target Others 0.00 0.00 0.00 0.00
Grand Total 409,300.00 16,300.00 15,000.00 15,000.00
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 - 578 15,400.00 - 578 15,400.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
300.00 32 300.00 28 4,860.00 1,350 44,000.00 33 600.00 1,411 49,460.00 0 0.00 68 5,360.00 61 1,910.00 129
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
300.00 32 300.00 28 4,860.00 1,350 44,000.00 33 600.00 1,411 49,460.00 0 0.00 68 5,360.00 61 1,910.00 129
- 0 0.00 - - 100 12,800.00 - - 100 12,800.00 194 26,300.00 193 21,980.00 - 50.00 387
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
-
0 0.00 - - 39 10,280.00 - - 39 10,280.00 106 7,730.00 1 350.00 - 107
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 139 23,080.00 0 0.00 139 23,080.00 300 34,030.00 194 22,330.00 0 50.00 494
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 139 23,080.00 0 0.00 139 23,080.00 300 34,030.00 194 22,330.00 0 50.00 494
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
0 0.00 0 0.00 0
8,000.00 12 24,000.00 4 8,000.00 4 8,000.00 4 8,000.00 12 24,000.00 4 8,000.00 4 8,000.00 4 8,000.00 12
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
8,000.00 12 24,000.00 4 8,000.00 4 8,000.00 4 8,000.00 12 24,000.00 4 8,000.00 4 8,000.00 4 8,000.00 12
Quarter 2 Quarter 3
Mar Apr May Jun Jul Aug Sep
15,000.00 100,000.00 100,000.00 13,000.00 50,000.00 48,000.00 13,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
15,000.00 100,000.00 100,000.00 13,000.00 50,000.00 48,000.00 13,000.00
PEACHY SHANE D. CARANDANG ERNESTO F. TARDO, EdD DR. RAYMOND M. SALVADOR, CESE
Accountant III Chief EPS, SGOD OIC-Assistant Schools Division Superintendent
Quarter 4
Grand Total for the Year
Sub-Total Oct Nov Dec Sub-Total
Amount Target Amount Target Amount Target Amount Target Amount Target Amount
Quarter 4
Oct Nov Dec
13,000.00 13,000.00 13,000.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
13,000.00 13,000.00 13,000.00
-
10 WIN NA WIN 8,160.00 8,160.00
1 Liquid Soap Liter 100.00 20 2,000.00 - - - - - 20
2 Detergent Soap powdozen 85.00 20 1,700.00 - - - - - 20
3 Bleaching Agent liter 50.00 20 1,000.00 - - - - - 20
4 Bath Soap piece 25.00 20 500.00 - - - - - 20
5 Toothpaste 75ml tube 60.00 26 1,560.00 - - - - - 26
6 Alcohol galon 700.00 2 1,400.00 - - - - 2
Sub Total 8,160.00 - - - - - 108
-
10 LIFEGUARD 12,240.00 12,240.00
1 Povidone 100ml piece 250.00 3 750.00 - - - - 3 750.00
2 Cotton pack 80.00 1 80.00 - - - - 1 80.00
3 Sinages 4x5 ft. piece 500.00 2 1,000.00 - - - - 2 1,000.00
4 Megaphone piece 3,600.00 1 3,600.00 - - - - 1 3,600.00
5 Bandages pack 120.00 5 600.00 - - - - 5 600.00
6 Gauze pack 120.00 5 600.00 - - - - 5 600.00
7 Blood Pressure metpiece 1,610.00 1 1,610.00 - - - - 1 1,610.00 1
8 Antibiotic Tablet box 500.00 8 4,000.00 - - - - 8 4,000.00
Sub Total 12,240.00 - 12,240.00 1
-
-
16 FEDILITY BOND 2,040.00 2,040.00
Fedility Bond piece 2,040 1 2,040.00 - - - - -
Grand Total 408,000.00 - ### 15,000.00 ### 15,000.00 ### 15,000.00 ### 100,000.0 ###
Prepared by:
PAULA MARGARET A. PANTACAN
School Property Custodian:
EVA MARIA S. ROSLINDA 18.00
School Principal 162.00
nagement Plan (PPMP)
- - - - - - - -
100,000.0 72 13,000.00 ### 50,000.00 403 48,000.00 98 13,000.00 ### 13,000.00 61 13,000.00 ### 13,000.00
May Jun. Jul. Aug. Sept. Oct. Nov. Dec.
