FINANCIAL PROPOSAL
ITEM DESCRIPTION UNIT QTY
1 Mobilization ‐ Safety, Insurance, Security & Demobilization Lump  1
a. Allow a sum for mobilization, safety, insurance, demobilization during the entire construction period as required by contract.  Contractor shall provide a copy of  Sum
Insurance for the Construction Works and Work Injury Insurance as per WIBA Act of 2007.  This shall be provided to the Arch./COR after Notice to Proceed letter is 
issued and prior to commencement of the Project.   
b.  Provide personal protective equipment (PPE's) and safety mechanisms for electrical, mechanical, & drainage works. 
c.  Appointed Contractor shall be responsible for providing Activity Hazard Analysis for the construction activites including hot works as required. AHA shall be 
reviewed by POSHO prior to commencement of the construction. 
d.Contractor shall provide a construction schedule for review and approval by Architect/COR prior to commencement of work. 
e.Contractor shall have Safety office who will ensure all safety regulations are adhered to during the course of construction  
2 DEMOLITION: Lump  1
Supply all tools,labour and equipment to carefully remove :  Sum
i) The damaged sections of the wood baseboard and wooden floor boards cart away all materials from site.
ii) Remove all the existing kitchen low level and wall hung cabinets ( low level cabinets 12000mmx600mmx900mm  and marble tops and wall mounted high level 
cabinets 6000mmx350mmx700mm , 1900mmx1120mmx900mm. Mixers and cabinets to be delivered to warehouse.
iii ) Hack away the existing floor tiles in the kitchen and cart away debris and prepare surface to receive new tiles.
iv) 4 No. Bathrooms‐ carefully remove existing shower heads,shower mixers,toilets,counter top sinks,low level cabinet with a marble top,all bath appliances (towel 
rack, shower curtain and curtain rod, mirror,sink faucet etc) and deliver to warehouse at ridgeways.
v) Remove all existing windows, clean the window openings, plaster and finish the window accordingly in preparation of new windows to be delivered to 
warehouse..  
 vi) Carefully  remove  all existing internal timber and flush doors and frames standard size 900 x 2100mm ,as per attached door  schedule and deliver to GSO 
warehouse for auction,make good the wall to receive new doors. 
vii) Remove the existing grills on existing interior walls that separate the Corridors from the Family Room and Dining to the roof slab above. 
viii)  Remove all external Mild Steel Grills on windows
ix) Remove existing aluminum doors and grills on doors, windows and screens along grid line 8.
x) Remove existing aluminum sliding doors at the Master Bedroom & Bedroom 2 
xi) Demolish all existing closets in the 4 bedrooms and 2 in the hallway as shown on site and take away to warehouse for disposal 
xii )Demolish the terrace roof and masonry structure to allow for reconstruction in accordance to the approved drawings and directions of the COR involve but not 
limited to removal of roof finish,gutter,downpipes,purlins,trusswork,ceiling (gypsum and T&G),eaves and make good with cement plaster the columns and beams to 
receive new roof structure.Also Remove existing roof beyond Grid 8 with all the trusses and leave original parapet wall for painting and installation of pergolas as 
shown on Construction drawings . Load and cart away from site

FLOOR REPAIRS
3 Supply all tools,labour and equipment to hack away the floor slab 250mm thick upto the sub base. SM 300
4 Supply all labor, tools, material and equipment to compact the disturbed sub‐base. SM 300
5 Supply all labor, tools, material and equipment to install a new Hdpe dam liner for damp proof membrane, supply and install new BRC A142 for reinforcing the  SM 300
concrete slab, apply master seal waterproofing(masterseal 588 and master emaco 488) solution on the wall sides facing adjacent to the foundation.
6 Supply all labor material tools and equipment to pour a class 25/20 vibrated and reinforced concrete slab 150mm thick steel finished to receive concrete floor. Cure  SM 300
for 28 days
7 Supply and install 1200mm x150mmx20mm  T&G Mahogany timber strip in english bond pattern ‐ inclusive of all sanding,application of sanding sealer,finished with  SM 175
clear polyurethane varnish atleast three coats to Arch/COR approval 
8 Mahogany timber Skirting LM 225
9 Supply and install 600mmx600mm x8mm porecelain tile complete with skirting for  the terrace  and entry porch . All tiling shall be installed with 2 mm spacers,  SM 80
adhesive and groutings to Architect/COR approval.

