ZIA PRIMA ENTERPRISE

METHOD STATEMENT – INSTALLATION OF POWER AND LIGHTING SYSTEM


WIRING FOR KUALITI ALAM SDN BHD

JOB TITLE: INSTALLATION OF PUMPING SYSTEM AT VERTICAL RISER

Project Doc. No: ZPE/KA/05/19-044 Rev. No: - Total Page - 3

1. INTRODUCTION AND SCOPE


This method of statement specifies the detailed requirements and procedures for
the installation of Power and Lighting System Wiring.

2. APPLICABLE PROJECT SPECIFICATION


Section: Cables and wiring

Division: Installation

Sub Division: SubdivisionCTRICAL POWER AND LIGHTING IRING

3. LOCATION OF ACTIVITY
Power and lighting system for the pump machine at vertical riser

4. OPERATION

1. Material: Material used will be as approved by the engineer. The sizes and


routes routing will be as per the approved.

2. Storage and Protection: Deliver components parts to site, completely


identified in accordance with shop and certified drawings prepared for this
work. Store in accordance with the manufacturer’s instructions, above ground,
properly protected from the weather and construction activities.

3. Wiring:

1. No wiring be carried out until the appropriate tests required or in the


electrical testing section have been done and the consultant has given
his clearance for wiring to commence.
2. A loop in form of wiring shall be used as far as practicable or unless
otherwise indicated. Joints in conductors shall be made using insulated
terminal blocks complying with requirements of this specification.

3. At expansion joints adequate slack shall be left in the cable.

4. Where conduits are installed for wiring by others, a draw wire shall be


provided between each draw in position.

5. Where three-phase circuits comprising single-core cables are installed


in trunking, all cables of a shall be tied together at intervals not
exceeding 200mm.

6. Cables forming part of alarm, control, communication or monitoring


circuits shall have identification sleeves at their terminations.
Identification shall be consistent with the relevant wiring diagrams.

5. RESPONSIBILITY

1. PROJECT MANAGER
1. To ensure that all the preparation and application works are carried out
according to the Contract Specification and with the approved
drawings.

2. To ensure that the progressing of work is carried out according to the


planned program and as per the approved method of statement.

3. To ensure that all the equipment and materials required to execute the
work are available according to the planned construction program.

4. To co –ordinate with the Main contractor, MEP Coordinator and Safety


Officer, for a safe and proper execution of the works.

2. SITE ENGINEER
1. To ensure that the works are carried out according to the Contract
Specifications, approved method statement and the shop drawings.

2. To provide all necessary information and distribute responsibilities to


his construction team.
3. To monitor the progress of work in relation with the work program and
to report to the Project Manager.

4. To co-ordinate with the safety officer and to ensure that the works are
carried out in safe practising methods.

3. FOREMAN
1. The foreman will carry out his duties by maintaining continuous
coordination with the site engineer on daily basis, and ensure proper
distribution of the workforce in the required and planned locations.

2. To ensure that his assistant foreman/ charge hand are aware of the job
requirements and they have enough information to carry out their duties
properly.

3. To ensure in consultation with the site engineer that the manpower


involved in the works are moving as agreed and planned for the work.

4. To ensure that the daily work is progressing as planned and advise the
site engineer of any requirement for additional resources. To control
disposal of waste materials according to the instructions received from
the site engineer.

5. To ensure full coordination with the safety officer to maintain safe


working and proper house keeping of the site, following the approved
safety measures and further ensure that all his working team are aware
of the same to prevent accident and losses.

6. To inform the site engineer and of the areas ready for inspection.

7. Distribution and the control of material shall be monitored by foreman


and store keeper.

6. EQUIPMENT REQUIREMENTS
The requirements that will be engaged for Power and lighting System Wiring works
will be as follows:

1. Measuring tape
2. Cutting plier
3. Box spanner set
4. Bending spring
5. Pipe Wrench
6. Drilling Machine
7. Crimping tool
8. Screw driver
9. Pulling spring
10. Hammer
11. Common tools

7. HEALTH AND SAFETY


Strictly followed as per the manufacturer’s Health and Safety recommendations for
handling and use of the materials. Ensure all involved personnel shall be aware of the
same.