Electrical & Wiring METHOD STATEMENT
Electrical & Wiring METHOD STATEMENT
Division: Installation
3. LOCATION OF ACTIVITY
Power and lighting system for the pump machine at vertical riser
4. OPERATION
3. Wiring:
5. RESPONSIBILITY
1. PROJECT MANAGER
1. To ensure that all the preparation and application works are carried out
according to the Contract Specification and with the approved
drawings.
3. To ensure that all the equipment and materials required to execute the
work are available according to the planned construction program.
2. SITE ENGINEER
1. To ensure that the works are carried out according to the Contract
Specifications, approved method statement and the shop drawings.
4. To co-ordinate with the safety officer and to ensure that the works are
carried out in safe practising methods.
3. FOREMAN
1. The foreman will carry out his duties by maintaining continuous
coordination with the site engineer on daily basis, and ensure proper
distribution of the workforce in the required and planned locations.
2. To ensure that his assistant foreman/ charge hand are aware of the job
requirements and they have enough information to carry out their duties
properly.
4. To ensure that the daily work is progressing as planned and advise the
site engineer of any requirement for additional resources. To control
disposal of waste materials according to the instructions received from
the site engineer.
6. To inform the site engineer and of the areas ready for inspection.
6. EQUIPMENT REQUIREMENTS
The requirements that will be engaged for Power and lighting System Wiring works
will be as follows:
1. Measuring tape
2. Cutting plier
3. Box spanner set
4. Bending spring
5. Pipe Wrench
6. Drilling Machine
7. Crimping tool
8. Screw driver
9. Pulling spring
10. Hammer
11. Common tools