DOOR REPAIRS
i) Burglarproofing Grilles on the outside for each door.All new installed grills shall be painted in an oil based paint to match the Aluminum doors. The color shall be 
selected from Duracoat/ Crown Paints manufacturer's standard range of colors by the Arch./COR. Security doors ‐ Install new 12.5 x 12.5 x 3 mm square grilles and 
screens on all doors along gridline 6.6 as shown on the Door Schedule provided
ii) Field verify all door openings prior to fabrication.Contractor shall install 1 door sample for review and approval by Architect/COR with all door hardware 
accessories including door stop prior to proceeding with the rest of the installation.  
iii) All door to have Hafele locks and handles, retractable mosquito gauzing mesh on the sliding part
10 i) Supply and install new well seasoned and dry high quality 50 mm thick mahogany T&G double leaf with side glass solid wood external door of size  each 1
1700mmx2400mm with inbuilt wooden handle
ii ) To include corresponding 50mm thick x 250mm wide x2400mm high  mahogany door frame at the transom, 
III) 25mm thick x 75mm wide mahogany architraves and quarter round, anchored by four pcs of 6 inch concealed/hidden door hinges as 180 degree swing zinc alloy 
heavy duty hinges, and one piece 3 level high security mortice lock hafele or equivalent.
iv)  All external doors shall have permanent ventilation, handles, mosquito gauzing and shall be installed with approved sealant. 
v) Varnish and sand all doors and frames and apply two coats of clear polyurethane wood varnish    
11 Supply and install new Powder coated finished aluminum framed ‐ double glazed door, 8.4mm thick clear tempered laminated glass; Including fixings, fittings and all  No. 3
necessary accessories as per Drawings and Specifications complete with Hafele locks and handles . Each door to have 4 panels with 2 sliding panels and 2fixed panels
Sizes : 2 ‐ 3150mm wide x 2040mm 
12 Supply and install new Powder coated finished aluminum framed ‐ double glazed window at 500mm from AFF , 8.4mm thick clear tempered laminated glass;  No. 2
Including fixings, fittings and all necessary accessories as per Drawings and Specifications . Sizes : Fixed doors‐ 1950mm wide x 2400mm each

13 Supply and fix well seasoned,dry and high quality mahogany cladded solid wood internal doors size 900x 2100mm to include corresponding 50mm thick x 200mm  No. 5
wide mahogany door frame overall height 2100mm high with an intermediate member(transorm) at 2100mm from floor level,25mm thick x 75mm wide mahogany 
architraves both sides, glass and all the necessary ironmongeries. Make good the wall and floor as necessary and re paint to original status.
14 Supply and fix well seasoned,dry and high quality mahogany cladded solid wood internal doors size 900x 2100mm to include corresponding 50mm thick x 200mm  No. 8
wide mahogany door frame overall height 2100mm high without transorm at 2100mm from floor level,25mm thick x 75mm wide mahogany architraves both sides, 
glass and all the necessary ironmongeries. Make good the wall and floor as necessary and re paint to original status.

15 Supply and fix 50mm thick mahogany External door (as per attached sample photo pattern) size 900x 2400mm to include corresponding 50mm thick x 250mm wide  No. 1
mahogany door frame overall height 2600mm high with an intermediate member(transform) at 2400mm from floor level,25mm thick x 75mm wide mahogany 
architraves both sides, glass and all the necessary ironmongeries. Make good the wall and floor as necessary and re paint to original status. ‐ External pantry storage 
door