100,000.00 Qty. 13,000.00 Qty. 50,000.00 Qty. 48,000.00 Qty. 13,000.00 Qty. 13,000.00 Qty. 13,000.00 Qty. 13,000.00
- - - 2 1,000.00 - - - -
- - - 3 630.00 - - - -
- - - 3 660.00 - - - -
- - - 2 700.00 - - - -
- - - 2 700.00 - - - -
- - - 1 350.00 - - - -
- - 1 350.00 - - - -
- - 2 10.00 - - - -
- - 40 600.00 - - - -
- - - 56 5,000.00 - - - -
3,450.00 20 300.00 - - - - - -
4,350.00 10 150.00 - - - - - -
3,780.00 - - - 3 630.00 2 420.00 6 1,260.00 -
6,160.00 - - - 2 440.00 2 440.00 - -
4,860.00 - - - - - - -
810.00 - - - - - - -
2,160.00 - - - - - - -
1,305.00 - - - 56 840.00 - 3 45.00 4 60.00
1,560.00 1 130.00 - 2 260.00 - - 1 130.00 -
100.00 2 20.00 - 10 100.00 - 5 50.00 10 100.00 68 680.00
65.00 - - 2 10.00 57 285.00 138 690.00
28,600 33 600.00 34,060 - - 12 360 61 1,910 2,270 11 920 20 1,820 210 1,430
1,400.00 - - - - - - - -
1,400.00 - - - - - - - -
1,400.00 - - - - - - - -
1,400.00 - - - - - - - -
1,000.00 - - - - - - - -
1,500.00 - - - - - - - -
1,500.00 - - - - - - -
750.00 - - - - - - -
290.00 - - - - - - -
1,470.00 - - - - - - -
1,540.00 - - - - - - -
700.00 - - - - - - -
350.00 - - - - - - -
350.00 - - - - - - -
350.00 - - - - - - -
15,400.00 - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 20 1,200.00 - 20 1,200.00 - - - - -
- 1 200.00 - 1 200.00 - - - 1 200.00
- 1 300.00 - 1 300.00 - - - 1 300.00
- 3 1,500.00 - 3 1,500.00 - - - 3 1,500.00
- 25 3,200.00 - - 25 3,200.00 - - - - - 5.00 2,000.00
2,000.00 - - - - - - -
1,700.00 - - - - - - -
1,000.00 - - - - - - -
500.00 - - - - - - -
1,560.00 - - - - - - -
1,400.00 - - - - - - -
8,160.00 - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - -
- - - - - - - -
-
- - - -
2,520.00 - - - - - - -
2,860.00 - - - - - - -
2,100.00 - - - - - - -
1,750.00 - - - - - - -
1,050.00 - 2 700.00 - - - - -
- - 3 1,050.00 1 350.00 - - - -
- - 100 2,500.00 - - - - -
- - 1 3,480.00 - - - - -
10,280.00 - - 106 7,730.00 1 350.00 - - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - - - - - - - -
- - - - - 1 2,040.00 - -
### ### 13,000.00 ### 50,000.00 ### 48,000.00 ### 13,000.00 ### 13,000.00 ### 13,000.00 ### 13,000.00
#REF!
- -
- 408,000.00
TOTAL
408,000.00
-
1,000.00
630.00
660.00
700.00
700.00
350.00
350.00
10.00
600.00
5,000.00
-
-
3,750.00
4,500.00
8,400.00
9,240.00
4,860.00
810.00
2,250.00
2,250.00
2,600.00
1,090.00
1,050.00
4,170 40,800.00
-
-
1,400.00
1,400.00
1,400.00
1,400.00
1,000.00
1,500.00
1,500.00
750.00
290.00
1,470.00
1,540.00
700.00
350.00
350.00
350.00
15,400.00
-
-
2,500.00
1,250.00
150.00
200.00
1,000.00
200.00
200.00
2,500.00
2,000.00
10,000.00
-
4,200.00
3,900.00
4,500.00
3,000.00
2,000.00
1,600.00
800.00
20,000.00
-
-
5,000.00
3,000.00
4,200.00
200.00
700.00
520.00
240.00
240.00
3,500.00
2,400.00
20,000.00
-
-
3,000.00
2,600.00
3,000.00
1,500.00
1,600.00
1,200.00
700.00
160.00
240.00
1,000.00
500.00
2,500.00
2,000.00
20,000.00
-
-
3,600.00
800.00
1,200.00
6,000.00
- 11,600.00
-
-
2,000.00
1,700.00
1,000.00
500.00
1,560.00
1,400.00
8,160.00
-
-
750.00
80.00
1,000.00
3,600.00
600.00
600.00
1,610.00
4,000.00
12,240.00
-
14,000.00