WINDOW  REPAIRS
i). Powder Coated Aluminium Windows complete with 50 x 75 x 3 mm bronze aluminum frame , Glazing Beads, Gasket Strips, Infilled Tinted with 6 mm tinted bronze 
glass, cast‐in place window Cills & internally boards and Iron Mongery 
ii) Burglarproofing Grilles on the inside for each window with 12.5 x 12.5 x 3 mm square grilles with 37.5 mm x 37.5 mm, Gauge 16  on the interior side of the house 
as shown on the Window Schedule provided.  The frames shall be anchored to the window and door openings with anchor bolts which shall be concealed after 
installation. Contractor shall provide grill sample for review and approval by Architect/COR prior to proceeding with the rest of the Installation.All new installed grills 
shall be painted in an oil based paint to match the Aluminum windows.  The color shall be selected from Duracoat/ Crown Paints manufacturer's standard range of 
colors by the Arch./COR. All 4 No. bedroom windows to be installed with  Window escape grill complete with release mechanism (WEG) 
iii) Supply wrought iron curtain rods complete with sliding rings and fittings except in the kitchen and bathroom windows 
iv) All windows  shall have permanent ventilation, handles, mosquito gauzing on the bedrooms and  kitchen windows shall be installed with approved sealant.   
Contractor shall field verify all openings prior to fabrication of the windows.   
v) Contractor shall install  window sample for review and approval by Architect/COR prior to proceeding with the rest of the installation.Refer to Aluminum  window 
schedule for the design.  
16 Window overall size( 2400 mm x  1200mm high)  No. 8
17 Window overall size( 600 mm x 1050 mm high) No. 13
18 Window overall size( 2400 mm x 1050 mm high) ‐  No. 7
19 Window overall size( 2000 mm x  900mm high) ‐rotunder . Supply 4 sliding windows complete with grillage and mosquito gauze and 4 fixed window No. 8

KITCHEN REPAIRS  REPAIRS 
All materials samples to be submitted for approval before commencing. Contractor to remove all construction debris and waste. Contractor must adhere to all 
warranties and manufacturer specifications. Contractor to clean and commission before handover. Installation and fabrication to include the cost of materials, labor, 
profit, and all incidental charges
20 Install new porcelain floor tiles (600 mm x1200mm ). Prep and level substrate—set true to plumb. Install grey fortified thinset mortar as a base for all floor tiles. Use 
SM 31
polymerized adhesive. Grout should contain white cement admixture and color to match color of tiles. Clean and polish tiles.
21 Supply and install cabinets low level cabinet total size wxhxl {600mmx900mmx10000mm} and wall hung cabinets {w=350mmxh=700mmxl=8800mm} made 
waterproof cabinet carcasses.Carcass material should be boiling waterproof plywood (BWP) 18mm thick  for floor‐mounted and wall‐mounted cabinets ,cabinets 
and drawer frames to be finger jointed, a waterproof board on the sink wet area and waterproof ply backers on the areas adjacent to the external wall. Use well 
seasoned and high quality Mahogany closet doors varnished to Architect/COR approval  for all cupboard doors and drawer faces.
The Contractor shall complete with all base cabinets, uppers, backs, gables, cabinet tops and bottoms, base toe kicks, cabinet shelving, adjustable shelving, lazy  SM 16
susans, door’s and drawer fronts, and all accessories such as drawer hardware and inclusive slow closing drawer slides, door and drawer handles etc. all for a 
complete installation. Each cabinet to have at least one adjustable/removable shelf. Cabinet gables will be the same finish as the cabinet doors. Coordinate cabinet 
construction with related ironmongery. Install new drawer organizers, and adjustable shelving. Use heavy gage, quality hardware and drawer slides (must support 
100 lbs).
22 Supply and install 20mm thick countertop from ceasarstone (samples to be approved) 600mm wide with rounded edges. 100mm high X 20mm ceasarstone 
LM 12
backsplash to entire perimeter, including all fixing elements and all necessary cutting, polishing and accessories to complete the works.
23 Ceiling. Remove exisiting gypsum board ceiling and replace with waterproof gypsum board painted apply on gypsum ceiling one undercoat (Crown chlorinated 
SM 31
Rubber alkali resisting primer.) and minimum two finishing coats crown chlorinated rubber paint inclusive of 75mm polyurethane cornice.
24 Supply and install "subway tile" Super White Matt Bevelled: Ceramic Tile  100mmx300mm wall tiles laying true in vertical level tiles using polymerised adhesive, 
Polish the tiles using soft and dry cloth upto mirror finish. Installation to include the cost of materials, labor and all other incidental charges complete true to the  SM 14
manufacturer's specification and direction of Engineer.
25 Lump 
Supply and fix a 16 gauge stainless steel sink [Double bowl, single drain] including new pull‐out faucet mixer, drainage and plumbing works associated with it. 1
Sum
26 Supply and fix new shelving inside the pantry storage area made from laminated plywood  boards  size 450mm wide x 300mm deep x 18mm thick plyboard from AFF 
LM 15
to Ceiling

BATHROOMS UPGRADES
27 Floor preparation. Hack away the existing floor tiles and rescreed the floor, waterproof all floors,and prepare the hacked surface to receive new tiles. SM 21.8
28 Wall preparation Hack away the existing wall tiles for the master bathrooms, cart away and prepare walls through plastering the walls, to receive new tiles and 
SM 121.51
paint.
29 Wall tiling: Supply and install matt porcelain wall tiles 600mm x300mm from tile complete with border tile and carpet laying true in vertical level tiles set using 
polymerised adhesive (6mm thick layer applied directly over finished floor without any backing course) laid after application slurry using 1.75Kg of cement/Sq.m 
below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles and polishing the tiles using soft and dry  SM 121.51
cloth upto mirror finish, include edge tile  complete including the cost of materials, labour and all other incidental charges complete true to the manufacturer's 
specification and direction of COR
30
Floor tiling: Supply and install matt porcelain floor tiles 600mm x300mm from tile and carpet laying true in horizontal level tiles set using polymerised adhesive 
(6mm thick layer applied directly over finished floor without any backing course) laid after application slurry using 1.75Kg of cement/Sq.m below mortar only, joints 
SM 21.8
grouted with admixture of white cement and colouring pigment to match with colour of tiles and polishing the tiles using soft and dry cloth upto mirror finish 
complete including the cost of materials, labour and all other incidental charges complete true to the manufacturer's specification and direction of COR
31 Apply and finishing wall surfaces with one coat of Interior Primer and two coats of interior premium silk Emulsion paint of approved shade and specification after 
scrapping, brushing and water washing thoroughly the existing wall surface to make it free from foreign matter including preparing the surface by applying 
SM 10
crackfilling material,internal grade touchup wall putty to all cracks , crevices and uneven patches to make the surfaces uniform. Cost to include cost of all material, 
labour and other incidental charges  complete as per specification 
32 Shower screen: Supply and install new tampered glass 10mm shower screen 2136mm wide x 2100mm each 4
33 Vanity Cabinet: Supply and install on site new wallhung low level cabinet set with corian/ceasarstone and backsplash with one sink cutouts top as per drawings, 
each 4
include new wall hung mirror 900mmx1170mm and LED mirror lights anchored 
34 Ceiling. Supply labour tools, material and equipment to install new 9mm waterproof gypsum board incuding the alluminum studs framing painted apply on gypsum 
SM 22
ceiling one undercoat (Crown Chlorinated Rubber alkali resisting primer.) and minimum two finishing coats crown chlorinated rubber paint.
35 Lump 
Supply all labour material and equipment to install a three recessed niche shampoo holders 12inches x 12inches, four towel racks,four towel rings, four toilet paper 
1
roll holder, four toilet brush holder and four floating shelves, one tub grab rail and robe hooks Sum
36 Install of client supplied sanitary appliances: Take delivery,supply all expert labour,tools and equipment to install the below items:  Lump 
1
1.Concealed cistern and toilet bowl 2.Bathtub 3.Undermount wash hand basin 4.Sink faucet 5. Shower faucet Sum
37 Lump 
Supply all labour material and equipment to install  4 new exhaust fans in the bathrooms 1
Sum
38 Supply and install new rectangular, powder coated aluminum alloy framed 3 no. wall hung mirror 600mm wide X 1650 full length mirror and a 550mmx300mm wall  Lump 
1
hung medicine cabinet in the 3 bathrooms Sum