6,300.00
1,280.00
9,520.00
5,700.00
1,700.00
2,300.00
40,800.00
-
36,000.00
48,000.00
12,000.00
3,600.00
2,400.00
102,000.00
-
-
16,800.00
17,600.00
5,600.00
5,250.00
5,250.00
5,250.00
2,500.00
1,200.00
1,400.00
350.00
61,200.00
-
-
2,520.00
2,860.00
2,100.00
1,750.00
1,750.00
1,400.00
2,500.00
3,480.00
- 18,360.00
3,000.00
6,000.00
4,000.00
2,520.00
2,640.00
1,015.00
1,185.00
40.00
- 20,400.00
2,040.00
- 408,000.00
### 1 REPAIR AND MAINTENANCE
1 1. BALIK ESKWELA 5,000.00 2 UTILITIES
2 2. SAGOT KITA 40,800.00 3 COVID
3 3. COOL KA LANG 15,400.00 4 GAD
4 4. I GOT YOU 10,000.00 5 WINS
5 5. ALAM NA THIS CENTER 20,000.00 6 DRRM
6 6. HOME AWAY FROM HOME 20,000.00 7 MODULES
7 7. THIRST NO MORE 20,000.00 8 TEACHER AND OFFICE SUPPL
8 8. PASYALAN 11,600.00 9 TRAININGS/SEMINARS
9 9. GAVE AND TAKE 61,200.00 AWARD AND RECOGNITION
10 10. STOP COVID 40,800.00 FIDELITY BOND
11 11. LIFEGUARD 12,240.00
12 12. a. POWERMAX 12,240.00 1
13 12. b. WATCHMAN 18,360.00 2
14 12. C. MS DATA 20,400.00 3
15 12. D. HELLO THERE 48,000.00 4 UTILITIES
16 12. E.AQUAMAN 36,000.00 5 Secu
17 13. AND TAKE 12,000.00 Elect
18 14. LEVEL UP 2,400.00 Internet
19 15. IBA KA SA LAHAT 3,600.00 Water
20 16. MR. FIDEL 2,040.00 1 Mobile
### 2
3
4 Repair and Maintenance
5 Repair of Office Gutter
Repair of Multipurpose Center
Repair Teacher Center
Wash Stand
Ground Maintenance
1. BALIK ESKWELA
2. SAGOT KITA
3. COOL KA LANG
4. I GOT YOU
5. ALAM NA THIS CENTER
6. HOME AWAY FROM HOME
7. THIRST NO MORE
8. PASYALAN
9. GAVE AND TAKE
10. STOP COVID
11. LIFEGUARD
12. a. POWERMAX
12. b. WATCHMAN
12. C. MS DATA
12. D. HELLO THERE
12. E.AQUAMAN
13. AND TAKE
14. LEVEL UP
15. IBA KA SA LAHAT
16. MR. FEDIL
20%
### 81,600.00
25%
### 102,000.00
10%
### 40,800.00
5%
### 20,400.00
2%
### 8,160.00
3%
### 12,240.00
10%
### 40,800.00
15%
### 61,200.00
4.5%
### 18,360.00
5%
### 20,400.00
0.5%
### 2,040.00
100% 408,000.00
### -
25%### 102,000.00
4000.00
### 48,000.00
3000.00
### 36,000.00 96.00
1000.00
### 12,000.00
200.00
### 2,400.00
300.00
### 3,600.00
### 102,000.00
20%
### 81,600.00
10,000.00
20,000.00
20,000.00
20,000.00
11,600.00
81,600.00
Department of Education
Region IX, Zamboanga Peninsula
Division of Zamboanga del Sur
BEGONG ELEMENTARY SCHOOL
SCHOOL MODIFIED
ID MUNICIPA CURRICUL MOOE (in
TRA NET Jan Feb Mar Subtotal Apr May Jun Subtotal Jul Aug Sep Subtotal Oct Nov Dec Subtotal
(SY 2021- LITY AR pesos)
2022) OFFERING
Prepared by:
INOCENCIO S. CARREON, JR. Noted:
Principal LALAH D. ANGAR
ADAS - III
TOTAL
408
408,000.00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 Oplan Palista Actvocacy 5,000.00
2 LDR (Learners Documents 40,800.00
3 MMK (Malipayong Makasabo 15,400.00
4 Repair of Office Gutter 10,000.00
5 Repair of Multipurpose Cen 20,000.00
6 Repair Teacher Center 20,000.00
7 Wash Stand 20,000.00
8 Waste Management and Gr 11,600.00
9 TEACHERS' SUPPLIES 61,200.00
10 WINS 8,160.00
11 DRRM 12,240.00
12 COVID & SANITATION ES 40,800.00
13 Secu 48,000.00
14 Elect 36,000.00
Internet 12,000.00
Water 2,400.00
Mobile 3,600.00
TRAINING SEMINARS 40,800.00
408,000.00