ROOF REPAIRS  : 
Unless otherwise stated the quote shall include : 
i) Testing waterproofing by storing water as directed by Architect/COR . Incase of failure or leakages , the contractor to  carry out remedial measues as suggested . In 
exteme cases , the contractor to re‐do the entire waterproofing after breaking the faulty one. No extra payments to be done
Supply labor, material, tools and equipment to construct a new terrace roof structure made from well seasoned and treated cypress timber,  rafters sized as  SM 22
250mmx50mm spaced at 600mm c/c,installation of new  T&G wood decking sized at 150mmx25mm thick ,Installation of new modified bitumen 
39
underlayment,Install of new two‐way wood batten system 40mmx25mm cross section,Installation of new mechanically fastened terracotta clay tile 
roofing,Installation of new sheet metal flashings,all exposed wood to be varnished and or painted to approval.
Install new 200 mm reinforced concrete slab  reinforcement work T16 bars , fairfinish formwork, vibrated concrete class 25/20 casting between Grids 6.6D.5 & 8D.5  CM 5
40 as shown on the Construction Drawings and 6.6F.3 & 8F.3. Install Sika waterproofing and finish with 50 mm screed sloped to the existing gutter

PERGOLAS:Construct a pergola size a 2.4metre high and plan size of 6300mmx5632m,made from painted 3mm mild steel sections and covered in translucent  NO 2
material.
1) Tie beam/Support rafter 150mmx50mmx5632mm horizontal members
41 2) Rafter 150mmx50mm corbelled rafters spaced at 600mm c/c.Sloped at lesss than 5 degrees
3)Ledger bearer beam 150mmx50mm anchored on the concrete beam at the main house.
4)Paint all the installed pergola members with external oil based (Mahogany finish) paint to Architect/COR approved sample. The Arch./COR shall select the paint 
sample from Duracoat/Crown Paints manufacturer's standard range of colors.
T& G repair and varnishing:Eaves,entrance and living area rotunder. SM 120
42 Supply all labour material and equipment top snad down the T&G ceiling and eaves ,replace damaged and rotten sections (5%) eaves area with similar wood finish 
and revarnish with at least 3 coats of polyuretahne varnish to approval of the architect.

Supply all labour material tools and equipment to repair all worn out roof membrane upon inspection. SM 200
Surface preparation is the most critical procedural requirement in paint applied coating systems. Remove all loose particles, delaminated paint, oil, grease, laitance, 
efflorescence, mild, mildew and other foreign materials.  Areas shall be first scraped, swept clean, and then thoroughly power washed.  Use high power adjustable 
43 pressure washer with a minimum 3500 PSI (Pounds per Square Inch) mechanical spray device.
Apply Aquaflex Roof HR ,replace the  downpipes with 6inch pvc pipe inclusive of all accessories and install 6 inch new collector drains. 8 number of connections at 
3500mm length.
Repair the concrete gutter on the roof in accordance to the drawings and specifications provided in APPENDIX 3 using an elastomeric system topps (Siliconized  SM 135
Solvent Based) or equivalent with reinforcement mesh.
•Inspect and repair damaged concrete deck areas and prepare for new roofing
44
•Repair perimeter masonry parapet walls.
•Installation of new sheet metal flashings.
•Install five coat solvent‐based elastomeric coating with reinforced fabric system.
Supply materials,labor and equipment for thorough cleaning the brick tiles(wirebrushing) to remove Mildew, leaves on the roof at the main SM 150
house and entry porch,preparing surface and applying at least two coats 1st grade brick red paint to match,Fabricate & install metal gutter with all the outlet bends 
45 including priming as before size 220mmx180mm as per issued drawing inclusive of metal gutter , specification andguidelines by the COR made from 22 gauge sheet 
metal=58 metres.
Roof area=150 sqm.Gutter=58 metre
MASONRY WALLING & PAINTING : 
The first is the rough nail rendering (mix 1:1) cement sand; the second is the undercoat 13mm (mix 1: 3 :0.25) cement:sand:lime,according to specifications and 
drawings 
46 i). Build masonry with 200mm stone  wall to a height of approximately 1000 mm above the finished floor slab to create window openings of 2400 x 1050 mm high to  SM 10
match exterior window openings at Master bedroom and Bedroom 2 
ii). Plaster walls the first is the rough nail rendering (mix 1:1) cement sand; the second is the undercoat 13mm (mix 1: 3 :0.25) cement:sand:lime,according to 
specifications and drawingson to receive paint and textured paint on the exterior.
47 i )Extend the walls to the slab above above with 200 mm wide masonry walls.   SM 9
ii). Plaster walls the first is the rough nail rendering (mix 1:1) cement sand; the second is the undercoat 13mm (mix 1: 3 :0.25) cement:sand:lime,according to 
specifications and drawingson to receive paint and textured paint on the exterior.

EXTERNAL WORKS
48 Exterior parapet walls 
i) Remove and scrap off exterior paint on walls and parapet walls and prepare walls for installation of new wall copings per details provided by Arch./COR.  
ii)  Install new continuous 325 x 125 mm high Class 25 cast in Place Concrete wall coping on all parapet walls to protect the walls below.  The coping shall have 12 
mm throat. 
iii) Contractor shall do a sample for review and approval by Architect/COR prior to installing the coping on all parapet walls.  The wall coping shall be finished with 
clear coat sealant.  Lumpsum 1
49 External pavement around the house and the outdoor sitting area , relevel and replace broken slabs , wire brush  varnish and re‐grout Mazeras  Lumpsum 1
50 Planter area ‐ demolish the planter partially , retile and replant complete with plant as per selection by the Architect Lumpsum 2
51 Drains ‐ Terrace‐Supply labour material tools and equipment to construct a french drain system comprising of a 300mm wide by 450mm deep trench, buried  LM 15
perforated 4inch pipe,covered in geotextile fabric and filled with 3/4inch stone ballast.

WARDROBES /CLOSETS UPGRADES
Contractor shall provide Shop Drawings after field verifying all dimensions of the wardrobes for review and approval prior to fabrication. Contractor shall provide 
samples of 20 mm particle board for the carcasses and exterior mahogany finish for review and approval by Arch./COR prior to installation.  
52 Replace wooden 3 No. bedroom and  3 No linen closets(entry and corridor) , including doors, drawers, shelves and dividers.Cabinets On high quality particleboard uv SM 35
high gloss premade and not assembled on site: Rates shall include (but not be limited to):Complete fabrication and hardware application and other work before 
delivery to the project site. Install solid particleboard panels plumb, level, true, and straight with no distortions. Anchor securely to adjoining structure. Use fine 
finishing nails for exposed nailing as needed. Closet doors to be made of high quality welll season and louvred mahogany doors , as per approved finished. Replace 
the entire closet cabinets and doors as per below sizes LXH {1 NO 2.605x2.65M 4 DOOR}, {1 NO 2.60Mx2.71M 4 DOOR }, {1 NO 1.68MX2.71M 3 DOOR}, {1 NO 
2.7Mx2.7M 5 DOOR}, Include slow close ball bearing drawer slides and matt stainless steel door handles. Supply and install new closet rods and shoe racks.

INTERIOR & EXTERNAL PAINTING 
a) The surface must be dry and clean before painting.
b )All painting works should provide the required coverage.
c ) All paint works must be according to specifications , drawings and supervisor engineer instructions.
d )Smoothen surfaces of exisiting plastering before the Commencement paint
53 Exterior painting : SM 211
Prepare suface and paint at 3 ‐5 mm textured external premium grade silicone based paint from Duracoat or Crown Paints. Contractor shall do samples for review 
and approval by Arch./COR to select final paint sample inclusive of all surfaces with terracota paint.
54 SM 711
Interior Painting.
Scrape off all paint and then apply and finishing wall surfaces with one coat of Interior Primer and two coats of interior premium silk Emulsion paint of approved 
shade and specification after scrapping, brushing and water washing thoroughly the existing wall surface to make it free from foreign matter including preparing the 
surface by applying crackfilling material,internal grade touchup wall putty to all cracks , crevices and uneven patches to make the surfaces uniform. Cost to include 
cost of all material, labour and other incidental charges  complete as per specification 
55 Ceiling SM 300
Scrape off all paint and then apply and finishing  ceiling surfaces with one coat of Interior Primer and two coats of interior premium silk Emulsion paint of approved 
shade and specification after scrapping, brushing and water washing thoroughly the existing wall surface to make it free from foreign matter including preparing the 
surface by applying crackfilling material,internal grade touchup wall putty to all cracks , crevices and uneven patches to make the surfaces uniform. Cost to include 
cost of all material, labour and other incidental charges  complete as per specification 

Totals